Technical Engineer
Aquarius
Total years of experience :11 years, 2 Months
I study Electronic Engineering in Cnam, i have about 4 years of
experience due to working in a company specialized in Electronics (5 months) (S&AS)
and the second is an industrial company that i’m still working in as a Technical Engineer
● Programming PLCs (Siemens, Crouzet, Omron...)
● Automation and HMIs Interfaces programation
● Electrical and mechanical Installation of plants in buildings
● Passed a training in iTEC on BECKHOFF BMS components and
protocols overview, plus examples of some BMS application on TwinCAT.
● Designed Electrical Panel Board Drawings for swimming pools,
submersible pumps, jacuzzis, reverse osmosis plants, water treatment plants.
● Sufficient knowledge of BMS and EIB
● Wiring, connecting and programming VFDs, Inverters, and multiple sensors.
● Analysed multiple samples of water. Looked and Came up with solutions for the bad ones.
● Gone on site to troubleshoot multiple electronic interfaces such as an ozone sensor, a chlorine controller, an ORP controller...
● Excellent in using AutoCad, drawing electrical design for panel boards.
● Handled many water treatment mechanical drawings.
● Programming multiple interfaces (Oasé controllers, Autonics Controllers,
ProMinent Controllers, ORP and pH Controllers)
● Handled and repaired Pumps. Disassembled and assembled it until i became good at working on it by myself.
● Executed many panel boards thus becoming familiar in handling
electrical components.
● Managed a department with the department manager containing 6 technicians, handled all the paperwork, emails, and Microsoft Office work.
● Became familiar in water treatment terms, such as TDS, Cl, pH, Fe, Mg, Turbidity, NaCl...
● Learn to take action and improved my authority.
● Repairing multiple electronic materials.
● Made contact with many clients and suppliers, making me adjust to many situations, and enhancing my flexibility.
● Learned a lot of skills about PCBs, soldering, microchips.
● Got a certificate for completing about 5 goals in my time working there
● Took a deeper view about elevator control modules, Worked about a month on VVVF motors (Variable Voltage Variable Frequency).
● Worked on a machine that places parts on a PCB board
● Soldered about 500 parts on a PCB board
Studying Electronic engineering in Cnam.