Senior civil
Hamza Associates.
مجموع سنوات الخبرة :8 years, 8 أشهر
- Project: Madinaty and New Capital. B12 and CELELA and village
-Scope of work: (Soil works (Piers Piles) - P.C Foundation - R.C Foundation- R.C columns and Ground slabs).
-Position: Senior civil site & technical office
-Owner: Arabian Company for Project and Urban Development.
-Project Manager: Dar al-handasah shair and partners.
-Top Structural Consultant: Raafat Millar Consulting(rmc).
-Soil, Foundation & Ground slab consultant: Hamza Associates.
-Main Contractor: Talaat Mostafa Group (TMG) & Bauer Egypt
-Main contractor: SQUARE Engineering Firm
-Main contractor: Atrium Quality Contractors
- Project: Constructing Military Buildings. Constructing Military Buildings (Operating Rooms - Storage Building - Finishing work of steel tank - Finishing work of Petrol Station - Inventory Quantities of Petrol Building - Roadway).
-Scope of work: P.C.Foundation- R.C Foundation- R.C Walls - R.C columns and slabs - Finishing work (Block works- Plaster works- Ceramic Works).
❖ In (Rod Al Farag Bridge strip six in nile Cornish- shubra-cario). ❖ In (Rod Al Farag cable stayed Bridge). project brief description:
•540 m long cable stayed bridge with spans 120-300m and navigation dimension of 15*240m
•Two ways motorway bridge. 3 lanes with total width of 32m each direction
•Bridge deck hanged by 160 cables
•Two 95m height pylons achievement:
•bored piles (80cm&1m&1.5m&2m) ground & Nile
•pile capes (ground & Nile)
•columns & frames
•Abutments
•concrete pylons
•construction of pylons using self-climbing shuttering