Projects Manager - Turnkey interior fit out jobs.
Hitches and glitches under Farnek Group of companies.
مجموع سنوات الخبرة :18 years, 4 أشهر
• Execution of Project - Preparation of project execution plan and ensuring execution of all works in accordance with the approved design / drawing, engineering specification, applicable code & standards.
• Make sure the toolbox meeting daily with workers and foremen before starting the works.
• Taking the material approvals from the Consultant and client.
• Make and arrange the required manpower details and manpower arrangement according to the site requirement.
• Arrange the meeting with foreman and supervisors by once in a week for preparing the work status report and site issues.
• Estimated material requirements and costs, and presented design to client for approval.
• Finishing the projects with time bond.
• Conferred with client to determine factors affecting interior environments, such as budget, and architectural preferences, etc.
• Advised client on interior design factors such as space planning, layout and utilization of furnishings or equipment, and color coordination.
• Subcontracted fabrication, installation, and arrangement of carpeting, accessories, paint and wall coverings, art work, furniture, and related items.
• Making the as built drawing with the coordination of Draughts man.
• Preparation of interim and final payment certificate for sub-contractors
• Customer Co-ordination - Site meet / visit to access customer requirements at enquiry state and correspondence during execution of the projects.
Responsibilities:
Execution of Project - Preparation of project execution plan and ensuring execution of all works in accordance with the approved design / drawing, engineering specification, applicable code & kick of meeting.
Procurement the materials for start the project and shop drawing submission to client/consultant.
Taking site measurements and suitable quotation from sub contactor if required.
Make sure the toolbox meeting weekly with workers and foremen before starting the works.
Arrange the meeting with client or consultant as weekly bases.
Preparation of Minutes of Meeting.
Co ordination with Factory manger for the production and delivery of material on time.
Taking the material approvals from the Consultant or client
Make and arrange the required manpower details and manpower arrangement according to the site requirement.
Arrange the meeting with foreman by once in a week for preparing the work status report and site issues.
Estimated material requirements and costs, and presented design to client for approval.
Assisting the post contract team for additional Variations.
Forwarding Quality inspection Request to quality Department.
Finishing the projects within the time bond.
Confirmed with client to determine factors affecting interior and total project issues.
Environments, such as budget, and architectural preferences,
Accessories, paint and wall coverings, art work, furniture, and related items.
Making the as built drawing with the help and coordination of Draughts man.
Taking snag list with site engineers when end of the project and solutions.
collecting project completion certificate from client or
Responsibilities:
Execution of Project - Preparation of project execution plan and ensuring execution of all works in accordance with the approved design / drawing, engineering specification, applicable code & kick of meeting.
Procurement the materials for start the project and shop drawing submission to client/consultant.
Taking site measurements and suitable quotation from sub contactor if required.
Make sure the toolbox meeting weekly with workers and foremen before starting the works.
Arrange the meeting with client or consultant as weekly bases.
Preparation of Minutes of Meeting.
Co ordination with Factory manger for the production and delivery of material on time.
Taking the material approvals from the Consultant or client
Make and arrange the required manpower details and manpower arrangement according to the site requirement.
Arrange the meeting with foreman by once in a week for preparing the work status report and site issues.
Estimated material requirements and costs, and presented design to client for approval.
Assisting the post contract team for additional Variations.
Forwarding Quality inspection Request to quality Department.
Finishing the projects within the time bond.
Confirmed with client to determine factors affecting interior and total project issues.
Environments, such as budget, and architectural preferences,
Accessories, paint and wall coverings, art work, furniture, and related items.
Making the as built drawing with the help and coordination of Draughts man.
Taking snag list with site engineers when end of the project and solutions.
collecting project completion certificate from client or
Responsibilities:
Execution of Project - Preparation of project execution plan and ensuring execution of all works in accordance with the approved design / drawing, engineering specification, applicable code & kick of meeting.
Procurement the materials for start the project and shop drawing submission to client/consultant.
Taking site measurements and suitable quotation from sub contactor if required.
Make sure the toolbox meeting weekly with workers and foremen before starting the works.
Arrange the meeting with client or consultant as weekly bases.
Preparation of Minutes of Meeting.
Co ordination with Factory manger for the production and delivery of material on time.
Taking the material approvals from the Consultant or client
Make and arrange the required manpower details and manpower arrangement according to the site requirement.
Arrange the meeting with foreman by once in a week for preparing the work status report and site issues.
Estimated material requirements and costs, and presented design to client for approval.
Assisting the post contract team for additional Variations.
Forwarding Quality inspection Request to quality Department.
Finishing the projects within the time bond.
Confirmed with client to determine factors affecting interior and total project issues.
Environments, such as budget, and architectural preferences,
Accessories, paint and wall coverings, art work, furniture, and related items.
Making the as built drawing with the help and coordination of Draughts man.
Taking snag list with site engineers when end of the project and solutions.
collecting project completion certificate from client or