Project Name and brief description: CHEVRON Escravos gas project 3B detailed Engineering
The Production Platforms Modification (PPMOD) Project of CONTRACTOR is a part of the ESCRAVOS GAS PROJECT PHASE 3B (EGP3B) scope of work.
EGP3B project gathers AG from eight(8) production platforms, six (6)of which are in the North Offshore Area and two of which are in the South Offshore Area.
Activities carried out include;
• Produced data sheet, electrical load list, electrical legend & worked with international codes and standards
• Sized cables, transformers, motors and generators
• Participated in Subcontractor /Vendor review and assisted in resolving issues during SAT testing
• Simulation of UPS uninterrupted power system design on Etap
• AC and DC uninterrupted power system UPS Battery and charger sizing
• Drafted working drawings, wiring diagrams, wiring connection specifications or cross-sections of underground cables, as required for instructions to offshore crew.
• Instrument Datasheets
• I/O lists,
• Gas detector list
• Control System Block Diagram
• Control room equipment layouts
• Instrumentation Hook up drawings,
• Marshaling Terminal Block Diagram,
• Reviewed client document and subcontractor
• Related with the offshore team to provide electrical information for all the nine gas platforms worked on.
• Prepared monthly vessel movement report for the monitoring of the vessel activities and register all downtime, consumptions and vessel related issues relating to the project promptly to management.
• Produced data sheet, electrical load list, electrical legend & worked with international codes and standards
• Sized cables, transformers, motors and generators
• Participated in Subcontractor /Vendor review and assisted in resolving issues during SAT testing
• Drafted working drawings, wiring diagrams, wiring connection specifications or cross-sections of underground cables, as required for instructions to offshore crew.
• Collaborated with engineers and project managers regarding design parameters for client projects.
• Junction Boxes Drawings and wiring Diagrams
• Electrical Cable Schedule
Project Name and brief description: Seplat Liquid treatment facility (LTF) -Feed
The facility which is located in the western Niger Delta is expected to be constructed and operated by January 1, 2013. Seplat owns a 45 per cent stake and is the operation of the producing licenses of OML’s 04, 38 and 41 located in the above area. The other stakeholder is Nigerian Petroleum Development Corporation (NPDC) which owns the remaining 55 per cent of the licenses.
The company’s operations area covered by the licenses comprises the Sapele, Oben, Amukpe and Ovhor fields.
Currently, wet crude is expected from Seplat flow stations of Sapele, Oben and Amukpe for processing at the SPDC Forcados Terminal. The LTF is to be designed to deliver export quality crude into the transmission line at the Sapele Manifold as defined by the Crude Handling Agreement (CHA).
Activities carried out include;
• Used INtools SPI software to produce; Instrument index, Instrument I/O list, Instrument Loop Diagrams etc
• Datasheets
• Produced Instrument MTO, Instrument Cable Schedule
• Produced Hook-up drawings, Instrument & JB layout, Instrument cable routing
• Various specification and datasheets
• Sized cables, transformers, motors and generators
• Lighting design of the facility and hazardous area classification
• One line diagrams simulation on ETAP and plan layout of electric power generating plants.
• Preparation of material take off (MTO), bill of quantity (BOQ)
• Reviewed and provide comments on documents and drawings from Subcontractors
• Attended Hazard identification (HAZID) and Hazard and operability study (HAZOP)
• Lighting Calculation Note
• Lighting and socket layout
- مجال الشركة:
- الاستشارات الهندسية العامة
- الدور الوظيفي:
-
الهندسة