فيليب عوض الله, Senior Project Engineer

فيليب عوض الله

Senior Project Engineer

Kharafi National

البلد
الإمارات العربية المتحدة - دبي
التعليم
دبلوم, PMP course for Fourth Edition
الخبرات
22 years, 7 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :22 years, 7 أشهر

Senior Project Engineer في Kharafi National
  • الإمارات العربية المتحدة - أبو ظبي
  • أشغل هذه الوظيفة منذ يوليو 2011

Project: Saadiyat Island Project, Sewage Treatment Plant STP2 and Main pumping Station

(DHS 450 M)

EPC Contact.

Responsible for the following:
1-monitoring the Main contractor of all the site works from the initiation stage till the closure.
2-Defining the scope of the project, Defining the objective, Analyzing the activity sequences, Durations.
3-Integrating and performing activities accordance with the project management plan.
4-Monitoring the ongoing project activities against the project management plan.
5-Monitoring the performance of the Main contractor,
6-Coordinate the required information by the main contractor from the Engineering department,
7-Quality and safety polices and Checking the snags and checking all the related financial impacts and reply on claims.

Senior Project Engineer acting Lead Structural Engineer في Kharafi National
  • مصر - القاهرة
  • ديسمبر 2010 إلى يوليو 2011

Project: Alshabab and Damietta simple cycle power plants 1500 MW.
EGYPT.

(U.S.$1.2 Billion)

(Fast Track EPC contract)

Responsible for the following:
1-Monitoring KN consultant of all the Engineering works from the initiation stage till the closure.
2-Defining the scope of the project.
3-Defining the objective.
4-Analyzing the activity sequences, durations.
5-Integrating and performing activities accordance with the project management plan.
6-Monitoring the ongoing project activities against the project management plan.
7-Monitoring the performance of the consultant.
8-Coordinate the required information by the construction team and/ or consultants from the client consultant and / or KN consultants.
9-Quality and safety polices and Checking the changing all the transmittals from code 2 to code 1 and checking all the related financial impacts.
10-reply on claims.

Project Engineer في Kharafi National
  • الإمارات العربية المتحدة - أبو ظبي
  • أبريل 2010 إلى ديسمبر 2010

Responsible for the following:
1-Monitoring the Main contractor of all the site works from the initiation stage till the closure.
2-Defining the scope of the project.
3-Defining the objective.
4-Analyzing the activity sequences, durations.
5-Integrating and performing activities accordance with the project management plan.
6-Monitoring the ongoing project activities against the project management plan.
7-Monitoring the performance of the Main contractor.
8-Coordinate the required information by the main contractor from the engineering department.
9-Quality and safety polices and Checking the snags and checking all the related financial impacts and reply on claims.

Kharafi National في Kharafi National
  • الإمارات العربية المتحدة - أبو ظبي
  • نوفمبر 2009 إلى مارس 2010

Responsible for the sub cost center related to the work in Abudhabi projects as junior project manager for the assigned projects by:

1-Defining the scope of the project.
2- Defining the objective.
3- Analyzing the activity sequences, durations, resources and requirements.
4-Integrating and performing activities accordance with the project management plan.
5-Monitoring the ongoing project activities against the project management plan.
6-Monitoring the performance.
7-Quality and safety polices and Checking the snags and assigning a team to complete them.

Project Engineer في Kharafi National
  • الإمارات العربية المتحدة - الشارقة
  • يونيو 2009 إلى أكتوبر 2009

Responsible for surveying the Ministry Of Interiors sites for North Emirates, Preparation of a full detailed report for each site, Preparation of executive summary for each emirate separately, Preparation of weekly progress reports, Classify and Prioritize the sites for each emirates according to its value, The creation of the proposals for the five years plan including pricing and all related cost curves (cash flow, etc.) and the preparation for the final executive report for all the emirates.

Project Engineer في Alshafar Transport and Contracting company
  • الإمارات العربية المتحدة - دبي
  • سبتمبر 2008 إلى مايو 2009

Project: Al furjan villa and terrace homes.
Package (1). Phase (1)
Dubai.

(Dhs 750 Million)

Responsible for Zone (5) and Zone (7) Civil and Finishing works by
Defining the scope of the project, Defining the objective, Analyzing the activity sequences, durations, resources and requirements, Integrating and performing activities accordance with the project management plan, Monitoring the ongoing project activities against the project management plan, Monitoring the performance, Quality and safety polices and Checking the snags and assigning a team to complete them.

Project Engineer في Alshafar Transport and Contracting Company
  • الإمارات العربية المتحدة - دبي
  • نوفمبر 2006 إلى يوليو 2008

Project: ZEN (3) - Discovery Gardens. Dubai.
(DHS 430 Millions)

Responsible for Ziqoo Hotel Apartment (Bldg 11) and Med -West Hotel Apartment (Bldg 12) Civil, Finishing and Interior Decoration works by using the following techniques:
Integration and performing activities accordance with the project management plan, Manage the execution of the work, approvals of suppliers, materials and equipments, Monitoring the ongoing project activities against the project management plan, Monitor the performance, Quality and safety polices, Check the snags and assign a team to complete them.

Project Engineer في Alshafar Transport and Contracting Company
  • الإمارات العربية المتحدة - دبي
  • فبراير 2006 إلى نوفمبر 2006

Project: International city - China City. Dubai.
(DHS 238 Millions).


Responsible for 4 Buildings Finishing works up to turn key stage by using the following techniques:
Integration and performing activities accordance with the project management plan, Monitoring the ongoing project activities against the project management plan, Monitor the performance, Quality and safety polices, Check the snags and assign a team to complete them.

Project Engineer في Alshafar Transport and Contracting Company
  • الإمارات العربية المتحدة - دبي
  • أغسطس 2004 إلى يناير 2006

Project: CASCADES Tower. Dubai Marina (DHS 50 Millions)


Responsible for Civil and Finishing works by using the following techniques:
Defining the scope of the project, Defining the objective, Analyzing the activity sequences, durations, resources and requirements, Integrating and performing activities accordance with the project management plan, Monitoring the ongoing project activities against the project management plan, Monitoring the performance, Quality and safety polices and Checking the snags and assigning a team to complete them.

Site Engineer في Alshafar Transport and Contracting Company
  • الإمارات العربية المتحدة - دبي
  • سبتمبر 2003 إلى أغسطس 2004

Project: The Greens. Dubai
(DHS 150 Millions)


Responsible for Finishing works by using the following techniques:
Integrating and performing activities accordance with the project management plan, Monitoring the ongoing project activities against the project management plan, Monitoring the performance, Quality and safety polices and Checking the snags and assigning a team to complete them.

Site Engineer في Alshafar Transport and Contracting Company
  • الإمارات العربية المتحدة - دبي
  • سبتمبر 2002 إلى أكتوبر 2003

Project: EMAAR Business Park. Dubai.
(DHS 100 Millions)


Responsible for Finishing works by using the following techniques:
Integrating and performing activities accordance with the project management plan, Monitoring the ongoing project activities against the project management plan, Monitoring the performance, Quality and safety polices, Checking the snags and assigning a team to complete them and Checking the snags and assigning a team to complete them.

Site Engineer في Samy Ibrahim Marcous for Paving Roads
  • مصر - القاهرة
  • سبتمبر 2001 إلى سبتمبر 2002

Project: Paving Roads for El Marg, Ain shams and Shoubra


Responsible for Paving the roads by using the following techniques:
Integrating and performing activities accordance with the project management plan, Monitoring the ongoing project activities against the project management plan, Monitoring the performance, Quality and safety polices, Checking the snags and assigning a team to complete them and Checking the snags and assigning a team to complete them.

الخلفية التعليمية

دبلوم, PMP course for Fourth Edition
  • في Cambridge Institute
  • سبتمبر 2011
دبلوم, PMP course for Third Edition
  • في Cambridge Institute
  • أغسطس 2008
دبلوم, Project Management Courses (Project Planning and Control Techniques , Bids and Contracts)
  • في American University in Cairo
  • أغسطس 2001
بكالوريوس, Civil Engineering
  • في Helwan University, Matarya Branch
  • مايو 2001

Specialties & Skills

Civil Engineering
Waste Water Treatment
Construction Management
power plant engineering
Project Management
Microsoft Office
AutoCad
Primavera

اللغات

العربية
متمرّس
الانجليزية
متمرّس

العضويات

Project Management Institute
  • personal
  • August 2008

التدريب و الشهادات

Staad Pro (الشهادة)
تاريخ الدورة:
April 2012
صالحة لغاية:
April 2012