senior electrical engineer
System technique
مجموع سنوات الخبرة :12 years, 1 أشهر
system technique-water treatment | Egypt
• Carrying out all electrical works installation activities for waste
water treatment plants.
• Preparing technical submittals, compliance statements.
• Preparing method statements.
• Preparation of single line diagram with respect to the specification
• Preparation of the load schedule
• Cable sizing calculation & Cable schedule
• Selection of instrumentations for the hazardous area
• Prepares necessary documents for the completion of work such
as As-Built drawings,
Supervised electrician work on round-the-clock manufacturing unit.
Provided all required electrical system technical support.
Coordinated with production department on factory progress.
Identified and resolved causes of equipment malfunction.
Ensured adherence to all facility safety precautions and
procedures.
Maintenance for all electromechanical systems.
repairing equipment
supervising engineering and technical staff
obtaining specialist components, fixtures or fittings
ensuring compliance with health and safety legislation
creating maintenance procedures
managing stocks of supplies and equipment.
Studied Subjects: Control and electrical studies. Skills 1. Circuit Design 2. Instrumentation and Electrical Measurements 3-motors. 4-classic control. 5-automatic control. 6-power electronics .