Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Oliver Balmes, Commissioning Engineer

Oliver Balmes

Commissioning Engineer·Hyundai Heavy Industries

Saudi Arabia

Bachelor's degree, Bachelor of Science in Electrical Engineering

Work experience

Total years of experience: 19 years, 8 months

Commissioning Engineer

February 2015 - Present

Hyundai Heavy Industries

Jeddah, Saudi Arabia

February 2015 - Present

Commissioning Engineer in charge to perform field pre-commissioning & commissioning activities witness by client (Saudi Electric Company) or owners engineer (Fitchner) at Common Facility, BOP and Power Block Area.
Perform pre-commissioning & commissioning test activities for Steam Turbine Generator (Mitsubishi 723 MW) with manufacturer supervisor.
• PSS test, Load Rejection Test, Turbine & Generator Performance Test & Grid Code Test
• Actual /dummy synchronization test activities such as CT & VT phase relation test at minimum and full load condition, under excitation limiter (UEL), line drop compensator, automatic reactive power regulator (AQR), power system stabilizer & line drop compensator.
• Pre synchronization test activities such as shaft voltage test, step response, over excitation limiter, volts/hertz limiter, generator voltage build up test (AVR mode) Rotor & Stator DC high voltage test
• Functional test for electrical interface signal for turbine control system.
• Perform functional test and interface test for Generator auxiliary systems such as stator coil cooling package, seal oil cooling system and H2 & CO2 system, turning gear AC/DC package and turbine control system.
• Perform site acceptance test for steam turbine generator AVR panels ( auto voltage regulator & excitation system), generator control panel & generator protection panel.
Conducts system walk thru together with client owners engineer prior to system enegization & hand over Conducts power monitoring & protection relay capture (GE Mulitillin F60, T60, M60) for electrical substations
Performed interface, functional test and motor solo run test for variable speed drive (GE U7000) of 16MW boiler feed pumps
Perform differential protection test to medium voltage motors rated 10mW and above.
Executed differential protection test (87T, 87O & 64N ref) for Generator Step UP Transformer (380kV/26kV 904MVA), Common Auxiliary Transformer (26kV/13.8kV 70MVA) & Unit Auxiliary Transformer 26kV/13.8kV/13.8kV).
Lead a group of engineers and electrical technicians to carry out and perform Site Acceptance Test for 13.8kV and 4.16 kV MV Switchgears and 480 LV switchgears and MCC.
• Logic function test for protection relays for remote (DCS) operation.
• Perform DO/DI signal check from switchgear protection relay to ECMS and DCS
• Current Transformer analysis including winding resistance, insulation resistance, polarity and ratio, knee point/saturation and CT burden
• Voltage Transformer test including winding resistance, insulation resistance, polarity and ratio.
• CT/VT primary and secondary injection for analogue, digital meter calibration and relays
• VCB/ACB contact resistance test, closing and opening timing test and HV vacuum test.
• Perform bus bar differential protection (87BB) and partial differential test thru primary current injection
• Perform functional test inter trip, mechanical and electrical interlock between switchgear to switchgears and transformers.
• Witness third party test for relay setting and function test.


Preparation of technical documentation works such as:
• Preparation of Root Cause Analysis reports during system breakdown
• PTW requirements such as Job Hazard Analysis, Risk Assessment and LOTO isolation evaluation.
• Test package preparation (Acceptance Certificates & Mechanical Completion Certificates) for substation power receiving requirements.
• Preparation of site acceptance test procedures & test sheets for LV Switchgears and MV Switchgears, Main transformers stability test and energization test sheets.
• Issued and updates work progress for Pre commissioning and Commissioning Activities thru daily reports, 3 Weeks Schedules in PCMS (Project Completion Monitoring System).
• Conducts technical evaluation for test equipment supplier quotations and issued purchased orders. Performs test equipment performance evaluation prior to acceptance and payments.

Company industry:
Construction & Building
Job role:
Electrical Engineering

ELECTRICAL COMMISSIONING

February 2013 - Present

Hyundai Heavy Industries

Jeddah, Saudi Arabia

February 2013 - Present

Commissioning Engineer in charge to perform field pre-commissioning & commissioning activities witness by client (Saudi Electric Company) or owners engineer (Fitchner) at Common Facility, BOP and Power Block Area.
Perform pre-commissioning & commissioning test activities for Steam Turbine Generator (Mitsubishi 723 MW) with manufacturer supervisor.
• PSS test, Load Rejection Test, Turbine & Generator Performance Test & Grid Code Test
• Actual /dummy synchronization test activities such as CT & VT phase relation test at minimum and full load condition, under excitation limiter (UEL), line drop compensator, automatic reactive power regulator (AQR), power system stabilizer & line drop compensator.
• Pre synchronization test activities such as shaft voltage test, step response, over excitation limiter, volts/hertz limiter, generator voltage build up test (AVR mode) Rotor & Stator DC high voltage test
• Functional test for electrical interface signal for turbine control system.
• Perform functional test and interface test for Generator auxiliary systems such as stator coil cooling package, seal oil cooling system and H2 & CO2 system, turning gear AC/DC package and turbine control system.
• Perform site acceptance test for steam turbine generator AVR panels ( auto voltage regulator & excitation system), generator control panel & generator protection panel.
Conducts system walk thru together with client owners engineer prior to system enegization & hand over Conducts power monitoring & protection relay capture (GE Mulitillin F60, T60, M60) for electrical substations
Performed interface, functional test and motor solo run test for variable speed drive (GE U7000) of 16MW boiler feed pumps
Perform differential protection test to medium voltage motors rated 10mW and above.
Executed differential protection test (87T, 87O & 64N ref) for Generator Step UP Transformer (380kV/26kV 904MVA), Common Auxiliary Transformer (26kV/13.8kV 70MVA) & Unit Auxiliary Transformer 26kV/13.8kV/13.8kV).
Lead a group of engineers and electrical technicians to carry out and perform Site Acceptance Test for 13.8kV and 4.16 kV MV Switchgears and 480 LV switchgears and MCC.
• Logic function test for protection relays for remote (DCS) operation.
• Perform DO/DI signal check from switchgear protection relay to ECMS and DCS
• Current Transformer analysis including winding resistance, insulation resistance, polarity and ratio, knee point/saturation and CT burden
• Voltage Transformer test including winding resistance, insulation resistance, polarity and ratio.
• CT/VT primary and secondary injection for analogue, digital meter calibration and relays
• VCB/ACB contact resistance test, closing and opening timing test and HV vacuum test.
• Perform bus bar differential protection (87BB) and partial differential test thru primary current injection
• Perform functional test inter trip, mechanical and electrical interlock between switchgear to switchgears and transformers.
• Witness third party test for relay setting and function test.


Preparation of technical documentation works such as:
• Preparation of Root Cause Analysis reports during system breakdown
• PTW requirements such as Job Hazard Analysis, Risk Assessment and LOTO isolation evaluation.
• Test package preparation (Acceptance Certificates & Mechanical Completion Certificates) for substation power receiving requirements.
• Preparation of site acceptance test procedures & test sheets for LV Switchgears and MV Switchgears, Main transformers stability test and energization test sheets.
• Issued and updates work progress for Pre commissioning and Commissioning Activities thru daily reports, 3 Weeks Schedules in PCMS (Project Completion Monitoring System).
• Conducts technical evaluation for test equipment supplier quotations and issued purchased orders. Performs test equipment performance evaluation prior to acceptance and payments.

Company industry:
Construction & Building
Job role:
Engineering

QA/QC SUPERVISOR

June 2010 - December 2010

HANWHA E&C Consortium

June 2010 - December 2010

29, 2012 ARZEW Refinery Adaptation & Rehabilitation Project
(RA1Z) PMT: TECHNIP ITALY S.p.A SONATRACH Arzew Refinery B.P 37 Route Tlelat
Arzew Oran, Algeria
Duties and Responsibilities
Perform system preservation and maintenance activities during shutdown work for medium voltage switchgears and
transformers such as:
Conduct Site Acceptance Test for medium voltage switchboards, transformers and MCC includes mechanical
function test and interlocks, Bus Bar High Voltage Test and Insulation Resistance Test, CT/VT transformer test and
motor run test.(ABB, IMESA, Hyundai).
* Witness for relay setting protection test of ABB MV/LV switchgear ABB REF542plus for transformer
and motor feeder such as 87T, 50, 50G, 51, 51G, 51LR, 46, 64, 27, 49
* Witness for relay setting protection test of GE/NouvoPignone MCC EPM5800M.
Perform pre commissioning and commissioning test prior to Substation power receiving and plant start up.
* Conduct Site Acceptance Test for medium voltage Switchboards such as Bus bar High Pot test,
CT/VT test such as winding resistance, polarity, ratio and knee point.
* switchgear mechanical function test and Auto/Manual Power transfer function test.
* Transformers installation test activity such as oil filling activity, oil dielectric testing, winding test and
protection inter trip test with feeder breaker.
* MCC Bus Bar Insulation Resistance test, LV relay setting test
* Conduct ATS test of 380 V switchgear and emergency 380 V switchgear with Emergency Diesel
generator
Perform motor function test with PLC & DCS interface for waste water treatment facility, sludge incinerator system
and gas turbine system.(Honeywell, Siemens)
Conduct Inspection and Test of Low Voltage and Medium Voltage Cables such as High Pot and IR test.
Conduct inspection and Illumination Test for Lighting System inside building and process area.
Conduct Inspection and potential test for cathodic protection of underground pipes and under tanks
Supervised installations of transformers, cable trays /bus ducts, AC/DC UPS, Battery Charger and
Batteries, MCC/Switchgear, Emergency Generator, capacitor banks, ECS (scada) and IRP panels
Preparation of work procedure and hazard analysis for modification works at existing substations.
Ensure that the subcontractor is following approved construction procedures and safety project regulations
* Conduct material receiving inspection
* Lead a team of technicians in weekly electrical equipment preservation activity
* Review and Approved Subcontractor Method Statement, Monthly Bill of Quantity as per approved
Inspections.
* Issue of Non Conformance Report for quality lapses/defective works at site.
* Conduct daily tool box meeting with subcontractors prior to work

Job role:
Quality Control

Ammonia Plant Project

October 2008 - February 2010

WORLEY PARSONS

Saudi Arabia

October 2008 - February 2010

Company industry:
Oil & Gas
Job role:
Other

Electrical Supervisor

February 2008 - September 2008

Saudi-European Petrochemical IBN

February 2008 - September 2008

for main substation, control room, Ammonia tank storage area and Main process area.
* Site surveillance and inspection of installation for grounding system, cathodic protection and
cable pulling for power system
* Substation supervisor in charge Main Substation 34.5 KV and 13.8 KV
* Supervised installation and testing for power system of HVAC.
* Perform test for motor 13.5 kV Semi lean solution pump and flue gas ID fan motor,
* Witness vendor installation and testing activity for ABB 34.5 kV gas insulated switchgear
* Witness vendor SAT for transformer, UPS system and Scada System
* Supervised panel installation for MV ABB 34.5 kV gas insulated switchgear panel, UPS/|DC panel
LV switchgear and MCC, IRP, Scada panel and operators workstation .
* Supervised MV cable termination works for power.
* Supervised MV transformer and LV transformer assembly, installation and testing
* Supervised daily cable pulling activity and progress
* Mains substation cable tray lay out and installation as per site condition
* Supervised installation of grounding rods as per specification for control room, Substation and
process areas
* Approval of locally purchased materials and equipments as per project specification.
* Conduct tool box meeting prior to work at heights during lighting installation, cable tray installation,
cable pulling termination activity and in testing activities
* Certified Electrical Daily work permit issuer.
PROJECTS HANDLED

Job role:
Electrical Engineering

Area Supervisor

December 2006 - February 2008

Al Jubail

Saudi Arabia

December 2006 - February 2008

Mobilized as commissioning and Plant Start Up support group. Performed the following activity
* Witness MV cables testing and motor test (Hi Pot, IR and PI) for Main Pellet motor, Extruder
motor and Main Compressor Motor
* Supervision for the completion of installation works for fire alarm, communication and CCTV
System
* Pre-commissioning activities for MV/LV motors such as testing of windings, LCS function test and
motor solo run test
* Conduct /witness third party relay configuration test for switchgears and MCC
* Conduct test and commissioning of Fire Alarm System, CCTV and Telephone System
* Perform Site Acceptance of overhead cranes in compressor shelter areas.
* Assist commissioning team in mechanical run test and plant start up.
* Punch list clearing activity for mechanical completion.
* Review of documents and material audit of spare parts for electrical equipments for client handover
PROJECTS HANDLED:
Advance Polypropylene Company PDH/PP PLANT

Company industry:
Petrochemicals & Refined Petroleum Products Manufacture
Job role:
Management

ELECTRICAL SUPERVISOR

December 2006 - February 2007

Samsung Engineering Middle Eas

Saudi Arabia

December 2006 - February 2007

Job role:
Electrical Engineering

ELECTRICAL SUPERVISOR

June 2004 - November 2006

Green peak Industrial Services

Philippines

June 2004 - November 2006

Supervisor in charge for maintenance and utility work

Company industry:
Utilities
Job role:
Electrical Engineering

Student Trainee

June 2004 - November 2006

1200 MW STA RITA COMBINE CYCLE POWER PLANT PROJECT First Gas Power Corporation S

Philippines

June 2004 - November 2006

Job role:
Teaching and Academics

QA

-

FITCHNER Engineering Al Khumr

Saudi Arabia

-

- 12 years hands on experience in Construction, Quality Control and Assurance for Shut down works,
Commissioning & Start Up, Project Handover and maintenance on warranty period of Petrochemical
Plant, Oil and Gas Refineries and Thermal/Combine Cycle Power Plants.
- Good and extensive experience on pre-commissioning test and commissioning test activities for Medium
Voltage and Low Voltage Switchgears .
- Well verse on electrical systems such as Cathodic Protection (SACP & ICCP), Grounding System,
Communication, Fire & Gas, Telephone And Public Address
- Expert on construction of Power Distribution System, Transformers, Substation and Gas Turbines
System.
- Knowledge in Security system which includes CCTV, Microwave Intrusion Detection System, Fiber Optic
Fence Sensor Systems, ID card Readers and Road Blockers
- Documentation works such as planning and scheduling of activities, material take off, method statement
and safety procedure development, weekly and daily report activities with progress quantities.
- Wide knowledge in utilization of various test equipments such Freja 300, Omicron CMC-256-6, Omicron
CT Analyzer, Primary Injector ODEN, SMC Raptor, Sverker 750, Fluke 725 Process Calibrator & AC high
pot tester (High Puncture Tester).
WORK-RELATED EXPERIENCE
Electrical Commissioning Engineer HYUNDAI HEAVY INDUSTRIES
February 3, 2015 up to Present Jeddah South Thermal Power Plant Project JSTPP (723 MW x4)
PMT

Job role:
Quality Control

Education

University of Batangas

April 2006

April 2006

Bachelor's degree, Bachelor of Science in Electrical Engineering

Philippines

University Of Batangas

Bachelor's degree, Industrial Engineering

Bachelor's degree, Electrical Engineering

courses: Electrical Installation and Maintenance National Certificate Level II Certificate in Industrial Electricity Certificate in Building Wiring

Skills

UPS
Expert
UPS
Expert
Transformer
Expert
Transformer
Expert
Substation Automation
Expert
Substation Automation
Expert
Commissioning
Expert
Commissioning
Expert
Quality Inspection
Expert
Quality Inspection
Expert
C
Expert
C
Expert
CABLEADO
Expert
CABLEADO
Expert
DC
Expert
DC
Expert
LIGHTING
Expert
LIGHTING
Expert
MICROSOFT WORKS
Expert
MICROSOFT WORKS
Expert
MICROWAVE
Expert
MICROWAVE
Expert
OIL PAINTING
Expert
OIL PAINTING
Expert
PDH
Expert
PDH
Expert
SIEMENS NIXDORF HARDWARE
Expert
SIEMENS NIXDORF HARDWARE
Expert
TYPING
Expert
TYPING
Expert
UPS
Expert
UPS
Expert
Transformer
Expert
Transformer
Expert
Substation Automation
Expert
Substation Automation
Expert
Commissioning
Expert
Commissioning
Expert
Quality Inspection
Expert
Quality Inspection
Expert