A.Air Conditioning System:
• The design system heat load calculation will be using the latest sophisticated
computer programs (Carrier E-20 ii) including all zone loads with economical
and actual design points. These factors are based on ASHRAE Standards.
• Duct design will be according to SMACNA standard using equal friction method
With all related fittings.
• System selection will be ducted system according to load distribution
requirements.
• Units selection will be for high performance and reliable as well as energy
conservation controls for operational condition.
• A complete set of specifications according to the American standards will be
provided describing all items.
B. Water & Sewage System
• The design will be according to National Plumbing Code (NPC) and all pumps
and pipe tests will be carried out to insure proper water and drainage distribution
system.
• Pipe selections materials, schedule will be decided according to the system
proposed and according to Code.
• A complete technical specification will be submitted for guidance of construction
procedures.
C.Fire Fighting System
• The design will be according to National Fire Protection Association code (NFPA)
and all pipe tests will be carried out to insure proper water distribution system.
• Pipe selections materials, schedule will be decided according to the system
proposed.
• A complete technical specification will be submitted for guidance of construction
procedures.
• Supply potable water & distribution networks
• Supply fire fighting water & distribution networks
• Drainage water & distribution networks
• HVAC system for each building.
,