Nipson Arroyo Tigreros, Mechanical Supervisor

Nipson Arroyo Tigreros

Mechanical Supervisor

QAIWAN GROUP

Location
Colombia
Experience
36 years, 7 Months

Share My Profile

Block User


Work Experience

Total years of experience :36 years, 7 Months

Mechanical Supervisor at QAIWAN GROUP
  • United Arab Emirates
  • January 2015 to January 2018
Mechanical Supervisor at QAIWAN GROUP
  • United Arab Emirates
  • January 2005 to January 2018

Project & Value
750 MV Combined Cycle Power Plant (CCP), USD 400 Million
4 GT -Gas Turbines Frame 9E - General Electrical - GE - 125 MWs X 4 Project Scope Construction, Asset, Operations & Maintenance Project Description The Bazian Combined Cycle Power Plant Project is located in Sulaymaniyah, Iraq. The power is generated at 15 kV in the Combustion Turbine Gas and 15.75 kV

Mechanical Supervisor at MASA STORK
  • Colombia
  • January 2005 to January 2015
Mechanical Supervisor at MASA STORK
  • Colombia
  • January 2005 to January 2015

Mechanical Specialist
Employer MASA STORK, Villavicencio, Colombia Project Value USD 120 Millions Project Description The installations include TermoOcoa - One LM6000 General Electric - G.E. 60 MWs With all auxiliary equipment to operate on Diesel Fuel and Natural Gas Fuel and Termosuria One LM6000 General Electric - G.E. and One LM2500 General Electric both with a capacity installed of 75 MWs With all auxiliary equipment to operate on Diesel Fuel and Natural Gas Fuel.

Key roles
-
Asset & Operation Phase
• Ensure that safety and health measures are adhered to on site with zero safety violations.
• In charge of the management of site activities including planning, organizing, integrating and monitoring of resources such as labor, tools and technical assistants as required to complete the work scope according to contractual requirements. Supervisor has extensive experience in the Repair/Maintenance/Operation of Power Generation (gas/steam turbines) and associated auxiliary equipment.
• Perform preventive, predictive and corrective maintenance for Turbine auxiliary systems and equipment: lubrication system, hydraulic system, hydraulic starter system, liquid fuel system (Fuel Oil Separators), natural gas system, cooling system gas systems, inlet air system and cooling system. Workplace Colombia.
• Perform preventive, predictive and corrective maintenance for Power Plant auxiliary systems and equipment: Fuel System (Westfalia separators), Cooling Water System, Water Plant and Gas Pressure Regulated System - GPRS, firefighting system
• Perform preventive maintenance of Electrical Generator. Brush. Filter Changes, Maintenance to lubrication pups.

Major Maintenance
• Upgrade existing LM5000 gas turbine in Termoocoa with a newer model LM6000 that has higher simple cycle output and eficiency. Perform work as Turbine Mechanics under supervision of General Electric - G.E.
• Support for Borescope Inspection for LM5000, LM6000 and LM2500 Gas Turbines.
• Hot Section Maintenance. For LM5000 and LM6000. Maintenance performed 12, 500 Hours in operation with Diesel and 25, 000 Hours in operation with Natural Gas. Perform work as Turbine Mechanics under supervision of General Electric - G.E.
• Major Maintenance. For LM5000 and LM6000. Maintenance performed 25, 000 Hours in operation with Diesel and 50, 000 Hours in operation with Natural Gas. Perform work as Turbine Mechanics under supervision of General Electric - G.E.
• Supervise installation of gas station. 900 Psi Carry out hydrostatic tests on gas line with nitrogen at a pressure of 1, 000 Psi.

Experience from 1995-2005

Specialties & Skills

CONSTRUCTION
GAS TURBINE
TURBINES
CORRECTIVE MAINTENANCE
OPERATIONS
PREVENTIVE MAINTENANCE
REFRIGERATION
INSTRUMENTATION
BORESCOPE
CALIBRATION

Languages

English
Expert
Spanish
Expert