Expérience
16 years, 3 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :16 years, 3 Mois

Construction Manager à MAN Enterprise
  • Qatar - Doha
  • Je travaille ici depuis mars 2008

Experienced civil and environmental engineer with 15 years of experience in the Gulf region (Qatar) with versatile knowledge in various type of projects ranging from infrastructure (micro-tunnelling, horizontal Drilling, trenching, excavation, GRP piping) to road works, to concrete structures with high end finishing coupled with engineering management skills, estimation, and procurement involvement.

Construction Manager
  • août 2015 à février 2017

Umm Obayriah Complex- project value:
85, 000, 000$
Client: H.E Ahmad Bin Abdallah Al Mahmoud
The Umm Obayriah Complex is a luxurious Compound/complex for HE Sheikh Ahmad Bin Abdallah Al
Mahmood. It consists of several 5 stars building such as a 2-story villa- 5000m2/ floor, a 2000 m2
Majless with a Hilal Shape, a mosque, a garage and 6 Km of road and infrastructure works. Our Scope
included all civil, mechanical, electrical and finishes works.
Job Tasks include but not limited to:
• Liaise with client and designer prior to work execution
• Liaise and lead a team of site engineers to deliver the project as per
schedule, cost and quality required
• Construction of a high-end finishing palace with pools and water falls
• Construction + finishing of a luxurious majliss (crest shape with glazing)
• Construction of a 7, 200 m2 lake
• Construction + finishing of an additional floor for an existing labor
accommodation building
• Construction of a garage building with hollow core slabs for heavy
equipment
• Construction of two electrical substations

Section Engineer
  • décembre 2012 à août 2015

West Side four Storey car Park
Project Value 170, 000, 000$
Client: Qatar Foundation
The West Side Car Park is a high quality 2, 959-car park space located in the Qatar Education City. It
provides linkage to the People Mover System (PMS) station for onward travel to final destinations in
Education City. The superstructure car park is four (4) storeys high with an approximate footprint of
45.000 sq.m. The substructure levels consist of a basement level concourse, PMS stations, and a bus
concourse. The external cladding of the building is created by a matrix aluminum section arranged in
three different planes. Staircases, escalators, and lifts are provided to link the basement and upper
levels. Our scope includes the Civil, electrical, Mechanical and finishes works.
Job Tasks include but not limited to:
• Liaise with consultant to deliver the required works as per schedule and
specs
• Liaise and lead a team of site engineers
• Construction and finishing of basement
• Execution of ramps and installations of hollow core slabs

Estimation Engineer
  • avril 2012 à décembre 2012

Responsible for submitting technical and commercial packages and for coordinating with different
departments in order to submit a complete tender.
Job Tasks include but not limited to:
• Evaluate contractor and vendor bid/tender information and variance/change
orders.
• Prepare conceptual and comparative cost study estimates from preliminary
sketches.
• Prepare detailed breakdown of components and elements of estimates for
systems and subsystems.
• Prepare estimates by applying unit rates for man hours labor material and
construction equipment and all-in unit cost determination calculating
extensions and the application of standard factors overhead rates and fees.
• Accumulate evaluate and document historical cost data for the development
of future estimates.
• Review contract documents and contract modifications to determine scope
of work and equitable cost allowance for scope changes.
• Provide coordination and liaison with project management and project
engineering personnel throughout the estimate development.

Section Engineer
  • avril 2010 à mars 2012

North Site Infrastructure Package Project
Project Value: 100, 000, 000$
Client: Qatar Foundation
The Project comprises the construction of 11 km of roads and related infrastructure, including
excavation, construction of a large retention pond, micro tunneling works for storm water pipes,
earthworks and grading, street lighting, treated sewage effluent pipe network, storm water drainage
network, potable water supply network, irrigation, firefighting, and cabling.
Job Tasks include but not limited to
• Excavation and laying of storm and sewer pipes (ESVC, GRP and RC
pipes).
• Dewatering
• Manhole construction.
• Micro-tunneling and installation of RC pipes
• Horizontal drilling for GRP pipes
• Coordination with the concerned parties about existing utilities.
• Coordination with different companies working in the same area/ Interface
meetings.
• Performing and attending safety meetings and toolbox talks
• Laying of electrical cables (11KV and 66KV & 220KV)
• Retention ponds.
• Asphalt works (Sub-grade, sub-base, Base course and wearing course).

Section Engineer
  • avril 2010 à mars 2012

Infrastructure Priority Package Project
Project Value: 100, 000, 000$
Client: Qatar Foundation
The Project comprises the construction of 16 km of roads and related infrastructure including excavation,
construction of a large retention pond, micro tunneling works for foul sewerage pipes, earthworks and
site grading, street lighting, treated sewage effluent pipe network, storm water drainage network, potable
water supply network, irrigation, firefighting, and cabling.
Job Tasks include but not limited to:
• Coordination with Project manager and following up with concerned parties
for diversion of works
• Coordination with the Engineer for getting approval on shop drawings
• Preparation of method statements and material submittals

Site Engineer à MAN Enterprise
  • Qatar - Doha
  • mars 2008 à mars 2010

Project Value: 250, 000, 000$
Client: Qatar Foundation
The project comprises of the undertaking to execute the works pertinent to the National Convention
Center Car Park for the Qatar Foundation. High quality 3, 110-car space public park of five storey high
with an average floor to floor height of 3.6 meters and is approximately 140 meters by 300 meters in
area. The pedestrian underpass is an underground structure approximately 190 meters long
Linking the Car Park to the National Convention Center.

Éducation

Baccalauréat, Civil and Environmental Engineering
  • à American University of Beirut (AUB)
  • février 2008

Green Mall: Building a mall from design concept to environmental impact having landscape on the roof with treatment plants for irrigation purpose.

Specialties & Skills

BUDGETING
CABLING
COMMUNICATION SKILLS
CONSULTING
CUSTOMER RELATIONS
DRIVING
ENGINEERING
AUTOCAD

Profils Sociaux

Site Web Personnel
Site Web Personnel

Le lien a été supprimé pour non-respect des conditions d'utilisation. Veuillez contacter l’équipe d'assistance pour plus d'informations.

Langues

Arabe
Expert
Anglais
Expert
Français
Expert

Formation et Diplômes

Practical Project Management (Formation)
Institut de formation:
MAN Enterprise

Loisirs