عمر طه, Senior Secondary Design Engineer

عمر طه

Senior Secondary Design Engineer

Larsen & Toubro - United Arab Emirates

البلد
الإمارات العربية المتحدة - الشارقة
التعليم
بكالوريوس, Electrical Engineering
الخبرات
3 years, 6 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :3 years, 6 أشهر

Senior Secondary Design Engineer في Larsen & Toubro - United Arab Emirates
  • الإمارات العربية المتحدة - الشارقة
  • أشغل هذه الوظيفة منذ نوفمبر 2023

Office tasks:
• Prepare technical submittals and drawings.
• CT/VT Sizing calculations.
• Send RFQs (Request for Quotation) to vendors.
• Review technical offer received from vendors.
• Review technical drawing received from vendors.
• Calculate BOQ.
• Design updated according to client request.
• Attend FAT.

Projects:
• Amaala Project: It is a micro grid project include (3 * 33/132kV GIS Substation,
248 MWp Photovoltaic Power Plant, 778.8 MWH Battery energy storage system
and 48.7 kWe Internal combustion engine plant) in Saudi Arabia Kingdom.

Secondary Design Engineer في El sewedy electric T&D
  • مصر - القاهرة
  • مايو 2021 إلى نوفمبر 2023

Tasks:

Site tasks:
• Create a site survey report for each station.
• Site survey for 107 substations (500/220/66/11kV, 220/66kV, 220/22/22kV, 66/11kV).
• Collecting data that meet contractual signal.
• Make a site survey report for each substation.
• Extract appropriate points which can use in adaptation work (Substations control centre)
from existing drawings.
• Estimate BOQ for adaptation work material.
• Draw a single line diagram for existing substation.

Office tasks:
• Prepare all technical submittals and drawings.
• Send TSRs (Technical Submittal request) vendor list.
• Review technical offer received from vendors
• Calculate BOQ.
• Design updated according to client request.
• Attend FAT.
• Design of base design for adaptation work.
• AC/DC system design.
• Draw Schematics for adaptation work using E3 Schematic design program

Projects:
• ANGOLA Project:
- Construction of Xá Muteba 400/220/110kV Substation with One and half configuration
including 150 MVAR MCSR, 50 MVAR fixed reactor, 150 MVA power transformer.
- Construction of Malanje 400/110kV Substation with One and half configuration
including 50 MVAR fixed reactor, 150 MVA power transformer.
- Construction of Belize 60/30kV Substation including 10 MVA power transformer.
- Construction 60 kV line bay in Buco Zau 60/30kV Substation.
• ANGOLA PV Project: Construction of 90 MWp Photovoltaic Power Plant & 25
MWh Battery Storage System including 60/33kV Substation in Cabinda.
• YELLEN Project: OUAGA-NO 90/33kV Substation & 42 MWp Photovoltaic
Power Plant including its MV in Burkina Faso
• ZANO Project: 24 MWp Photovoltaic Power Plant including its MV in Burkina Faso
& Extension in ZANO substation.
• JICA Project (Control Centre for Helmya City).
• DRCC (Delta Regional Control Centre).
• El-Mostakbal City Project

Tender Only (SLD & BOQ)
• Alex Port 66/22kV substation.
• Tanzania 400/220/132/33kV substation.
• Angola
• Madasgar

Achievements:
• Protection Study. (ZANO Project)
Including load flow, Short circuit analysis and Over current & Earth fault coordination by
ETAP.
• Over current coordination relay setting excel file. (El-Mostakbal City)
• Make a one E3 file for design adaptation work for all substations. (DRCC)
• Excel file contains all data for 107 substations. (DRCC)

Junior Secondary Engineer في Electro Tharwat
  • مصر - القاهرة
  • فبراير 2021 إلى مايو 2021

Tasks:
• Schematics modification for 11kV DP’s and medium voltage level for 66/11kV substation
using E3 Schematic design program.
• The modification was relay replacement in medium voltage level (11kV).
• CT/VT calculation.

Projects:
• District Control Centre (DCC) upgrading and modifying existing switchgear with smart
IED

Achievements:
• Excel file contains all data for DP’s.

Junior Secondary Design Engineer في El Sewedy Electric T&D
  • مصر - القاهرة
  • مارس 2019 إلى مايو 2019

Tasks:
• Interfacing, editing and reviewing LCC, Control and Protection Schemes (Bus coupler
feeder, line feeder and transformer feeder).
• Cable termination list for control cables; selecting, sizing and termination scheduling.

Projects:
• BADR II 220/66/22KV GIS S/S 2*175MVA.

الخلفية التعليمية

بكالوريوس, Electrical Engineering
  • في Cairo University
  • مايو 2019

Specialties & Skills

Engineering Design
Switchgear
AutoCAD
Secondary Substation
AutoCAD
Microsoft office

اللغات

العربية
اللغة الأم
الانجليزية
متوسط

التدريب و الشهادات

Ezz Steel internship (تدريب)
معهد التدريب:
Ezz Flat Steel
تاريخ الدورة:
June 2018
المدة:
80 ساعة
El Sewedy Electric T&D internship (تدريب)
معهد التدريب:
El Sewedy Electric T&D
تاريخ الدورة:
August 2017
المدة:
168 ساعة
Schneider electric internship (تدريب)
معهد التدريب:
Schneider electric
تاريخ الدورة:
July 2018
المدة:
176 ساعة

الهوايات

  • Teaching
    I work as secondary teacher for 4 years
  • Reading