pravin singh, Sr.Process Designer

pravin singh

Sr.Process Designer

SAMSUNG ENGINEERING

Location
India - Vadodara
Education
High school or equivalent,
Experience
11 years, 1 Months

Share My Profile

Block User


Work Experience

Total years of experience :11 years, 1 Months

Sr.Process Designer at SAMSUNG ENGINEERING
  • Saudi Arabia - Jubail
  • September 2010 to December 2015

Objective
 Seeking an innovative and challenging position as Senior Process Designer where my skill can be fully utilized and improved to contribute toward growth and development of organization and myself.
Overview
 An Innovative mind, having 11+ years Design experience in Oil & Gas, Petrochemical projects and an excellent academic background.
 Well versed in the application of various design software’s like Smart Plant P&ID, Smart sketch Micro-station, AutoCAD, MS Visio.

 Job Responsibilities:-
• P&ID, PFD, MSD development & modification.
• P&ID checking (Both Hard & Soft copy).
• Creation / Modification of symbols as per project standard,
• Customization of Line list, Equipment list, Instrument list etc, .
• Creation / Modification of intelligent label (for data input) and dumb labels
• Maintaining drawing Backups, Utilizing the SPPID utilities, Troubleshooting SPPID problems,
• Database Checking.
• Coordination between two offices, Notification of problems and requirements to system
Supporters etc, .
• Coordination with Process Engineers & clients and fulfil their queries.
Specialties: SmartPlant P&ID, Smart Sketch, Microstation AutoCAD.

Work Experience
SAMSUNG ENGINEERING (Saudi Arabia) From Sept.2010 to Dec 2015
Samsung Saudi Arabia Co., Ltd. (SSA) is positioned as one of the major EPC contractors in the Petrochemical, Oil and Gas, and Refinery plant sectors in the Kingdom since its establishment in 1999 by Samsung Engineering Company Limited based in Seoul, Republic of Korea.
In 1999, Samsung Saudi Arabia was established and has since then established solid partnerships with key private and national companies in the region after successfully delivering the region’s most complex mega projects.
Selected in 2011 as one of the “Top Oil & Gas EPC contractor in the GCC for 2011, ” by MEED and Oil & Gas Middle East Magazines, Samsung Engineering is dedicated to delivery projects on-time and safely, while seeking maximum value for clients.

Designation: Senior Process Designer
1. Project : Refinery off Gas Project. (ROG) (Sep 2015- Dec 2015).
Client : SATORP.
Preparation of P&IDs, PFDs, MSDs using Microstation, Autocad, for Refinery off Gas Project. (ROG)
 (approx no of documents - 15)
2. Project : Riyadh Clean Transportation Fuels Refinery Project. (Mar 2013- Dec 2015).
Client : Saudi ARAMCO.
 Preparation of P&IDs, PFDs, MSDs, Data Sheet using SmartPlant P&ID, SmartSketch, Autocad, Microstation, Auto-Sacs for Riyadh Clean Transportation Fuels Refinery Project.
(approx no of documents - 450)
 Assist in SmartPlant P&ID Administration activities.
3. Project :CO2 Capture and Injection facilities -Hawiyah/Uthmaniyah.(Jun 2011-Dec 2014 ).
Client : Saudi ARAMCO.
Role and Responsibilities:
 Preparation of P&IDs, PFDs, MSDs, C&Es & SFD using Autocad, Microstation SE,
Smart Plant P&ID for CO2 Capture and Injection facilities. (approx no of documents - 160)

 Preparation of P&IDs, PFDs, & MSDs using Autocad, Microstation SE, Smart Plant P&ID for Basic Engineering package of Sharq 3EG expansion project. (approx no of documents - 80)
 Assist in SmartPlant P&ID Administration activities.

4. Project : ARAMCO COGEN IPP (PROPOSAL).
Client : Saudi Aramco (Plants: Abqaiq, Ras Tanura & Hawiyah)
Role and Responsibilities:

 Preparation of P&IDs, By Autocad, (approx no of documents - 120).

Process Designer at L&T-Chiyoda Limited
  • India - Vadodara
  • February 2006 to August 2010

L&T-Chiyoda Limited, Baroda, (India). From Feb. 2006 to Aug. 2010
L&T-CHIYODA LIMITED (LTC) is an engineering consultancy organization formed by Larsen & Toubro Limited, India's premier engineering, manufacturing and construction company (holding 50% equity) & Chiyoda Corporation, Japan, world renowned Engineering Company with five decades of experience in Hydrocarbon and related fields (holding 50% equity).

Designation : Process Designer.
1. Project : JERP - Delayed Coker Unit (Sep 2009-Aug 2010).
Client : Saudi ARAMCO & TOTAL, KSA.
Role and Responsibilities:
 P&IDs Preparation using SmartPlant P&ID. (approx no of P&ID - 140)
2. Project : FEED for Shell Claus Off Gas Treating (SCOT) & Bukom Gasoil Investment Strategy (BUGIS) (Sep 2009-Mar 2010).
Client : Shell Eastern Petroleum Ltd. (SEPL), Singapore.
Role and Responsibilities:
 P&IDs Preparation using SmartPlant P&ID. (Apprx. No of P&ID -125)
3. Project : FEED for LNG - PNG (Oct 2008 - Jul 2009).
Client : Esso Highlands Limited, Papua New Guinea.
Role and Responsibilities:
 P&IDs Preparation using SmartPlant P&ID. (Apprx. No of P&ID -560)
4. Project : LNG Plant (Aug 2008 - Oct 2008).
Client : Qatar Gas.
Role and Responsibilities:
 Test Block Diagram
Platform : SmartSketch.
5. Project : Sulphur Recovery Unit and Associated Facilities (May 2008 - Sep 2008).
Client : Indian Oil Corporation Ltd.-Gujarat.
Role and Responsibilities:
 P&IDs Preparation using AutoCAD. (approx no of documents - 186)

6. Project : Lube Oil Base Stock Quality Upgradation (LOUP) (Nov 2007 - Apr 2008).
Client : Hindustan Petroleum Corporation Ltd.-Mumbai.
Role and Responsibilities:
 P&IDs PFD, MSD Preparation in AutoCAD.

7. Project : GRD Minopac Ltd. Australia (Jun 2007 - Aug 2007).
Client : Vale.
Role and Responsibilities:
 PFDs Preparation using Microstation. (Apprx. No of PFD -50)

8. Project : Refinery Gas Desulphurization Project (Oct 2006 - May 2007).
Client : Bahrain Petroleum Co., Bahrain.
Role and Responsibilities:
 P&IDs Preparation using AutoCAD.

9. Project : Melaka Group III (MG3) Lube Base Oil Project (Oct 2006 - Jan 2007).
Client : Petronas-Malaysia.
Role and Responsibilities:
 P&IDs Preparation using Microstation. (Apprx. No of P&ID -57)

10. Project : BAUP (Feb 2006 - Sep 2006).
Client : BA Energy Heartland Upgrader Project, Canada.
Role and Responsibilities:
 P&IDs Preparation using AutoCAD.

Process Designer at Polytech Engineers
  • India - Vadodara
  • December 2004 to January 2006

Polytech Engineers (Baroda) From Dec. 2004 to Jan. 2006

Designation : Process Designer.

1. Project : 445 MV Konaseema Power Project (Oct 2005 - Jan 2006).
Client : L&T Energy Centre Baroda.
Role and Responsibilities:
 Preparation of E & I Layout, Modification of Fabrication Drawing as per instruction.
 Cable Tray Routing Drawings, Logic Diagrams, Control Loop & Hook-up Diagrams.

2. Project : 338.5 MW Vemagiri Power Project (Dec 2004 - Sep 2005).
Client : L&T Energy Centre Baroda.
Role and Responsibilities:
 Preparation of E & I Layout, Cable Tray Routing Drawings, Logic Diagrams, Control Loop & Hook-up Diagrams.
 Preparation of Structural Drawings for Second Latch Pad Project. ISRO-Shar Centre,
Sriharikota.

Education

High school or equivalent,
  • at GSEB
  • January 2005
High school or equivalent, Mechanical Draftsman
  • at Industrial Training Institute
  • January 2004

Application :

High school or equivalent,
  • at GSEB
  • January 2002

Specialties & Skills

ADOBE PREMIERE
AUTOCAD
MICROSTATION
SmartPlant P&ID

Languages

English
Expert
Hindi
Expert
Gujarati
Expert

Hobbies

  • Playing Cricket