engineer
حقول الجبسة
مجموع سنوات الخبرة :32 years, 2 أشهر
-Waste heat boiler ( exaust gasas and fuel gas )
MEEngineering - England
-Centrifugal compressor with 3 stages ( BORSIG -
Germany ) driven by a gas turbine ( TSSI - Holland ) via
gearbox
-Supervisory computer for the turbine - compressor train
Start - up engineer at the interconnection between the
Existing Plant and the Extention one .
-
of the separating and sweetening units, which
include :
- Gas Sweetening - Diethanolamin ( DEA ) unit
Gas Sweetening -Methyldiethanolamin (MDEA ) unit-
Gas drying and C4 recovery-
- Stabilization and LPG Production
Fuel Gas distributio-
-Control of the gas pipeline between Jbisseh Gas Treatment Plant and
Homs Fertilizer Plant
-Commisioning and start-up engineer for Extension of the Jbisseh Gas
Treatment Plant, builded and commissioned by Industrialexport SA-
Romania in control room ( ABB Kent Taylor - England ) and in the following
units :
- Gas Sweetening - Diethanolamin ( DEA ) UNIT
Regeneration fuel gas heater unit controlled by PLC-
-Lean DEA Precoat filter unit controlled by PLC
Shieft enginer in the Control room (
,
courses: : Employed in Syrian Petroleum Company – Jbisseh Oil Fields Management .