Obiuto Onyirioha, Mechanical Engineer

Obiuto Onyirioha

Mechanical Engineer

Amecron Nig Ltd (contractor to Shell Petroleum Development Company)

Lieu
Nigeria
Éducation
Baccalauréat, Mechanical Engineering
Expérience
18 years, 8 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :18 years, 8 Mois

Mechanical Engineer à Amecron Nig Ltd (contractor to Shell Petroleum Development Company)
  • Nigeria
  • Je travaille ici depuis février 2013

Prepared and administered preventative and corrective maintenance work orders.

Collaborated with Operations Team to ensure smooth work flow and efficient operation of
four(4) crude oil production stations.

Developed and executed RCA and ORIP on plant equipment failures.

Coordinated and monitored vendor maintenance for large repairs.

Inspected equipment parts for conformance to specifications.

Performed daily inspection to ensure proactive control over Emsco continental pumps,
national pumps, caterpillar engines and generators, air and AGS compressors.

Implemented scheduled preventive and corrective maintenance on Emsco pumps, National pumps, internal combustion engines eg. Caterpillar Gas and diesel engines

Performed Fluid end Pump inspection and Power end maintenance to restore pump efficiency

Multi-discipline QAQC Inspector à MPH Global Tech (Total Upstream Companies in Nigeria)
  • Nigeria
  • mai 2012 à décembre 2012

Inspected and logged detailed records of received construction materials.

Conducted and approved CONTRACTOR welding qualification tests (WPQT, WPS & WQT)
Developed a comprehensive control database for Received lifting materials.

Inspected the construction and welding activities for the O.U.R. Pipeline (42” Dia X 19.1mm W.T) Project.

Inspected project sites to monitor progress and adherence to project specifications, work
procedure and safety standards.

Supervised and inspected 3rd party six monthly lifting equipment certification campaign activities.

Managed movement of all lifting equipment and CCU between sites.

Controlled lifting equipment inspection and certification database.

Conducted receiving inspection and verification of trace-ability for procured items, paints and project materials.

QAQC Manager à Mechanical System Ltd
  • Nigeria
  • juin 2011 à avril 2012

Developed and certified Quality management system to ISO 9001/TS 29001/ API Q1.

Reviewed test plans and procedures to ensure adequate compliance to product and system requirements.

Met project startup deadlines by proactively managing individual and team tasks.

Resolved escalated client issues in a timely manner.

Managed the entire QAQC activities of five(5) flow-line construction projects.

Managed and improved Internal Audit program.

Managed project QAQC process for TPU and ADN-A WHP Piping Fabrication; for ADDAX.

Obtained API 5CT, API 6A and API 7-1 product licenses.

QAQC Engineer à West African Ventures
  • Nigeria
  • février 2010 à mai 2011

Prepared and followed through on all required punch lists.

Inspected the installation of 6” subsea flow-line and at meji field (On board jascon 2 pipe-lay barge).

Reviewed project work method statement, test plans and procedures.

Inspected the installation of 24” subsea import and export pipeline at offshore Escravos (Onboard jascon 2 pipe-lay barge).

Inspected and controlled 6” & 24” offshore Pipeline Pre-commissioning activities.

QAQC Engineer – Piping/ Equipment à DAEWOO NIG LTD (DN55)
  • Nigeria
  • janvier 2009 à décembre 2009

Escravos Gas to Liquid Project

Inspected and controlled the preservative maintenance of staged and installed equipment.

Identified and helped resolve non-conforming product issues.

Performed preliminary, in progress and final inspection on modified equipment base and
foundation.

Created and controlled inspected piping material database.

Inspected piping spool fabrication and installation

QA/QC Inspector promoted to QA/QC Coordinator à DAEWOO NIGERIA LTD. (DN 47 & 56)
  • Nigeria
  • août 2005 à décembre 2008

Completed the fabrication and installation of ogoda and kolocreek valve station complex.

Completed the fabrication and installation of 24” x 121km swamp AGG pipeline (Ogbainbiri ~ ObOb).

Completed the pressure testing of all project subsystems and close-out of test packages.

Completed and handed over punch list, test packages and as- built documents.

Éducation

Baccalauréat, Mechanical Engineering
  • à University of Agriculture, Makurdi Benue State
  • octobre 2001
Diplôme, Electrical Engineering
  • à Petroleum Training Institue
  • août 1995

2 years National Diploma majoring in Electrical and Electronics Engineering.

Specialties & Skills

Plant Maintenance
Quality Systems
Inspection
Document Control
Welding Inspection
Ms Office
Inspection

Langues

Anglais
Expert

Formation et Diplômes

Cswip 3.1 (Certificat)
Date de la formation:
December 2014
Valide jusqu'à:
November 2019

Loisirs

  • Cycling