popescu cristian dragos, utilities commissioning engineer

popescu cristian dragos

utilities commissioning engineer

chevron

البلد
رومانيا
التعليم
بكالوريوس, engineer ( petroleum)
الخبرات
5 years, 10 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :5 years, 10 أشهر

utilities commissioning engineer في chevron
  • الصين
  • أغسطس 2014 إلى سبتمبر 2015

Chevron - China, Gaoqiao Site, Wellhead and Gas Gathering Facilities.
Detail out and write commissioning procedures and involved in precommissioning, commissioning for following system: Fresh Water System, Instrument and Plant Air System, Fire Water System, Nitrogen System, Fuel Gas System, Flare System, TEG Dehydration, Chemical Injection, Fresh Water System, Jacket Heater System.

Lead Commissioning Technician في Imtech Bolashak (AGIP KCO)
  • كازاخستان
  • مايو 2011 إلى ديسمبر 2013

Imtech Bolashak - Agip KCO, Kazakhstan, Karabatan Field, Onshore Process Plant, Kashagan EP, Eskene West, Sulphur and TGT Unit, Tranch 1/ 2.
Part of Imtech Bolashak Commissioning and Start up team for two Sulphur Recovery and TGT Units.
Performed all steps as per pre-commissioning, commissioning procedure:
Punch list, air blowing and steam blowing of pipe system, dry out / boil out for Reaction Furnace and Condensers, catalyst loading, leak test, N2 purging / Inerting.

Precommissioning Supervisor في Urea Casale (EPSCO)
  • بولندا
  • سبتمبر 2010 إلى أكتوبر 2010

1 September 2010 - 30 September 2010 - Precommissioning Supervisor
Urea Casale - Poland, Zaklady Azotowe - Pulawy, Urea Plant Revamping Project
Part of Urea Casale team involved as technical assistance for the client in all precommissioning activities
Performing all activities required as: punch list, water flushing and air blowing, steam blowing

Precommissioning Supervisor في Tecnica Reunidas
  • المملكة العربية السعودية - الجبيل
  • يناير 2010 إلى أبريل 2010

Tecnicas Reunidas - KSA, Al Jubail, Saudi Kayan Petrochemical Facilities - Phenolics Facilities
Part of Tecnicas Reunidas Precommissioning team involved in precommissiong activities in plants as Phenol
and Cumene Unit.
Performed all steps as per pre-commissioning procedure: punch list, water flushing and air blowing, reinstatement, leak test, catalyst loading, steam blowing.

Utilities Commissioning Superintedent في Yemgas (M.W.Kellogg)
  • اليمن
  • أبريل 2009 إلى يونيو 2009

Yemgas (M.W.Kellogg) - Yemen, Balhaf, LNG Plant
- 4 x 22, 4 MW Gas Turbines by GE;
- 3 x 50t/h Auxiliary Boiler by Bono Energia;
- 3 x 37, 1 t/h Desalination by Entropie;
Part of Yemgas team involved in commissioning activities in various area of the plant as:
Boilers, Gas Turbines, Desalination Unit, Air Compressor, Potable Water System, Fire Fighting System,
Fuel Gas Station, Effluent Water Treatment.
Before to start up of equipment, routine check to be carried out to ensure that all systems are ready
to be operate. The connected system should be lined up as Chemical Dosing System, Boiler Feed Water System
LP and Condensate System, Polish Water System.

Process Trainer في Agip ECU - Egypt, Petrobel, Abu Madi, NGL Plant
  • مصر
  • يناير 2008 إلى مارس 2009

Agip ECU - Egypt, Petrobel - Belaym, Abu Madi, NGL Plant
On the job training (OJT) for Agip KCO, involved in training, assessment, evaluation process assisted in Petrobel, Abu Madi, NGL Plant (LTS Unit, LPG Unit, El Qar’a Unit

الخلفية التعليمية

بكالوريوس, engineer ( petroleum)
  • في oil&gas university -ploiesti,romania
  • أغسطس 1994

engineer - diploma

Specialties & Skills

Microsoft Office software & the Internet- Expert.

اللغات

الانجليزية
متوسط