Lead Planning Engineer
ADDAX PETROLEUM
مجموع سنوات الخبرة :52 years, 2 أشهر
Projects Department in Gabon (PORT GENTIL)
•Implemented the preparation, follow up and reporting of all projects which are performed on Addax facilities in Gabon.
•Prepared all Project Control procedure (progress measurement, scheduling and reporting) for all contracted companies which participated to projects construction.
•Managed weekly reports preparation for corporate management Addax head office in Geneva
•Participated to monthly cost report preparation for all projects in execution phase.
•Prepared quarter reports (progress and cost) to Addax corporate management
Construction of a subsea pipeline of 400 km length, from shallow water to very deep water on Cabiunas Area (Pre-salt field).
•Spearheaded for EPCI (Engineering Procurement Construction, Commissioning and installation) a master schedule for Rota Cabiunas 24” (400 km pipeline and submarines structures)
•Written and implemented procedures definitions (scheduling, cost control, progress calculation, reporting, risk analysis, documentation control and invoicing).
•Led and managed a project control a team of 7 persons to follow up all Project control activities
•Implemented follow up procedure and followed up subcontractors (progress and invoicing)
a level 5 EPC schedule for all submarine’s structures, in interface with installation requirements
•Prepared all Project control procedures (schedules levels, risk analysis, progress measurement, cost reporting, yard construction reporting procedure and invoicing)
•Managed and trained all project control resources (planning, cost, risk)
•Spearheaded and led all yard projects schedule as yard
Construction of a new LPG plant for SONATRAC.
•Prepared a level 3 construction schedule in interface with Engineering and procurement.
•Estimated resources and manpower for each phase of construction.
•Managed constructability with Construction method department to check impact on schedule and modify engineering design if necessary
PCON Manager WIPS (Water injection Pump Stations) Project for SAIPEM, for the studies and the construction. (JV SAIPEM-
DHC Project - Seconded to TOTAL DHC Project from
of the Engineering Department (CERT in TOTAL), implemented level 1 to level 4 schedules preparation for studies, procurement and construction works for refineries’ revamping projects:
•West unit in Province in 2003
•D11/CR4 in Normandy in 2002
•DHS FCC in Feyzin in 2002
•VGO HDS in MIDER in 2001
•CR7 (rebuilding after a fire disaster) in Normandy in 2001
•D4/CR5/DGO4 in Provence in 2000
•D9/CR7/DGO2 in Normandy in 2000
•FCC in TOTAL Dunkerque in 1999
•Implemented WBS schedules and construction progress follow up
•Prepared and implemented all schedule Procedures (WBS, schedules level, progress measurement)
Contracted by TECHNIP (Kappa
an Engineering, procurement and construction schedule for VAPO 1 revamp project in CARLING (ATO).
a maintenance politic document for fight system on French Navy ships (Aircraft carrier Charles de Gaulles - Frigate type La Fayette). Spare parts definition to respect the operational availability based on MIL STD 1388 2A & 2B. Maintenance tasks definition.
CAMOM from
, CAMOM Maintenance Dept. of BOUYGUES OFFSHORE.
Prepared maintenance Shutdowns in France and foreign refinery for different client - based in St-Quentin Yvelines - FRANCE
•Planning Engineer in charge of the Preparation and planning of refinery shutdowns