بشير المأمون محمد الأمين محمد الأمين, مهندس مقيم

بشير المأمون محمد الأمين محمد الأمين

مهندس مقيم

Discovery General Contracting

البلد
الإمارات العربية المتحدة - أبو ظبي
التعليم
ماجستير, Water Supply Engineering
الخبرات
37 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :37 years, 2 أشهر

مهندس مقيم في Discovery General Contracting
  • الإمارات العربية المتحدة - أبو ظبي
  • أشغل هذه الوظيفة منذ ديسمبر 2016

Position: Project Manager

SCOPE OF WORK:
Construction of concrete foundation for a pipe Mill at Al Taweela, the mill consists of many activitie such as main process building, handling Areas, Electri Roos 1 & 2, Offline Straightner, Gas Cutters 1 & 2, Plate Charging Plate, Edge milling Machine, Semi Gantry, magnetic particle tester, Tack Welder, Water Tanks
Responsibilities:
Coordination with the Main Contractor, following excusion of works as per the scheduled program and preparation of monthly bills


March 2017- to-Date
Contract Nos. 16068-C001 and 15060-C001
Client : CM W

Position: Poroject Manager
Scope of Work:
1/ Contract no. 16068-C001:
Various Constructions for Support Forces at Al Nahyan Camp-Supporting Unit
2/ Contract no. 15060-C001:
Various Constructions for Seeh Al daee Camp - Al Ain.
Responsibilities:
Coordination with the CMW, following excusion of works as per the scheduled program and preparation of monthly bills.
The Works consist of the following:
1/ Buildings constructions with all required finishes, such as plaster, waterproofing system, tiles, electrical and A/C works, doors etc….
2/ Infrastructure works such as Internal Roads, Electrical, Telecom, Fire Fighting A/C works & connection to M/s TABREED existing line of 6” dia

في Khatib & Alami
  • الإمارات العربية المتحدة
  • مارس 2011 إلى مارس 2014

March 2011- to Date
Khatib & Alami, Abu Dhabi, UAE

في TRANSCO
  • الإمارات العربية المتحدة
  • مارس 2011 إلى مارس 2014

Khatib & Alami, Abu Dhabi, UAE
Client:TRANSCO

March 2011- to Date
Position: R.E
Mussafah Water Transmission Scheme (MWTS), Mussafah to Abu Dhabi, Lot M, EPC Contract No. N4268.2

SCOPE OF WORK: The scope of work is including, but not limited to the following three packages: 1.1 Package M1A: Modification in Lot F Pump Station to interface, Feed and Control the Lot M Pipeline Packages M2 and M3 - Engineering, Design, Supply of Materials and Equipment, Construction, Installation, Testing, Pre-commissioning, Commissioning, including trial and initial operation), handing over and warrant the work (during the maintenance period for the following: 1) Modification in Lot F Pump Station (currently feeding DN 1200 Lot F pipeline) to also interface, feed and control the Lot M DN1600 pipeline Packages M2 and M3 towards Abu Dhabi Island. The work shall in principle take place within the plot of existing Musaffah Pumping Station (Lot D & Lot F) including the following: 2) Extend the Lot F Pump Station DN 1200 discharge pipeline to tie-in with the Pipeline Packages M2 and M3 inciuding all the piping works, control valves, bypass, shut-off valves, flow meters, additional by-pass headers and all the associated civil works, valve chambers, etc.
3) Complete detailed hydraulic study (steady and surge) for the common supply system with different operating scenarios using existing Lot F pumps to concurrently feed both Lot F and Lot M pipeline towards AI Wathba and Abu Dhabi Island respectively
4) All the electrical and mechanical works including suction side surge vessels connecting to and using existing discharge side surge vessel (provisional), new hypo-chlorination dosing pumps, new injection and sampling arrangement and electrical supply to all the new project components.
5) All the new / modified I&C system to monitor and control Lot F pump station and Lot F & Lot M pipeline.
6) PLC/SCADA Control system for the pipeline, shelter, interfaces to Load dispatch Centre (LDC) and interface with the existing control system.
7) All the ancillary equipment, valves, sump pump, electrical and I&C works along the Pipeline Packages M2 & M3.
8) All associated civil works such as piping, chambers, foundations, support blocks, surge vessel foundations including piling works and soil replacement.
1.2 Package M2: DN 1600 Pipeline from Lot F Pumping Station at Musaffah up to Musaffah interchange - Engineering, Design, Supply of Materials, Construction, Installation, Testing, Pre-commissioning, Commissioning (including trial & initial operation), handing over and warrant the work during the maintenance period of approximately 13.8 km of ON 1600 pipeline from Lot F Musaffah Pumping Station up to Musaffah Interchange including NDRC works, connection to the existing 2 x ON 900 D.1. Pipelines connecting Umm AI Nar pump station to Unit IV pump station. Supply & installation of field instruments along the branch pipelines, laying Dual redundant Fiber Optic Cables (FOC) along the new pipeline routes as mentioned above. The dual redundant fiber optic cables shall connect Lot-F pump station with the common junction and Umm AI Nar RTUs via dual redundant configuration network. Supply, installation and testing of inline closure, etc., patch panels and all auxiliaries as required. Commissioning of pipeline FOC and branch field instruments. All other associated civil and earth works, instrumentation etc. shall be carried out by the Contractor.

1.3 Package M3: DN 1600 Pipeline from Musaffah interchange up to Abu Dhabi - Engineering, Design, Supply of Materials, Construction, Installation, Testing, Precommissioning, Commissioning (including trial & initial operation), handing over and warrant the work during the maintenance period of approximately 16.0 Km of DN 1600 pipelines from Musaffah Interchange up to Abu Dhabi at IP 135 including NRDC works, the crossing of Maqta channel by2 x DN 1200 C.S. pipeline using horizontal directional drilling (HDD) method including short length of DN 1400 pipeline. Connection to the existing 3 x DN 800 D.1. Pressure Ring Main (PRM) pipelines, provision of future connection to Hodayrat Island, DN 1200 pipelines for a distance of approximately 2.5 km from IP 135 up to IP 58B via IP 59, connection to existing DN 900 pipeline running to Unit I at IP 59 and connection to the existing DN 1000 Pressure Ring Main-PRM pipeline at IP 58B. Supply & installation of field instruments along the pipeline branches, laying of dual redundant Fiber Optic Cable (FOC) along the pipeline and also Dual redundant Fiber Optic Cables for interfacing with four interface points in Dhabi. Supply, installation and testing of inline closure, etc., patch panels and all auxiliaries as required. Commissioning of pipeline FOC and branch field instruments. All other associated civil and earth works and instrumentation works etc.

Duties and Responsibilities are:
1) Review of Civil material submitals & Method Statements as per Contract Specifications.
2) Inspection of Civil materials received on site ..
3) Correspondance/ coordination meetings with Government Departments, other consultants and Contractors.
4) Approval of site works, including pipeline, civil and NDRC works.
5) Site progress meetings
ITALCONSULT, Abu Dhabi, UAE

في ITALCONSULT
  • الإمارات العربية المتحدة
  • أكتوبر 2009 إلى مارس 2011

October 2009 - March 2011
ITALCONSULT, Abu Dhabi, UAE

في ADDC
  • الهند
  • أكتوبر 2009 إلى مارس 2011

Client:ADDC (Abu Dhabi Water Distribution Company)

October 2009 - March 2011
Position: R.E
Water Supply To New Plots Located Along The Coast Line In Al Radeem Area, Contract No. D 9811

A Main Contract: • Construction of approx.4.2 km of OD 335 mm and 4.1 km of OD 225 mm HDPE line PE100+ SDR 11 pipelines for the water supply to new residential plots located along the coast line in Al Radeem, Mirfa, including valve chambers, fire hydrants and house connections.
• Connection of above new pipeline system to the existing D.I. 300 mm pipeline supplying the Mugaira Palace at Mirfa.
• Construction of one (1) DN200 mm area metering unit and one (1) DN100 mm bulk metering unit.
B V.O.1 Water Supply to Mr. Ahmed G. Al Suwaidi's Rest House at Ruwaisia
• Construction of approx.2.214 km of OD 225 mm and 1.295 km of OD 180 mm HDPE line PE100+ SDR 11 pipelines for the water supply to Mr. Suwaidi Rest House at Ruwaisia, Mirfa, including valve chambers, fire hydrants and house connections.
• Connection of above new pipeline system to the existing D.I. 600 mm pipeline
• Construction of one (1) DN200 mm area metering unit
• NDRC crossings
C V.O.2 Water Supply to ENEC Compound in Jabal Baraka - Western Region
• Construction of approx.60 m of DN400mm D.I. to be connected to the existing DN1000mm Jabal Dhana ( Shuweihat) - Silaa transmission pipeline, including a DN300mm interface metering and control unit as per TRANSCO requirements.

Duties and Responsibilities are: 1) Review of all material submitals and recommendation for ADDC approval as per Contract Specifications.
2) Inspection of all materials received on site and approval of RCDRs
3) Approval of payments.
4) Arrangement for progress meetings.
5) Correspondance/ coordination meetings with Government Departments, other consultants and Contractors.
6) Approval of site works.
7) Writing of progress reports.

في Halcrow International Partnership
  • الإمارات العربية المتحدة
  • أكتوبر 2006 إلى أكتوبر 2009

October 2006 - to October 2009
Halcrow International Partnership, Abu Dhabi, UAE

في ADWEA
  • الإمارات العربية المتحدة
  • أكتوبر 2006 إلى أكتوبر 2009

Halcrow International Partnership, Abu Dhabi, UAE
Client:ADWEA (Abu Dhabi Water and Electricity Authority)

October 2006 - to October 2009
Position: R.E

Water Distribution Network to Industrial City of Abu Dhabi (ICAD) Extension Phase1, Contract no. D 6143

a) ICADII (main contract)
Supply, installation and construction of new D.I. and SDR17 HDPE pipelines sizes DN1200 through DN80mm, including Line Valves, Control Valves, Sector Measuring Points, Fire Hydrants, connection to existing network, construction of Bulk Consumer Chambers, House Connections, NDRC works, Gas lines crossing (NDM) and all associated mechanical & civil works necessary to successfully complete the works. Total cost of project is 55, 142, 374 Dhs.

b) Water Supply to Al Wedaihi Farms (V.O.1)
Supply, installation and construction of new Ductile Iron and SDR11 HDPE waterlines sizes DN600 through DN250mm including Line Valves, Control Valves, Sector Measuring Points, connection to 2 nos.existing DN600 pipelines, connection to existing tanks, exhumation of existing pipelines feeding existing tanks, NDRC works, Gas lines crossing (NDM) and all associated mechanical & civil works necessary to successfully complete the works. Total cost of VO1 is 16, 206, 160.03 Dhs.

Duties and Responsibilities are:
1) Review of all material submitals and recommendation for ADWEA approval as per Contract Specifications.
2) Inspection of all materials received on site and approval of RCDRs.
3) Approval of payments.
4) Arrangement for progress and coordination meetings.
5) Correspondance/ coordination meetings with Government Departments, other consultants and Contractors.
6) Approval of site works.
7) Writing of progress reports.

في Maunsell Consultancy Services Ltd
  • الإمارات العربية المتحدة
  • أغسطس 2003 إلى أكتوبر 2006

August 2003 - to October 2006
Maunsell Consultancy Services Ltd. Abu Dhabi, UAE

في Al Ajban Army Camp and Zayed Military City
  • أغسطس 2004 إلى نوفمبر 2005

August 2004- November 2005
Water Supply for Al Ajban Army Camp and Zayed Military City

Position: R.E.
The Water Supply for Al Ajban Army Camp and Zayed Military Citiy project involves the following:
1) construtcion of DN300 transfer main to supply the proposed water tank in Al Ajban Army Camp from the existing DN1000 transfer main from Sweihan to Almaha Forest. The total is 6.6km
2) construtcion of DN600 transfer main to supply the proposed 15 MG water tanks in Zayed Military Citiy originating from the existing DN600 supplying the existing tanks in Zayed Military Citiy .The total length was 9.4 km

Duties and Responsibilities are:
1) Review of all material submitals and recommendation for ADWEA approval as per Contract Specifications
2) Inspection of all materials received on site and approval of RCDRs.
3) Approval of payments.
4) Arrangement for meetings.
5) Correspondance with Departments/other consultants.
6) Approval of site works.
7) Writing of progress reports.

في Shuweihat
  • الإمارات العربية المتحدة
  • أغسطس 2003 إلى أغسطس 2004

August 2003 - to August 2004
Shuweihat Water Transmission Scheme
Position:A.R.E.
Shuweihat Water Transmission Scheme involves the bulk transfer of desalinated water from a new plant at Shuweihat to Mussafah in Abu Dhabi a distance of 250 Km.Maunsell has been awarded the design and supervision works for Lot "A", which constitues a twin 1600 pipeline, 97km long, running from Shuweihat Desalination Plant to an itermediate Pumping Station at Mirfa in the western region of Abu Dhabi. Pipeline materials have been awarded for Ductile Iron pipes (Pont-A Mousson and Kubota) .The pipelines pass through salt laden (sabkha) areas with a high water table for the majority of the route.The pipelines are mainly constructed above natural ground level in earth bunds with service track on one side.Zinc/bitumin pipes are used in earth bund and Polyurethane pipes for underground areas.

Duties and responsibilities are:supervision and inspection of different types of construction of pipe laying from type I to type IV start from setting out of ROW, clearing and grubbing, excavation to formation level, laying of geotextile 1st layer, bund formation up to 300mm above pipe, excavation of trench, laying of geotextile 2nd layer, sand bedding, pipe laying, backfilling of sand surround, complition of bund, fiber optic cable and final layer of gatch material as top protection.Involved in concrete structures like Thrust Block for wash out tees and bends, Double wash out chamber, Shutoff valve chamber, Bypass valve chamber and Air valve chamber.Also involved in non distubtive road crossing (NDRC) using micro tunnelling equipment, pressure test up to 25 bars, flushing, disinfection, inspection of materials on site, writing of weekly reports to R.E., reviewing of inspections requests and check lists submitted by inspectors prior for approval of R.E.

في GIBB LTD
  • الإمارات العربية المتحدة
  • أبريل 2002 إلى يوليو 2003

April 2002-to July 2003
GIBB LTD, Abu Dhabi, UAE

في ADWEA
  • أبريل 2002 إلى يوليو 2003

April 2002_-to July 2003
GIBB LTD, Abu Dhabi, UAE
Position: A.R.E.
Client:ADWEA

Fully participating in the following:-
• Installation of 1200, 600, 400, 300 and 200 mm Dia. Ductile Iron Pipeline Network with all fittings in Abu Dabi Industrial City, Mussafah (ICAD I). Contract No, D 00-0032.The budget of the project is about 36 millions and the total length of the Network is about 50 km (ADWEA)
• Concrete work for chambers, thrust blocks and pipeline anchors.
• Road crossing by open cut.
• NDRC ( auger boring)
• Chamber water tightness test and tanking.
• Hydraulic pressure test (Initial and final)
• Flushing and disinfection
• Connection to the existing lines
• Material approval as per Contract Specifications.

Major Responsibilities
• Assisting the Resident Engineer.
• Inspection and approval of materials received on site as per Contract Specifications.
• Inspection and approval of executed works.

في Mott MacDonald Ltd
  • الإمارات العربية المتحدة
  • مارس 2000 إلى أبريل 2002

March 2000 - April 2002
Mott MacDonald Ltd., Abu Dhabi, UAE

في ADWRA
  • مارس 2000 إلى أبريل 2002

March 2000 - April 2002
Mott MacDonald, Abu Dhabi, UAE
Position: A.R.E.
Client:ADWRA
Fully participating in the following:-
• Installation of 600mm Dia. Ductile Iron Pipeline with all fittings from Al Shuwaib Pumping Station to Hilli Reception in Al Ain, Al Shabak Project, Contract No. A 99-0024. The budget was 36716160 Dhs. (ADWEA)
• Concrete work for chambers, thrust blocks and pipeline anchors.
• Road crossing by open cut.
• NDRC (Pipe jacking and auger boring)
• Chamber water tightness test and tanking.
• Hydraulic pressure test (Initial and final)
• Flushing and disinfection
• Connection to the existing lines
• Material approval as per Contract Specifications.

Major Responsibilities
• Assisting the Resident Engineer.
• Inspection and approval of materials received on site as per Contract Specifications
• Inspection and approval of executed works.

Elshahama Eng. Consultant في Mott MacDonald Ltd
  • الإمارات العربية المتحدة
  • سبتمبر 1996 إلى يناير 2000

Sept 1996 - Jan 2000
Elshahama Eng. Consultant, Abu Dhabi, UAE.

Resident Engineer في Shahama Consultants
  • الإمارات العربية المتحدة
  • سبتمبر 1996 إلى يناير 2000

Sept 1996 - Jan 2000, Resident Engineer - Shahama Consultants, Abu Dhabi, UAE.

POSITION: R.E.
• Supervision of construction of 32 nos. of low cost house2 at Al Rahba City, Shahama, Abu Dhabi - Contract No. 9.

• Initial approval of materials submitted by the contractor and recommendation for Public
Works Department ( PWD) final approval.
• Inspection and approval of materials received on site as per Contract Specifications.

Elmanara Eng. Consultant
  • الإمارات العربية المتحدة
  • أبريل 1996 إلى سبتمبر 1996

April 1996 - Sept 1996
Elmanara Eng. Consultant, Abu Dhabi, UAE.

SITE ENGINEER في Al Manara Consultants
  • الإمارات العربية المتحدة
  • أبريل 1996 إلى سبتمبر 1996

April 1996 - Sept 1996, Al Manara Consultants, Abu Dhabi, UAE.

POSITION: SITE ENGINEER
• Supervision of construction of 3-8 story buildings in Musffah and Abu Dhabi.
• Supervision of construction of villas in Abu Dhabi and Umm Al Nar.
• Initial approval of material submitted by contractor.
• Inspection and approval of materials received on site as per Contract Specifications
• Inspection and approval of site works

National Urban Water Corporation (N.U.W.C), Sudan

Dec. 1986 - Feb. 1996

مهندس مدني في National Urban Water Corporation (NUWC)
  • السودان - الخرطوم
  • ديسمبر 1986 إلى فبراير 1996

Dec.1986-Feb.1996
National Urban Water Corporation (NUWC), SUDAN

Senior Engineer في Eldamazeen Town Water Project
  • أبريل 1995 إلى فبراير 1996

1/ April 1995 - Feb 1996, Senior Engineer - Eldamazeen Town Water Project, Sudan.

Supervision of the following Civil Works:
• Four nos.R. C gravity filters.
• One no.underground suction R. C reservoir.
• 7 Km water mains, dia. 400mm with all accessories.
• Maintenance of the town distribution network, 150mm and 100mm dia.

في Post Graduate Study in Water Supply Engineering
  • سبتمبر 1992 إلى فبراير 1995

2/ Sept 1992 - Feb 1995 - Post Graduate Study in Water Supply Engineering.

University of Hohai, Nanjing, China.
It was two and half years course. One and half years academic course and one year thesis. The title of the thesis was "A Water Supply Scheme Feasibility Study for Aojiany Town, China." The contents of the thesis includes the following chapters:-

• Introduction
• Hydrological Analysis
• Design of an Earth Dam and an Intake.
• Design of row water transmission line
• Design of water treatment plan, gravity filters and underground reservoirs.
• Design of distribution system
• Reliability analysis
• Budget analysis
• Conclusion

Resident Engineer في BERBER Town Water Treatment Plant
  • يوليو 1987 إلى أغسطس 1992

3/ July 1987 - Aug 1992, Resident Engineer -
BERBER Town Water Treatment Plant, Sudan

Supervision of the following works:-
• River water intake
• One no. R. C Clari floculater
• Four nos. R. C gravity filter
• One no. underground reservoir
• 5Km (AC) transmission pipeline, 400mm dia with all accessories.
• The maintenance of the water distribution system and water wells.
• Administrative offices and houses.

Assistant Planning Engineer في Design Office
  • ديسمبر 1986 إلى يوليو 1987

4/ Dec 1986 - July 1987, Assistant Planning Engineer, Design Office

Responsibilities are:-
• Preparation of specifications
• Preparation of tender documents and bill of quantities.
• Evaluation and selection of tenderers

Assistant Project Engineer في Ayoub
  • مايو 1984 إلى ديسمبر 1986

May1984-Dec1986, Assistant Project Engineer -
Ayoub and Omar Salim Consultant Engineer, Sudan.

Responsibilities:-
♦ Preparation of contract documents for several building projects.
♦ Supervision of the following projects:- • Khartoum Hilton Hotel Extension, Steel Structure, And Administration ( one story building)
• Khartoum International Preparatory School. ( 3 story building)
• National Electricity Corporation Training Centre ( two story buildings)
• Residential Buildings ( 1-2 story buildings)
.

في Ayoob and Omar Salim, Consultants Engineers, SUDAN
  • مايو 1984 إلى نوفمبر 1986

May 1984 - Nov 1986
Ayoob and Omar Salim, Consultants Engineers, SUDAN.
PROFESSIONAL RECORDS

الخلفية التعليمية

ماجستير, Water Supply Engineering
  • في جامعة نانجينغ/الصين
  • يناير 1994

- Master Degree in Water Supply Engineering (1994) From University of Hohai, Nanjing, CHINA.

بكالوريوس, Civil Engineering
  • في University of Science and Technology
  • يونيو 1984

- BSc (Honours) Civil Engineering from University of Science and Technology, Kumasi, GHANA, West Africa (1984) MSc in Water Supply Eng from University of Hohai-china 1994

Specialties & Skills

Water Distribution
Pipeline Building
CONTROL VALVES
ENGINEER
INSPECTION
MAINTENANCE
PIPELINE
PROGRESS
WATER DISTRIBUTION
WATER SUPPLY

اللغات

العربية
متمرّس
الانجليزية
متمرّس