Odai AL-Mohammad, Projects manager

Odai AL-Mohammad

Projects manager

Projexel International Co. for Mechanical Contracting

Location
Kuwait - Al Farawaniyah
Education
Bachelor's degree, Mechanical Power Engineering
Experience
16 years, 10 Months

Share My Profile

Block User


Work Experience

Total years of experience :16 years, 10 Months

Projects manager at Projexel International Co. for Mechanical Contracting
  • Kuwait - Hawali
  • My current job since May 2019

Projects manager

Sr. Mechanical Engineer/ Infrastructure & Construction at Arabi Co
  • Kuwait - Al Kuwait
  • My current job since March 2014

Project Engineer For Kuwait University Project BP5A&B.
In charge of all engineering& coordination works of mechanical utilities.

Sr. Mechanical Engineer at Kazema Engineering Projects Co
  • Kuwait - Al Kuwait
  • January 2010 to March 2014

I worked as a Sr. Mechanical Engineer at big construction projects, preparing all shop drawings and securing all materials &equipments after getting approvals from project consultants, and doing the necessary coordination with other trades during project construction and composite drawings, and finally making all close out documents etc.
hereunder a brief description for my experience as a plumbing&fire fighting engineer in the following projects:

1- OPD, Laboratories, X Rays and Pharmacy Building At AL-Razi Hospital (From 01/04/013 Till today)
Our scope of work is complete plumbing & Fire Fighting system consists of:
- Drainage and water supply network systems and stacks.
- Water supply booster pumps.
- Central electrical water heaters.
- Two GRP tanks.
- Sanitary fixtures & toilet accessories.
- Fire Hose Reel System.

2- Ruba Residential complex at Mahboula(2011-2013)
Private residential tower consists of 17 floors (78 apartments) and six villas and three basements.
Our scope of work is Complete plumbing system consists of:
- Drainage and water supply network systems and stacks.
- Submersible pumps.
- Water supply transfer &booster pumps.
- Central electrical water heaters.
- Three insulated GRP tanks.
- Sanitary fixtures &toilet accessories.

3- Post Telegraph &Telecom Complex at South Sabahiya(2010-2011)
Governmental complex consists of three floors and separate mosque.
Our scope of work is a Complete plumbing system consists of:
- Drainage and water supply network systems.
- Submersible pumps.
- Water supply transfer pumps.
- GRP tank.
- Electric water heaters units.
Complete Firefighting system consists of:
- Automatic sprinkler system.
- Hose reel.
- Landing valves.
- Foam system for diesel generator.
- Electrical NFPA fire pumps complete with controllers.
Complete Fuel system consists of:
- Underground (12000Ga capacity) fiber glass storage tanks.
- Submerged fuel pumps complete with piping installations.
Complete Fountain system consists of:
- Water fall & nozzle& filtration pumps.
- Nozzles & lighting fittings.

4- Center for research and studies on Kuwait-(2010).
Governmental building consists of 14 floors and two basements, our scope of work is:
Complete plumbing system consists of:
- Drainage and water supply systems.
- Submersible pumps.
- Water supply transfer &booster pumps.
- Central electrical water heaters with mixing valves.
Complete Firefighting system consists of:
- Automatic sprinkler system.
- Hose reel.
- Landing valves.
Foam system for diesel generator.-
- Diesel &electrical NFPA fire pumps complete with fuel and
exhaust system and controllers.

Fire Fighting Project & maintenance Engineer at Arabian Construction Company
  • Kuwait - Al Kuwait
  • July 2007 to December 2009

I worked as a Fire fighting engineer for the following projects:

1- Juman Residential Complex -at Mahboula (2008-09)
Private residential tower consists of 13 floors (144 apartments) and 16 villas and two basements, the executed work is a Complete Firefighting system consists off:
- Automatic sprinkler system.
- Hose reel.
- Landing valves.
- Foam system for diesel generator.
- Electrical NFPA fire pumps complete with controllers.
- FM200 system for IT rooms.
2- Ruba Residential complex -at Mahboula (2008-09)
Private residential tower consists of 17 floors (78 apartments) and six villas and three basements, the executed work is a Complete Firefighting system consists of:
- Automatic sprinkler system.
- Hose reel.
- Landing valves.
- Foam system for diesel generator.
- Fuel system for diesel generator.
- Electric -NFPA fire pumps complete with controllers.
- FM200 system for IT room.
3- The Rester Hotel -Mahboula (2008-09)
Private hotel consists of 12 floors (24 duplex apartments), the executed work is:
Complete Firefighting system consists of:
- Automatic sprinkler system.
- Hose reel.
- Landing valves.
- Electric NFPA fire pumps complete with controllers.
- Smoke ventilation system.
4- Neighborhood center - at south Doha (2007)
Governmental complex consists of commercial building(three floors), mosque , gas center, clink
the executed work is a Complete Firefighting system consists of:
- Automatic sprinkler system.
- Hose reel.
- Landing valves.
- Foam system for diesel generator.
- Ductile &hydrant fire protection system.
- Electrical NFPA fire pumps complete with controllers.
5- Mosques headquarter building at Al-Jahra (2007-09)
Governmental building consists of 5 floors.
the executed work is a Complete Firefighting system consists of:
- Automatic sprinkler system.
- Hose reel.
- Electrical NFPA fire pumps complete controllers.

Maintenance Firefighting &Fire Alarm Engineer from 07/07/2007 to 10/11 /008
For the following sites:
1-National bank of Kuwait (NBK)
2-Kuwait Food Company (Americana, KFC)
3-Kout food group (Burger King series, Piza hot, Hardees)

My experience in installation of Special Fire fighting systems like (Foam system&FM200 system&Kitchen System) is detailed in the following projects:
A- (Foam system)
1- Commercial building - south Doha neighborhood center.
2- FM station -sewage refinery station for Kuwait capital at Riqqai .
3- International clinic - at Al Menqf.
4- Mubarak AL Kabeer tower - Kuwait.
5- Nieberhood center -Abu Hulaifa.
6- Khurafi tower - Qibla.

B- (FM200 system)
1- AL Khaligia tower - Sharq.
2- Baitec Tower - Kuwait .
3- Al Nassar Tower - Saihia .
4- KGL -Al Ezam circle.
5- Sultan center head office - Dajeej.
6- Avenues - Al Rai .
7- Ali Abd Alwahhab - al soor street.
8- Faison way complex- Salimia.

C- (Kitchen system):
1- Sea food restaurant - Kuwait towers.
2- Costa del sol hotel - shaeb bahri .
3- Apple bees restaurant - mishref .
4- Salail Al Jahra + Autar Lebanon restaurant - Jahra.
5- KFC (kentaki) city center - Salimia .
6- BK(berger king) Al Andalus.
7- pizza hut - Mansoria.
8- KFC -Fahd Al Salem .
9- KFC - Riqqa .
10- Hardees - Fahed Al Ahmed.
11- Tikka _ Fahed Al Ahmed.
12- KFC - Al Mohallab complex .
13- Hardees -Al Bedae circle.
14- Hardees - Jabria .
15- KFC - Kabed.
16- Daewatt restaurant - Al Jahra.
17- KFC - Al Jahra .

Small fire fighting projects (Hose reel and sprinkler systems) executed under my supervision and handed over to KFD:
1- Mondial aluminum factory - Sulaibia.
2- Apple bees - mishref .
3- BK - Al Andalus

References
References available upon request.

Education

Bachelor's degree, Mechanical Power Engineering
  • at Aleppo university, Mechanical Engineering College
  • August 2006

Power Mechanical Engineering

Specialties & Skills

Plumbing Design
Project Work
Fire Safety
AutoCAD.
Microsoft office
Elite program for Fire Fighting hydraulic calculation
ERP (oracle) for purchase orders &Project management.
Certified NFPA20 Educational Achievement
Communication & reporting skills
Plumbing,Fire Fighting & Fuel Systems design & sizing
Kuwait Fire Department Regualtions&Fire Code
Project Management & Planning Skills
Proactive thinking & problem solving

Languages

Arabic
Expert
English
Expert

Memberships

Kuwait Society of Engineers
  • Professional Mechanical Engineer.
  • August 2007
Kuwait Fire Department
  • Fire Fighting Approved Engineer-1st grade.
  • August 2007
Syrian Society of Engineers
  • Member
  • October 2006
Project Management Institute
  • project management professional
  • November 2012

Training and Certifications

Project Management Professional (Certificate)
Date Attended:
May 2012
Valid Until:
May 2015