Parvez Ahmed Khan, Chief Engineer

Parvez Ahmed Khan

Chief Engineer

The Kamat hotel India LTD VIT

Location
India - Mumbai
Education
Bachelor's degree, Electrical
Experience
20 years, 7 Months

Share My Profile

Block User


Work Experience

Total years of experience :20 years, 7 Months

Chief Engineer at The Kamat hotel India LTD VIT
  • India - Mumbai
  • My current job since May 2016

• Lead a team to maintain and repair mechanical, electrical, heating cooling and electrical systems
• Ensure the hotel's safety features are in compliance with the state laws and regulations
• Inspect the facility and assigns job to the staff for routine maintenance and repairs
• Participate in preventive maintenance programs and maintain documentation necessary for the energy management
• Preparing budget and negotiating with contractors
• Address complaints from guests and ensure no such problems occur in the future
• Hired, trained, and motivated staff in providing best customer service
• Maintained disciplined and took necessary action for negligence
• Accomplished maintenance and repair work within the set budget
• Developed and implemented cost-effective emergency programs
Project In charge
• Room renovation
• Over all plant and machinery up gradation

Chief Engineer at The lalit Great Eastern Hotel
  • India - Kolkata
  • May 2015 to April 2016

• Development and implementation of SOP and PM programs
• Facilities budget development and control
• Utilization Building Automation Systems
• Opera Property Management System
• Time saver Attendance control and payroll system
• Development of Training and Educational Programs for Engineering Personnel
• Principles and practices of supervision, administration and management
• Enforced facility inspections and inventory controls.
• Corresponded activities with other departments and handled department inventory of supplies.
• Aided budget preparation, implementation of policies and ensured proper adherence to assigned projects.
• Recommended improvements for annual audit, including energy efficiency, alternative power and conservation actions.
• Supervised all repairs, work orders and maintenance issues to ensure comfort and safety of guests.
• Partnered with contractors to perform re-design of lodgings to comply with newly-created energy-efficiency plan.
• Conducted weekly walk-through inspections to accomplish weekly reports for General Manager and hotel staff.

Project In charge
• Room renovation
• Up gradation of Plant room
• Kitchen and Restaurant

Chief Engineer at The Resort (K Raheja Corp Pvt Ltd)
  • India - Mumbai
  • September 2013 to April 2015

1.Organize engineering staff and controls staff to correctly operate all Mechanical and Electrical plant and equipment to suit the need of the hotel.
2.Plan and implement preventive maintenance program for Fire life safety, Air conditioning, Electrical, Refrigeration, Boiler and steam system, kitchen and laundry equipment, extra low voltage, plumbing and drainage system.
3.Prepare Annual and capital budget for equipment required, repair and maintenance and system modification.
4.Prepare man power budget and conduct performance appraisal and keep staff informed of the expectation and goal of the department.
5.Provide recommend on profitability and performance of the hotel and prepare P&L and attend dept head meeting.
6.Prepare monthly training program and conduct training for new equipment service manual and operation guideline.
7.Monitor energy consumption, analyses and check invoice by supplier and utility companies.
8.Reduce energy consumption while taking into account of guest comfort and equipment operating life.
• Participate in the energy conservation, energy management and create awareness among staff.
• Liaises with the government and statutory bodies to ensure compliance with regards to rule and regulation .Authority like Department of environment, electrical, water, fire machine and other authorizes having jurisdiction.
• Maintain and monitor inventory on the regular basis
• Plan, design and implement project, to improve the plant efficiency or reduce the other operating and maintenance cost.
• Design and prepare drawing and specification and estimate costs.
• Call for quotation and liaises with outside contractor.
• Identifies hazards and potential safety concern and train and supervise the emergency response teams as required.
Project In charge
• Room renovation
• Up gradation of Plant room
• Banquet Hall renovation

Chief Engineer at Surya Palace Hotel
  • India - Mumbai
  • August 2012 to September 2013

1.Develop, recommend, implement and manage the department’s budget capital expenditure plan, forecasts and objectives consistent with maintaining a first class property and management’s expectations.
2.Maintain the overall operation of the maintenance department and the appearance and working order of the property
3.Employ preventive maintenance schedules to ensure that guestrooms, public areas, mechanical, electrical, kitchen and laundry equipment are in good working order
4.Plan, organize, and direct activities concerned with the maintenance of structures, facilities, and systems. Develop and implement quality control programs.
5.Review contracts and negotiate revisions, changes and additions to contractual agreements with vendors, consultants, clients, suppliers and subcontractors.
6.Maintain proper equipment and supply inventory and follow hotel operations procedures and communicate with the GM to ensure that orders are placed for any required equipment or supplies.
7.Perform maintenance and repair work on the interior and exterior of the buildings, hotel rooms and contents, laundry and kitchen/refrigeration equipment, lighting, heating/air conditioning, ventilation, water treatment systems, and spa equipment.
8.Responsible for developing, implementing and supervising maintenance program in guest rooms, building structure, mechanical, electrical machinery, HVAC system and related equipment.
9.Respond to maintenance emergencies on an 'on-call' basis
10.Ensure compliance with corporate policies, international standards, local regulations, and other environmental considerations.
11Coordinate renovation bidding, define the cost and scope of the project and oversee the general contractor and subcontractors to ensure quality work is performed for minimal costs.
12.Projection charge also for
• Room Renovation
• Expansion of the Property
• Plant room upgrade

Project Electrical Engineer at Khanna hotels Pvt. Ltd (Taj Vivanta Bekal)
  • India - Kerala
  • August 2010 to July 2012

1.Supervision of all electro mechanical installations
2.Certification of running & final bills of vendors.
3.Safety precaution for electrical equipment like motors, panels & cables.
4.Design review of Electrical, fire detection, HVAC system prior to execution.
5. Responsible for the quality of work, timely completion of the projects & security of equipment
6.Project Management
7.Quality Control
8.Site planning, layout, designing and execution,
9.Execution of electrical installation, UPS and HT substation
10.Coordinating with different discipline like Mechanical, Civil, Structure, Piping, etc to execute the job as per planned schedule
11. Analyzing agreements with accordance with the client needs
12.Identify defective works and ensuring rectification for the same
13. Holding daily meetings with the client and contractors, review daily plans and monitor manpower / equipment deployment
14. Critique all relevant drawings, specifications, BOQ's, estimates etc provided by the architects/consultants; and provide inputs/suggestion
15.Guidance for installation, commissioning on load final Testing.
16.To be responsible for the efficient running of the department in line with the hotel's corporate strategies, brand standards and owner expectations.
17.Assisting the Director of Engineering in ensuring the efficient and economic operation of the Engineering Department in support of all other operating Departments.

18.Project in charge Vivanta Taj Bekal Resort and Spa

Project Electrical Engineer at Sadaf Electricals
  • India - Mumbai
  • April 2010 to July 2010

1.Designing the Electrical system after referring the Architectural & Structural Drawings.
2.Selecting Equipment as per the requirement.
3.Preparing the Conceptual Design Report along with Cost Estimates etc.
4.Preparing the Tender Documents along with Drawings.
5.Comparing the Offers submitted by Contractors / Suppliers.
6.Finalizing the Contractors/Suppliers after completing the negotiations with all parties.
7.Preparing the execution drawings and realizing the same for Site Execution (Installation of system).
8.Estimated costs, scheduled work, billed clients, ordered supplies and equipment.
9.Co-coordinating the site activities as per clients requirements till the Commissioning & Handing over of all the Systems to Client.
10.Certification of the Invoices of Contractors / Suppliers during the course of project. Upon receipt of the approval / comments from the client /associates a set of tender documents consisting of detailed designs and working / execution drawing, Bills of quantity and detailed
11.Technical specifications and final estimate shall be submitted.
12.Invitation of the tenders on behalf of the client where required, review and analysis of bids and assistance in letting contracts.
13.Preparation of drawings for submission to appropriate Licensing / sanctioning authorities
14.Issuing to employer, certificates of cost estimates for submission to financial and other institutions.
15.Checking vendors and contractor's submittal of shop drawings, material and equipment.
16.Whenever necessary inspection of the same at either site or at manufacturers place.
17.Project in charge till date
• 32 storey tower at Crawford market.
• 20 storey tower at Bombay central.
• 3 nos. 16 storey tower at Mira road.

Project Electrical Engineer at IHG, Crowne Plaza Hotel and Resort Kuwait
  • Kuwait - Al Farawaniyah
  • May 2008 to January 2010

1.Prepare tender documents; prepare tender report and Bid Summary.
2.Review of Drawings, Specifications and getting clarifications from Architects/Consultants.
3.Regular update to Services Head about the progress. Keeping track of day-to-day activities of all the projects and operation.
4.Organizing of materials required for execution of projects on timely basis.
5.Helping to plan team members on their day-to-day activities so as to meet project deadlines and targets and smooth operation of the hotel.
6.Learn/understand the systems technically so that design of projects can be done to suit the profitability.
7.Maintain the condition of the physical assets of the hotel by carrying out any upgrading and project work in liaison with architects, interior designers and management
8.Ensure the quality of all work completed by both employees and external contracted staff adheres to the standards of good engineering practice.
9.Leading team in the day to day engineering and maintenance operations of the hotel including service standards, equipment schedules and work schedules.
10.Liaising with Housekeeping to co-ordinate and priorities maintenance activities for guest rooms and public areas Developing systems and procedures to ensure the health and safety of guests, team members, plant, machinery and property.
11.Liaising with Government agencies to ensure full compliance with statutory regulations.
12.Identifying and introducing environment friendly systems and equipment.
13.Till date the following project has been completed by me as follow,
• Rooms Renovation (300 rooms)
• Meeting rooms (9 no’s)
• Banquet store
• Italian Restaurant
• Staff Cafeteria
• Crowne Plaza Saloon (Franck Provost Paris)

Project Electrical Engineer at Power and Instrument (GUJ) Pvt. Ltd.
  • India - Mumbai
  • September 2004 to April 2008

1.Design of Panel Board with switch gear, indicating meter, indicating LED as per the requirement.
2.Circuit breaker like OCB ACB VCB with microprocessor control, manually draw out, U V release or not as per the requirement and the rating of the voltage.
3.Incomer control panel board and transformer control panel board with switch gear and indicating meter for I, V, PF, HZ reading indicating lamp for all the 3 phase with ON, OFF, TRIP.
4.Design of trunking with cut out, supporting insulator for bus bar. PVC heat shrinkable insulation for bus bar and cable trench.
5.Designing of Wire dimension for the control wiring, bus bar thickness (10mm 8 mm 6 mm) and cable.
6.As per the IES specification checking distance between phase to phase and neutral.
7.Luminaries design and fitting with distribution box .Earthen the metallic part of trunk and panel board with the earthling bar.
8.Project in charge at
• MTNL substation, B.K.C substation
• Airport Authority of India Mumbai substation

Maintenance Engineer at Spring India Pvt. Ltd.
  • India - Mumbai
  • September 2003 to August 2004

1.Inspection of all the electrical equipment, maintenance and servicing of the motor, checking indoor and outdoor wiring.
2.Installation of the panel board with all the protective kit.

Education

Bachelor's degree, Electrical
  • at pune university
  • March 2003

Higher Secondary class

Specialties & Skills

Operation
MEP MANAGER
Facility Management
chief engineer
Director of engineering
• Comprehensive knowledge of engineering concepts pertaining to construction and maintenance
• In-depth knowledge of HVAC systems, plumbing and electrical maintenance and service
• Familiar with security and safety programs of hotel industry
• Expertizing in supervising personnel, conducting design reviews, establishing schedules, maintaini
• Liaising with Government agencies to ensure full compliance with statutory regulations
• Provide technical direction, engineer and design teams throughout project stages
• Development and implementation of SOP and PM programs • Facilities budget development and control
• Utilization Building Automation Systems • Opera Property Management System • Timesaver Attendance
• P & L Management • Budget Planning • Inventory Control • Procurement
• Green Building • STP
• AutoCAD, Window95/98/2000, MS-DOS, Microsoft Words, Microsoft Excel & Power Point.
negotiation
operations management
maintenance management
asset management

Languages

English
Expert
Arabic
Intermediate
Hindi
Native Speaker

Hobbies

  • Cricket
    Played for school and college team
  • Football
    School And College team