Assistant Resident Engineer | Senior Sustainability Engineer
UNii Engineering Consultancy
Total des années d'expérience :18 years, 1 Mois
Key Responsibilities:
• Acting as Assistant Resident Engineer, reporting to the Project Manager, Project Director, Sustainability Director, and Managing Director
• Construction supervision for civil, landscape, sustainability, deputy for architecture at Sea Palace
• Project specifications, design verification, materials review, BOQ revision, progress reports, etc.
• Landscape architecture
• Estidama and GSAS submissions/reports/assessments/calculations/studies
• Trakhees EHS GBR, Dubai GBR calculations/studies
• Liaising with contractors, sub-consultants, suppliers, authorities
• Coordination with design team for integrated design approach towards sustainability
Main Project: Sea Palace Development | Abu Dhabi Royal Family Residential Project
• Master Plan Landscape: 18 hectares of hardscape, softscape, water features, water tanks, plazas, trellis, covered parkings, 3 km of roads, infrastructures: storm water, sewage, potable water, chilled water, fire fighting, irrigation,
power, lighting.
• Marine Works with 600m of Rock Revetment, 500m of Pontoons, Gangways, Private Beaches
• Main Palace Grand Stair, Glass Pavilion, Small Pavilions, Security Point Gates, Sunken Court, Kids Play Areas
• Multi Purpose Sports Court
• Entertainment Pavilion: 2, 600 m2
• Horse Arena Building: 1, 300 m2
• HHS Villa 1: 7, 000 m2, HHS Villa 2: 3, 500 m2, HHS Staff Accommodation: 1, 500 m2
• Responsible for construction supervision for civil engineering, landscape, sustainability, and deputy for architecture
• Responsible for Consultant's weekly and monthly progress reports
• Review of DCRs, BOQs, weekly and monthly progress reports, pre-qualifications, method statements, material submittals, design proposals and modifications, shop drawings, as built drawings, cost and time variations, O+M manuals, handing over documents
• Monitor the quality of materials, workmanship, and performance through inspections, instructions, snagging, NCRs, replies to RFIs, etc. according to the contract documents related to five Main Contractors
• Attending project coordination meetings and progress meetings
• Responsible also for the Estidama study, implementation of credits, calculations, reports, etc.
• Reporting to the Project Manager and Managing Director
• Status: construction finish stage
Key Responsibilities:
• Project coordination
• Proposals presentations and reports
• Estidama, Trakhees EHS GBR, LEED assessments/submissions/calculations/studies
• Environmental and utilities systems studies
• Landscape architecture, solar LED street lighting
• Wet services demand/load calculations
• Liaising with clients, authorities, sub-consultants, suppliers
• Reporting to the Project Manager and Managing Director
Key Responsibilities:
• Project coordination
• Trakhees EHS GBR, Dubai GBR, LEED assessments/submissions/calculations/studies
• Environmental and utilities systems studies
• Liaising with clients, authorities, sub-consultants, suppliers
• Reporting to the Managing Director
Key Responsibilities:
• Building physics dynamic analysis: solar, daylighting, lighting, thermal, energy, carbon
• Part L and CfSH assessments/calculations/studies
• Research/study on carbon neutral housing
• Reporting to the Managing Director
Key Responsibilities:
• Climate responsive design and solar study
• Passive earthduct ventilation study
• Drafting, 3D modeling