Panthesh Barot, Lead Project Manager

Panthesh Barot

Lead Project Manager

Baker Hughes, a GE Company

Lieu
Qatar - Doha
Éducation
Baccalauréat, Mechanical Engineering
Expérience
26 years, 3 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :26 years, 3 Mois

Lead Project Manager à Baker Hughes, a GE Company
  • Qatar - Doha
  • Je travaille ici depuis octobre 2011

• Managing the planning and implementation of preventive / predictive / maintenance schedules for improving the overall reliability and safety of plant, personnel and production processes
• Steering customer activity related overhaul & repair of GE equipment (Turbines, Turbo Expander, Compressor, Motor and Pumps) for several Customer within Gulf region
• Heading various projects in Oman, UAE, Pakistan and Qatar across the Middle East region for Downstream and upstream Oil and Gas market
• Formulating strategic plans to enhance operations and meeting organizational objectives
• Spearheading complete plant/project operations for manufacturing right from planning, organizing to achieving the production targets
• Implementing various techniques for waste reduction, entailing identification of opportunities, energy audits, analysis of data, conduction of tests and implementation & post audits schemes
• Identifying the contract requirements and preparing contract agreement for purchasing the resources required for process enhancement of the plant such as Gas Sale and Purchase contract
• Reviewing the operational practices, failures and process changes for qualitative improvement/ energy conservation
• Undertaking regular inspections; eliminating unsafe operations to prevent accidents
• Identifying the areas for continual improvement in Quality, Environment & Safety as per the quality standard such as ISO 9000
• Leading installation & commissioning of various mechanical equipment & plant machines and tracking project progress and taking steps for mitigating any risks
Highlights:
• Managed the projects worth USD 250 million and facilitated improvements in project work to deliver cost savings and efficiency improvements
• Reduced quality issues by implementing controls and ensuring permanent resolution of recurring issues

Service Manager à GE Power (Field Core Company)
  • Inde - Delhi
  • août 2007 à septembre 2011

• Managed the Field Services business in the India region including installations, warranty, planned & unplanned maintenance and contractual services
• Developed schedule for all type of packages related to power plants using Primavera Project Planner
• Created S-curves using P3/ Excel Expedition and Use of Primavera
• Led RGTIL (Pipeline project - Installation GENP PGT 25 & PGT10) & RGPPL (Dabhol GE- 09FA Rehabilitation)
• Worked on EHS leadership, Operation Safety Policy Compliance, field work in compliance with OSHA & applicable regulations and employee safety practices
• Drove the team of Field Engineering resources and service engineering team to accomplish effective delivery of services to meet customer objectives

Field engineer Offshore Mechanical Maintenance à Royal Dutch Shell Plc. (BGEPIL)
  • Inde - Mumbai
  • juillet 2001 à juillet 2007

• Worked on maintenance of the platform equipment with material and tools planning
• Used Computerized Maintenance Management System (CMMS) for managing HSSE policy compliance, contract personnel management, job scheduling and inventory/spares
• Managed:
o Commissioning of 2 Centaur-50 Gas turbine driven compressor
o Engine change out for Turbine generator of solar makes Saturn 20 (Caterpillar)
o Operation & maintenance of Mars 100, Centaur 50, Saturn 20 SOLAR Turbine
o Operation & maintenance of diesel engine of Cummins (VT- 1710G) & Caterpillar (3306, 3406)
o Operation & maintenance of Nautilus, favelle-favco and Weather ford make crane
o Trouble-shooting of Hydraulic systems
o Operation & maintenance of all kind of Pumps (Centrifugal, Submersible, reciprocating, Diaphragm) and compressors (Ingersoll-rand and Atlas Copco)
Highlight:
• Won team (BIPS) Award for STD well head platform commissioning

Area Engineer à Enron
  • Inde - Mumbai
  • mai 2000 à juin 2001

• Worked on:
o Commissioning of 750 MW out of 2184 MW CCPP for Phase-II
o Start-up, operation and safe shut-down of Boilers (HRSG) of 360 TPH capacities of Kawasaki
o Start-up, operation and safe shut-down of Gas turbines of GE frame 9 FA+ (270MW) & frame 6B (35 MW)
o Start-up, operation and safe shut-down of Steam turbines of GE (290MW)
o Operation & troubleshooting of DM Plant of Aquatech (140 m3/hours)
• Managed fuel unloading, treatment and Operation of 400 KV switchyard
• Exposure of working on speedtronic Mark-V control system and PLC of Foxboro

Operation Engineer à Chinta Light Power Gujarat PowerGen Energy Co.
  • Inde - Ahmedabad
  • mars 1998 à avril 2000

• Managed operation of Siemens V 94.2 (655 MW) CCPP, fuel treatment plant of Westphalia centrifuge, effluent treatment plant and Naphtha & HSD fuel unloading and
• Worked on operation and Commissioning of Naphtha & HSD Tank farm and DM plant & BOP
• Exposure of working on various fire protection systems, LOTO

Éducation

Baccalauréat, Mechanical Engineering
  • à Technical Education Board
  • octobre 1998
Etudes secondaires ou équivalent, Science
  • à Gujarat State Education Board
  • mars 1994

* H.S.C. (10+2 Pattern): Gujarat State Education Board (Higher Secondary)

Specialties & Skills

Mechanical Engineering
Computer Skills
Field Service
Offshore
Gas Turbine
Reciprocating compressor
Project Planning
DIESEL ENGINE
MAINTENANCE
SCHEDULING
Power plant operation
Certified Project Management
Mechanical Engineering
COMPRESSORS
Project Management

Langues

Hindi
Expert
Anglais
Expert
Gujarâtî
Expert

Formation et Diplômes

Leadership (Formation)
Institut de formation:
Florida University, USA
Date de la formation:
January 2008
Durée:
100 heures
Management (Certificat)
Date de la formation:
January 2006
Apprentice for Power Plant (Certificat)
Date de la formation:
January 1998
PMP (Certificat)
Date de la formation:
November 2014