عمر زين, Senior Electrical Engineer

عمر زين

Senior Electrical Engineer

ECG

البلد
مصر - القاهرة
التعليم
بكالوريوس, Electrical Engineering
الخبرات
13 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :13 years, 5 أشهر

Senior Electrical Engineer في ECG
  • مصر
  • أشغل هذه الوظيفة منذ سبتمبر 2021

• Led a team of 6 electrical engineers, orchestrating their efforts to successfully meet the project deadlines as scheduled.
• Led the management of construction contractors' activities and electrical installations.
• Monitored and reported on contractors' performance, ensuring strict adherence to project timelines and quality standards.
• Actively oversaw all testing and start-up activities to ensure contractors' compliance with approved plans and procedures.
• Evaluated and sanctioned contractor-submitted shop and as-built drawings, materials submittals, tie-in procedures, project schedules, and work permits in coordination with relevant departments.
• Orchestrated meetings between contractors and concerned departments to resolve interfacing issues during construction.
• Verified the accuracy of contractors' invoices, ensuring compliance with contractual terms.
• Administered Site Observations and formulated potential Non-Conformance Reports (NCRs) as necessary.
• Proactively addressed open Work Inspection Reports (WIR), Material Inspection Reports (MIR), and site observations, taking corrective actions promptly.

Allied Consultants Ltd(Egypt), في Allied Consultants Ltd(Egypt),
  • مصر - القاهرة
  • فبراير 2020 إلى سبتمبر 2021

Senior Technical Office Engineer

Senior Supervision Engineer في Khatib & Alami, Damam, Saudi Arabia;
  • المملكة العربية السعودية - الدمام
  • أبريل 2019 إلى فبراير 2020

Duties included Supporting and supervising construction, testing, and inspection works and
materials, providing overall guidance and advice to construction teams, assist the
project manager in the compilation of project progress reports; including providing details
of implementation, details of problems encountered, solutions adopted, and detailing and
explaining any variation in costs and implementation schedules from the original estimates
for the following project :
- KAP1, Damam, Saudi Arabia. Construction supervision of the King Abdullah Bin Abdul-Aziz

Sr.Electrical Design Engineer في Allied Consultants Ltd; Cairo, Egypt,
  • مصر - القاهرة
  • يونيو 2016 إلى أبريل 2019

• Orchestrated comprehensive electrical design for buildings, covering small power, lighting, Low Voltage, fire alarm, sound, access control, MATV, CCTV, telephone and data, and security systems Subject to (NESC, NEC, IEC. IEEE).
• Spearheaded the design of entire electrical systems for District Cooling Plant projects, encompassing MV switchgear, RMU, MV soft-starter & VFD, transformer, and LV MDB.
• Conducted intricate technical calculations, including short circuit, load flow, harmonics study, motor starting analysis, generator sizing calculations, and lighting calculations.
• Developed tender documents for EPC contracts, providing a comprehensive framework for project execution.
• Performed detailed engineering computations, material quantity takeoffs, and estimates for accurate project planning and budgeting.
• Guided CAD Designers and lower-level Engineers within the project team, providing technical expertise.

Electrical Technical Office Engineer. في BTC
  • المملكة العربية السعودية - مكة المكرمة
  • أبريل 2015 إلى يونيو 2016

Duties included participating in implementing technical office policies and procedures,
Studying the project contract documents (time schedule, project design drawings, BOQ,
etc.), Update the shop drawing log before sending the shop drawing to the consultant
for approvals, Studying and preparing requests for information (RFIs) for all missing,
unclear, conflicting or other technical matters that may arise during construction for all low
current system for the following projects:
 Third Saudi Expansion of Holy Haram, Makkah, Saudi Arabia. Phase 3 involved five major
projects including the extension of the mosque’s main building, in addition to
constructing an arena, a pedestrian tunnel
 Makkah First Ring Road, Makkah, Saudi Arabia, installation of closed circuit TV(CCTV)
system and coordination between the other low current system.

Electrical Design Engineer في Allied Consultants Ltd; Cairo, Egypt
  • مصر - القاهرة
  • يناير 2011 إلى أبريل 2015

الخلفية التعليمية

بكالوريوس, Electrical Engineering
  • في Minia University
  • يونيو 2010

B.Sc. Bachelor Of Science In Engineering June 2010. Mina University. Electrical Power and Machine Department. Overall grade: Good.

Specialties & Skills

Electrical Testing
Building Information Modeling (BIM)
Detailed Design
Time Management
Power Distribution
Infrastructure Projects

اللغات

العربية
اللغة الأم
الانجليزية
متمرّس

العضويات

Member, Egyptian Syndicate of engineer
  • ENGINEERING
  • June 2010

التدريب و الشهادات

Revit (تدريب)
معهد التدريب:
ALLIED
تاريخ الدورة:
April 2018

الهوايات

  • Reading