Asset Affairs, To Convert a GIS Data Model from the Sub Contractors data, like CAD file, Shape file and some other related documents to the particular projects and need to update in the ENTERPRICE ASSET MANAGEMENT SYSTEM(EAMS) as per Ashghal Standards. Before update need to check the Data by the visual interpretation techniques like tone, texture, shape, size and shadow, by using the high-resolution Satellite images, and also correct the topological Errors
•Associate GIS Engineer in Nest Information Technology -ADWEA PNS with GIS-Track1- The project aimed at conversion of surveyed raw data into GIS for Electric and Water network in the entire area of Abu Dhabi and Al-Alain. The purpose of the project is to convert the low confidence and HNOC feature in electrical and water network that will be surveyed based on the Survey or verification BOQ provided by ADWEA. These BOQ is surveyed and provided in GIS format that is present in the current database of ADWEA. The survey team travels to the fields with the information provided and cross verifies with the actual network to ensure the accuracy and actual location of the network. The surveyed information is provided in the form of shape file. The picture of the asset is also provided to validate the accuracy of surveyed/verified features. These surveyed input (shape files) are converted into GIS database in respective feature classes
•SSDC Sewer Network The scope of work is to create an enterprise level GIS for operating the SSDC sewer network, treatment, and disposal systems. The outcome of the project was a comprehensive data inventory, stored in a database to support interfaces with a GIS and integration with the existing Oracle system with different asset applications. The main tasks included were database schema mapping involving feature class and domains using FME, conversion of network data with reference to georeferenced AutoCAD files, gap analysis of existing GIS data, survey data incorporation with reference to GPS points and providing a seamless sewer network with accurate invert levels and connectivity.QA/QC with automated workflows for direction check based on invert level, accuracy of invert level based on slope of network Environment: ESRI ArcGIS 10.1, AutoCAD
•To digitize the 2D Road features like a Road center line, Sign boards, median, for implementing the Driver less TAXI, For United States of America.
•Fiber to the Home (FTTH), Using a LIDAR point cloud (3D) to capture the Electric Pole and features for checking the maximum pole weight-age Capacity and to determine the Suitable place For Attach the Fiber Cable Using the software MICROSTATION V8i, Open Source CLOUD COMPARE Software and Ocalc Pro Software.
•2D LAND BASE UPDATION form the Given Assessor Maps using ArcGIS V10.1
•MEW Kuwait, the scope of this project involves in the data conversion of water network components into GIS with the reference of the input provided for whole Kuwait using ArcSDE technology. Input contains Open ware and Public Authority of Civil Information parcels data, Satellite Imagery, Scanned drawings, CAD drawings, Single line diagrams, Geodatabase template, Data conversion guidelines document,
•SEC-Saudi Electrical Company, the Scope of the project involves the conversion of Electrical network components into GIS with the reference of the input provided for whole Saudi Arabia From the Power Generation to Substation, Substation to Minipillar and Minipillar to the Service Area Connections. Input contains Open ware and PACI parcels data, Satellite Imagery, Scanned drawings, CAD drawings, Single line diagrams, Geodatabase template.
•Moose Pass 3DTower Cleaning-The Scope of this project to convert a photography to 3D lidar points using the PIX4D mapper Software, and Noise filtered using the Autodesk Recap.
•Geo-Rectify the low altitude ORTHO AERIAL PHOTOGRAPH using Arc GIS for the Multi Temporal studies -UNITEDSTATES DEPARTMENT OF AGRICULTURE.
ACHIEVEMENTS
•BEST PERFORMER Certificate in the entire GIS DATA TANIS Team in the