Expérience
22 years, 8 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :22 years, 8 Mois

Projects Manager à Serimax, A Vallourec Company
  • Arabie Saoudite - Dammam
  • mai 2022 à juin 2023

COMPANY: SERMIAX SAS, A VALLOUREC GROUP COMPANY (2022)
Worldwide track record in orbital welding solutions - integrity management, pipe-end inspection, and field-proven digital services - to improve operational efficiency while meeting the most stringent industry requirements.

Role: Projects Manager

Responsibilities: Managing multiple projects across different regions of Saudi Arabia. Responsible for Complete Administration of the contract, Liaison with client representatives, ensure the project respects the Health & Safety standards required by the Client and Company (SERIMAX/ Vallourec), Management coordination, P&L Accountability and reporting, support for Engineering and Personnel, Mobilisation of personnel and equipment and Safety of all personnel, Ensuring excellence in the Operations.

Projects:
1. KENT Khurais Trunkline 2 Replacement Project
2. NBC Zuluf Field Development Project

Project Manager à Jubail Water and Power Company
  • Arabie Saoudite - AlJubail
  • août 2019 à juillet 2021

KEY SKILLS

• PROJECT MANAGEMENT:
o Managing all phases of Project lifecycle - from Inception to Completion and handover to Operational phase. Deliverables as per pre-defined KPIs.
o Create Project Charter/ work scope, define Objectives, Responsibility Matrix, complete Resource Planning and Resource Loading, Vendor selections, coordination between various departments/ teams, managing Design Consultants, Project Management Consultants, Fabricators and EPC Contractors.
o Performing Risk Analysis and creating Mitigation Plans, Budgets and Financial plans.
o Reporting of Financial Parameters (Revenue Recognition/ Realisable Sales Value based on both Cost-to-Cost method/ POC accounting) to CEO/ Project Directors..

• PROJECT EXECUTION:
o Procurement, Fabrication, Inspection and Installation of
 Process Equipment,
 Piping and pipelines,
 Structural Steel works,
 Storage Tanks (Floating and Fixed roof) & pressure vessels
o Preliminary review of designs, drawings and datasheets. Ability to review
Single line diagrams, plot plans, Process Flow Diagrams (PFD), P&IDs, General Arrangement Drawings in line with Client/ project specifications.
o Participate in Safety Studies (HAZOP), Design review, 3D Model review, Constructability review etc.
o Coordinating with other disciplines, clients, consultants, subcontractors and suppliers achieving all milestones & deadlines.
o Managing project quality assurance based on Quality Plans and Inspection & Test Plans (ITP).
o Conducting site surveys, field tests and commissioning of equipment.

• PROJECT PLANNING:
o Preparing Project Charters and defining project requirements, preparation of project execution plans (PEP) and reviewing project management plans (PMP).
o Project planning & scheduling using Primavera & MS Project,
o Preparation of work breakdown structure (WBS) & Gantt charts and resource planning.
o Resource Allocations - manpower, plant & machinery aligned to overall project schedules.
o Scope verification, scope control and change management.
o Preparing project progress reports, financial forecasts and look ahead schedules.
o Maintaining project documentation complying with ISO 9001 requirements, preparing final project documentation and coordinating project close-outs.
o

• TENDERING: Interpreting tender documents of large multidisciplinary projects and contribute to the development of bids & quotations.
PROJECT DETAILS (1999 - 2022):

COMPANY: JWAP (Jubail Water And Power Company, world’s largest Integrated Water and Power facility) (2019-2021), Project Details:

1. Project: Product Water Bypass header for SWCC and Marafiq line, Saudi Arabia (an ENGIE, ACWA POWER and MARAFIQ owned project)
Product Water bypass header design, procurement, fabrication, installation, hook-up, commissioning for World's largest Integrated Power and Water plant. For supply of 2744 MW Power and 800, 000 Cum/ day of desalinated water to Saudi Eastern Province. The project was a very high value, fast track project with high visibility from the Government side.

Role: Project Manager/ Project Consultant

Responsibilities: Responsible and Accountable for managing the complete project from Owner’s side, supervising the Project Management Consultant, Owner Engineers, Design Consultant and the EPC Company. Reporting of progress and financial parameters to CEO, CTO/ Senior Management and also regular reporting to shareholders of the company.

Achieved before-time, successful hook-up of new facilities during complete plant shutdown, thereby saving time and cost and received special appreciation from CEO of company. Maintained Company target of ZERO LTI.

Project Manager à Schlumberger
  • Émirats Arabes Unis - Dubaï
  • juillet 2008 à janvier 2019

PROJECT DETAILS:

1. Project: Jurrasic Early Production Facility, (EPF for Umm Niqa, Sabriya and East Rudhatain Fields in Kuwait)
Client: Kuwait Oil Company (KOC), Kuwait, 2017-18
Role: Package Manager - Managing big value order for wide range of Pumps (mainly Centrifugal pumps), working as back to back with Lead Project Manager and managing site construction etc. Also working as INTERFACE MANAGER for various disciplines.

2. Project: Anaguid Gathering Plant (AGP) Early Production facility (EPF)
Client: OMV Tunisian Production GmbH, Tunisia, 2016
Role: Construction Manager

3. Project: Water Separation facility
Client: Petrogas RIMA, Oman, End User PDO, Oman, 2015
Role: Project Manager

4. Project: Early Production Facility (EPF)
Client: EXXON Mobil, Indonesia, 2014
Role: Project Engineer and Construction Engineer

5. Project: Produced Water treatment package
Client: TOTAL, Nigeria, 2013
Role: Project Manager

6. Project: Produced Water Treatment package, Umm Lulu development project
Client: L&T and ZADCO, Abu Dhabi, 2012
Role: Project Manager

7. Project: Produced Water Treatment package
Client: ENI SPA, Italy, Agiba Petroleum Egypt, 2011
Role: Project Manager

8. Project: Supply of Oil in Water Analyzers for Abu Dhabi Crude Oil Pipeline (ADCOP)
Client: China Petroleum Engineering and Construction Corporation (CPECC), Abu Dhabi, 2010
Role: Project Manager

9. Project: Produced water treatment package
Client: Iranian Offshore Oil Company (IOCC) Iran, 2008/2009
Role: Project Manager

Project Engineer à Overseat AST Co LLC
  • Émirats Arabes Unis - Dubaï
  • avril 2007 à juillet 2008

10. Project: Chilled water piping network for Dubai Metro
Client: Cansult Maunsell & Tabreed, Dubai, 2008
Role: Planning Engineer

11. Project: Chilled water piping network for City of Arabia, Dubai
Client: Parsons & Tabreed, Dubai, 2007
Role: Planning and Project Engineer

Planning Engineer à Mukand Engineering Limited
  • Inde - Mumbai
  • juin 2006 à mars 2007

Planning Engineer, Jun 2006 to Mar 2007

12. Project: Green Fuels & Emission Control (GFEC) Project, Structural & Piping works
Client: Hindustan Petroleum Corporation Limited (HPCL), Mumbai refinery, India 2006
Role: Planning Engineer

Site Engineer/ Planning Engineer à Larsen & Toubro Limited
  • Inde
  • août 1999 à juin 2006

Site Engineer & Planning Engineer, Aug 1999 to Jun 2006

13. Project: Coal handling unit (Stacker Re-claimer & Conveyer) for Thermal Power Plant
Client: National Thermal Power Corporation (NTPC), Kahalgaon India, 2005
Role: Planning Engineer

14. Project: Blast furnace Installation
Client: Steel Authority of India Limited (SAIL), Rourkela Steel Plant, India, 2004
Role: Planning Engineer

15. Project: Fabrication and Installation of Wagon Tippler and Side Arm Charger, Cement Plant expansion project
Client: Ultratech Cement, Jharsuguda, India, 2003
Role: Project Engineer

16. Project: Edible Oil Refinery Expansion project
Client: Acalmar Oil Limited, Haldia, India, 2002
Role: Project Engineer

17. Project: Fabrication & erection of Boiler & Coal bunker, Thermal Power Plant
Client: National Aluminium Company (NALCO), Orissa, India, 2001
Role: Site Engineer (Fabrication and Installation)

18. Project: Fabrication & erection of Crude oil tanks (Floating and fixed roof) for Refinery expansion project
Client: Indian Oil Corporation Limited, (IOCL), Barauni, India, 2000
Role: Site Engineer (Fabrication and Installation)

19. Project: Fluidized Catalytic Cracking Unit (FCCU) for Refinery expansion project
Client: Indian Oil Corporation Limited, (IOCL), Barauni, India, 1999
Role: Site Engineer (Fabrication and Installation)

Éducation

Master, MBA
  • à Xaviers
  • novembre 2023
Baccalauréat, Management Studies
  • à Xaviers
  • octobre 2021
Diplôme, Mechanical Engineering
  • à RKM Shilpapitha
  • juillet 1999

Basic Education: Diploma in Mechanical Engineering (1999)

Specialties & Skills

Vendor Management
Client Communication
Construction Management
Project Management
Project Planning
MS Project
MICROSOFT PROJECT
PRIMAVERA P3
Project Management
Project Construction Management
Project Planning

Langues

Anglais
Expert
Hindi
Expert
Bengali
Expert

Adhésions

of PMI (Project Management Institute)
  • Member

Formation et Diplômes

Certificate no. 0561/0 (Certificat)
Date de la formation:
June 2011
Valide jusqu'à:
June 2011

Loisirs

  • Sports and Exercise
    I love to exercise (Cardio and weight lifting)