Key Result Areas:
• Handling a Tie-in activities from scratch up to end including SP3D modelling was done individually
• Preparing multi purpose support inputs to civil, other discipline needful list and nozzle orientation study drawing
• Reviewing all third party documents and drawings related to Piping design
• Preparing study drawing in 2D and endow with inputs to designer and modeller
• Preparing Operational, Maintenance & Safety study at Unit and Battery limit area
Highlights:
• Holds distinction of setting-up piping deliverable targets & planned to achieve operational excellence
• Made significant contribution to effectively design piping layout
Key Result Areas:
• Responsible for developing piping engineering front end documents from design basis documents received from clients
• Involved in reviewing design and drawings prepared by sub-consultants or contractors
• Handled installation of work instructions and checklist for specific job function, accuracy and improvement
• Assisted and advised on concept/ feasibility studies, technical memos, standards and guidelines related to pipeline activity
• Accountable for managing:
o Pipeline/ piping networks designs according to the standard codes- ASME / API
o Design of piping supports/ hanging as well as execution of piping layouts, GA's, orientation & isometric drawings besides review of stress analysis reports
• Looked after the preparation of technical evaluation reports on piping & pipe fitting specifications, valves & specialities data sheet
• Performed activities pertaining to writing of piping material specifications including material selection
Highlights:
• Pivotal in introducing corrective action plan to significantly improve operational efficiency
• Merit of initiating steps to deliver superior results
Key Result Areas:
• Spearheading piping design operations for client projects in accordance with the defined Key Performance Matrices
• Managing piping engineering deliverables along with close monitoring of progress schedule
• Ensuring availability of material as and when required including its proper allocation / substitution at site based on priority
• Involved in analysing, anticipating & providing resolution to critical issues pertaining to piping project
• Accountable for preparing & issuing performance reports
Highlights:
• Recognized for extensive contribution in preparing departmental workflows and procedures
• Pivotal in introducing best practices in risk mitigation plans
• Appreciated for active involvement in proactive bulk materials management
• Successfully implemented plot plan, equipment layout, TBE approvals to ensure improved performance
• Merit of driving initiatives to finalize Division of Responsibility
• Holds distinction of setting-up piping deliverable targets & planned to achieve operational excellence
Key Result Areas:
• Led and mentored a team to prepare isometric drawings, including BOQ
• Involved in organizing & managing resources to bring about infrastructure development
• Handled preparation of detailed daily/ monthly progress reports & maintained performance records for top management.
Introduced best practices in the operations and successfully met the stringent quality standards.
Made significant contribution to effectively design piping layout.