1. Assisting analysis and design of RCC structure and drafting through Auto CAD.
2. Estimating and costing of the project.
3. Site supervision etc.
1. Supervising Quality of Pre cast erection, related R.C.C and land development works.
2. Making daily schedule and managing approval paper.
3. Participating inspection with Resident engineer, dealing with them if any problem arise and managing approval.
3. Using level machine to check deflection of floor and slab and making report on it.
4. Using theodolite to check verticality and alignment of the building and making report on it.
5. Crack inspection on PC elements, choosing repair method and making report on it.
6. Making report on any problem and suggested solution to submit to the manager and to RE according to their requirement.
7. Giving direction to sub contractor about quality and materials use.
8. Cost optimization.
9. Responsible for max. three 10-storyed building for supervision at a time ( total 22 building).
10. Modifying any addition, presentation or correction in drawing.
11. Checking Health and safety of workers while supervision.
12. Played Big role to write PC construction hand book for the project.
1. Supervising Quality of Pre cast erection, related R.C.C and land development works.
2. Making daily schedule and managing approval paper.
3. Participating inspection with Resident engineer, dealing with them if any problem arise and managing approval.
3. Using level machine to check deflection of floor and slab and making report on it.
4. Using theodolite to check verticality and alignment of the building and making report on it.
5. Crack inspection on PC elements, choosing repair method and making report on it.
6. Making report on any problem and suggested solution to submit to the manager and to RE according to their requirement.
7. Giving direction to sub contractor about quality and materials use.
8. Cost optimization.
9. Responsible for max. three 10-storyed building for supervision at a time ( total 22 building).
10. Modifying any addition, presentation or correction in drawing.
11. Checking Health and safety of workers while supervision.
12. Played Big role to write PC construction hand book for the project.
1. Preparing of project requirements.
2. Preparing of measurement sheet for billing.
3. Preparing of all kind of estimation works.
4. Supervising the construction works with quality.
5. Checking of Re-bar fabrication works.
6. To solve all kind of project difficulties.
7. Reporting to headquarter.
8. Checking the bill of subcontractor.
Additional duties for this company
i) Preparing BOQ for any new project.
ii) Making project schedule.
iii) Collecting. preparing and submitting tender documents.
iv) Communicating with domestic and foreign client.
v) Attending important meeting with client and consultant.
vi) Collection another project progress