Electrical Engineer
تهامة للمعادن والمقاولات
مجموع سنوات الخبرة :4 years, 6 أشهر
- Make schedule for the Electrician
- Give The Location to Electricians
- Programmable logic controller
- Use M-1ProVPC for ( Ferror )
- Make NCR .
- Some experience of SWG room, GIS room, ATS and UPS.
- Filing System for SWG Section ( A, B, C )
- GIS, LCC, Protection Panels, SAS, Remote Ends, Battery and Charger .
- Upgrade Watt For 5G
- Access System
- Fire Alarm System
- CCTV System
- Electrical supervisor at substation period two years S/S 8270 - Al-Yarmouk Site.
- The ability to read the drawing..
- Use Microsoft Ofkce ( Excel - Word - PowerPoint )
- Some experience of SWG room, GIS room, ATS and UPS.
- Filing System for SWG Section ( A, B, C )
- GIS, LCC, Protection Panels, SAS, Remote Ends, Battery and Charger .
- Make Request For Inspection ( RFI )
- Follow Method of Statement for The Work .
- Some Experience of sleeves, Earthling