Senior Surveyor
Elli house reservoir
Total years of experience :2 years, 9 Months
Client: National water supply and drainage board
Main project features: Greater Colombo water & wastewater
management improvement investment programme
Client: Qatar Gas
Main project features: : Capacity of 54, 000 barrels per stream
day (BPSD) of diesel, Cost: US$ 96 million,
Main project features: : 14 Residential buildings each 5 story
building with underground parking, Cost: US$ 275 million,
Positions held: Land
Client: Shell Gas, Qatar petroleum
Main project features: Access road and Earth works to waste cell
Positions held: Land
11. Detailed Tasks
Assigned
12. Work Undertaken that Best Illustrates Capability to Handle
the Tasks Assigned
* Check the elevations, the
setting out and rest of
survey work by the
contractor are required to
ensure accuracy.
* Advise the Resident
Engineer and recommend
actions concerning
construction surveys.
* Maintain the construction
surveys and quantity
records as per the RE
instructions.
* Perform the initial baseline
and control surveys
including establishment of
bench marks and recovery
of any existing survey
monuments to be removed
at the start of the project as
directed by the RE.
* Attend the Contractor’s
request for surveys,
including the checking of the
Contractor’s setting out of
centerlines, structures,
slope stakes, etc.
* Check the field
measurement surveys
including original and final
cross sections, check critical
elevations, dimensions and
locations of structural
elements, earthwork
grading, pavement and
appurtenances, check the
Contractor’s detailed survey
in advance of construction
operations, investigate and
clarify survey discrepancies.
Name of assignment or project: supplying and laying of 9.0 km
DI pipes (1200mm diameter)and accessories from Ambatale
Activities performed:
Construction survey
* Establish both horizontal
& vertical control points
* Setting out points
* Prepare AutoCAD
drawings for site use
Name of assignment or project: Mahawali River Development
Research
4
established by the Resident
Engineers and Senior
Highway Surveyor.
* Keeping complete records
of work executed daily.
* Checking of as-built works
for conformance and ensure
as built survey of the
completed works is
recorded for project hand-
over.
* Assisting the planning and
quantity surveyor teams
with progress and
measurement of the works.
at-grade signalized intersection
* Earth work for Underpass and flyover
* Setting out for 8 lanes way in each direction
* Establish primary horizontal
and vertical control points
* Ensured that charts and
drawings were accurate and
made necessary
adjustments.
* Confirmed that surveying
techniques conformed to
quality control procedures.
* Maintained and updated
records of all survey
information and data
collected.
* Provided technical support
to any other surveyors
involved with each project.
* Ensured that all data from
surveying expeditions was
safely stored.
* Prepared surveying reports
for architects and project
engineers.
Name of assignment or project: Buraj Damac -Marina-com 036
5
* Establish both horizontal
& vertical control points
* Setting out points
* Prepare AutoCAD
drawings for site use
* Mark levels for structure
Name of assignment or project: Laffan Diesel Hydrotreater
Main project features: 20 story building with underground and
multi-level parking Cost: US$ 110 million
3
* Ensure quality goals are
achieved on the project and
oversee implementation of
quality procedures on the
road works.
* Participate in the format and
standard procedures for
calculation and
documentation of quantities.
* Involve in the calibration
and checking of the survey
instruments.
* Involve in the as-built review
and finalization in
coordination with RE’s,
ARE, and inspectors
* Report to Chief Surveyor
Regarding Daily activities
and data requirement for the
site work
* Coordinate with Civil,
Electrical and Irrigation
Engineers regarding
setting-out and as-built and
shop drawing
* Arrange Surveyors to work
as per the site work
pressure and coordinate
with them and assist them
to resolve problems and
help them to find one
solution.
* Checking with Consultation
Surveyor regarding
Inspection Request for site
work and As-Built Surveyor
and Shop Drawing.
Name of assignment or project: : Construction Package CP10-
C2
Year: November / 2014 to: November / 2016 (2 years 0 months)
Location: Lusail -Qatar
Client: Lusail Real Estate Development Company (LREDC)
Main project features: Construction Package CP10-C2 is a
primary infrastructure package being constructed as art of overall
Lusail development and its located 22 km north of Doha and
covers 35km2 of land and water. Construction and completion of
landscape and related works for Roads A1, A2, D2, D3, AA5-1, E4,
A5, A5-2 and F30.
URL removed due to policy violation. Please contact support for further information.