Omar Alfaris, Executive Manager

Omar Alfaris

Executive Manager

Modernity of Architecture

Location
Iraq
Education
Bachelor's degree, Civil Engineering
Experience
15 years, 1 Months

Share My Profile

Block User


Work Experience

Total years of experience :15 years, 1 Months

Executive Manager at Modernity of Architecture
  • Iraq - Baghdad
  • My current job since June 2014

.Directing actions and providing guidance to the company technically and administratively.

.Mentoring and teaching the current company methodology.

.Maintaining and developing new methodologies.
.Create a winning 'can do' culture within the team.
•Proactively respond to the client as required.
Maintaining accurate and detailed files of all activities for reporting, cost control and auditing purposes.

.Implementation of multi-disciplinary projects from design phase through to commissioning and handover.

.Maintaining accurate and detailed files of all activities for reporting, cost control and auditing purposes.

.Develop relationships with internal and external stakeholders.

.Creating a positive and proactive approach that drives the whole of the project management team, as well as, the contractors and consultants.

Ultimately responsible for the administration of all contracts.

.identifying and working to resolve corporate level and strategic issues.

Monitoring issues to identify problems which could impact the project.

Ensuring proper and adequate communication amongst the project management team and all other stakeholders.

.Appointment of Contractors and be an interface between project owners, the client and client engineer.

.Directing actions and providing guidance to the project team.

Project Engineer at Bunyan baghdad
  • Iraq - Baghdad
  • January 2013 to May 2014

.co-ordinate with other disciplines during all stages of design development, construction, pre-commissioning, and start-up.

.assist in the coordination of all activities related to Civil/Structural engineering and design

. identify any areas of concern with respect to progress and/or quality and recommend corrective actions as required

.Monitoring and controlling engineering contractor's activities.

.Supplying all contract documents a in a timely manner and meet requirements, particularly those referred to in the scope of work.

.Implementation of multi-disciplinary projects from design phase through to commissioning and handover.

.Supporting the Facilities Engineering Manager by representing at meetings.

. Ensuring closeout and handover documentation is provided and procedures followed.

.Making sure quality requirements and documentation are produced and delivered in line with requirements.

Supervisor Engineer at Hadaf Alsalam Company
  • Iraq - Baghdad
  • January 2012 to December 2012

•Supervisor engineer for one of mosque in Baghdad
•Overseeing the Civil part of operations

Sub-Contractor at URUK for Engineering and Contracts
  • Iraq - Baghdad
  • August 2011 to December 2011

Project name: Taji power plant project 2
Client: Ministry of electrical

•Work AS sub- Contractor and Supervisor Engineer to perform concrete structure for some buildings inside the project such as Raw and Demi water control room, pump house and other. That which made me familiar with all facilities and designs for the power plant such as; foundation of The GTGs, foundation of the tanks, the tanks details, Bound Wall, Fire Wall, Sewage system, R.O System, Firefighting System, trench Details, Truss, sunshade, Mechanical works, piping works, electrical works, underground cabling systems and replacement programmers, Built new sub stations, Installed transformers, switchgear and more.

Site Manager at Al-Awael
  • Iraq - Baghdad
  • May 2010 to February 2011

Project name: Renovation of Protection of Children Hospital AND Construction of Emergency Hospital for children (44 beds).

Client: Ministry of health

•Managed project activities that involved the whole process from feasibility research, technical
Implementation, building services; heating and ventilation, sanitation, sewage, potable water treatment plants, water distribution, electrical services and Knowledge of design criteria for Hospitals.

•Responsibility for construction project from authorization through to completion, including co-ordination and sourcing of materials, manpower, budgets and Supervising sub-contract staff.

•Surveyed, project monitored, and planned the budget for pragmatic site work that involved quality control.
•Identifying service needs, solving engineering problems relating to the continuous expansion of the hospital.

•Assisting in the in development and expansion of the existing hospital infrastructure and improving
Engineering facilities.

•Collection and delivery of materials and apparatus to site.

Quality Control Site Engineer at Cosmopolitan inc.
  • Iraq - Mosul
  • December 2009 to May 2010

Project name: Local police Station in Mosul
Client: Ministry of interior

•Responsible for verifying that all field operations, including personnel, equipment and materials are in compliance with the Project plans and specification.

•Writing technical specifications and overseeing production of conceptual drawings, preliminary design criteria for project including Scope of Work, Work Breakdown Structure and general specification, milestone identification and planning (macro-level). Maintaining change controls.

•Contributing to strategy formulation and forward planning as a member of the management team.
Initiating the project, defining project scope and preparing the project plan.

•Identifying service needs, solving engineering problems relating to the continuous expansion of the Project.
•Reporting project status at progress meetings
.
•Ensuring all resources (manpower and materials), are provided as per the contractor’s scheduled plan.

Site Engineer at Al-Ansab
  • Iraq - Baghdad
  • November 2008 to December 2009

.Project name: Construction of Apartments for Doctors in Medical city
Client: Ministry of health

. Responsible for the construction of 4 buildings (G+2) and engineering services, including the construction of new facilities and the expansion of building services infrastructure. Based on International standards and building codes.

.Overseeing the civil part of operations.
.Recording all system operations.

Education

Bachelor's degree, Civil Engineering
  • at University of Technology,Iraq
  • June 2008

BSc. Civil Engineering/ Construction & Projects Management Dep. University of Technology in Baghdad Modules: Structural Design, Concrete and Building Materials,Estimating. Survey,Project Management, AutoCAD.

Specialties & Skills

Microsoft Office
Project Management
AutoCAD
3D Studio Max
microsoft project
Autocad
Projects Management

Languages

Arabic
Native Speaker
English
Intermediate

Memberships

Iraqi Engineers Union
  • Engineer
  • August 2009

Hobbies

  • Reading,Traveling,Observation of Movies and football
    Read a few of books in different fields try to travel to more countries in world