Quality Control Engineer à AAW Consulting Engineers
  • Arabie Saoudite - Najran
  • Je travaille ici depuis mai 2023

•Following up technical submittals and reports which related to materials.
• Following up as-build drawing with site engineer and consultant engineer.
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Following up of casting concrete as per project specs and ACI requirements.
• Following Up of all Quality Control Inspector.
• Deal with the Sub-contract and consultant Q.C. Engineers.
• Deal with Laboratory Reports.
• Develop, Maintain, Monitor and continually improve a Quality management system
aligned with ISO 9001:2015 Standards.
• Build effective communication channels that voice all interested parties’ needs and
expectations.
• Continuously provide engineering services that meet and exceed Customer, Regulatory
and International requirements.
• Provide the full support and resources needed for the effective implementation of the
Quality Management system.
• Set, Maintain and Monitor Quality objectives as part of its QMS to ensure that the
quality management system can achieve its intended result(s), enhance desirable effects
and enhance customer satisfaction

Quality Control Manager à F S S: FIELD SUPPORT FOR OIL AND GAS SERVICE (MULTI WORKS CO. LTD.)
  • Arabie Saoudite - Dammam
  • décembre 2022 à mai 2023

• Following up technical submittals and reports which related to materials.
• Following up as-build drawing with site engineer and consultant engineer.
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Following up of casting concrete as per project specs and ACI requirements.
• Following Up of all Quality Control Inspector.
• Deal with the Sub-contract and consultant Q.C. Engineers.
• Deal with Laboratory Reports.
• Develop, Maintain, Monitor and continually improve a Quality management system aligned with ISO 9001:2015 Standards.
• Build effective communication channels that voice all interested parties’ needs and expectations.
• Continuously provide engineering services that meet and exceed Customer, Regulatory and International requirements.
• Provide the full support and resources needed for the effective implementation of the Quality Management system.
• Set, Maintain and Monitor Quality objectives as part of its QMS to ensure that the quality management system can achieve its intended result(s), enhance desirable effects and enhance customer satisfaction.

Quality Control manager à LEEDS ECO, Nestle
  • Arabie Saoudite - Khobar
  • janvier 2020 à mai 2022

• Following up technical submittals and reports which related to materials.
• Prepare method statement, ITP and checklists.
• Control and distribute documents.
• Maintain logs for submittals.
• Conduct inspections and submitting IR.
• Monitor tests with third party laboratory.
• Report non-conformance.
• Ensure work is done as per latest revision of approved (MS, ITP, SD).
• Material inspections (material submittal, MIRs, supplier approvals)
• Calibration of measuring instruments.
• Following up as-build drawing with site engineer and consultant engineer.
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Following up of casting concrete as per project specs and ACI requirements.
• Following Up of all Quality Control Inspector.
• Reporting to operation manager for all quality control works.
• Deal with the consultant Q.C.
• Deal with Sub-contract Q.C.

Quality Control MANAGER à AL Shshlawi int’l Holding Co
  • Arabie Saoudite - Dammam
  • janvier 2016 à janvier 2020

• Following up technical submittals and reports which related to materials.
• Following up as-build drawing with site engineer and consultant engineer.
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Following up of casting concrete as per project specs and ACI requirements.
• Following Up of all Quality Control Inspector.
• Deal with the Sub-contract and consultant Q.C. Engineers.
• Deal with Laboratory Reports.

Quality Control Manager à SAUDI OGER LTD
  • Arabie Saoudite - Jeddah
  • février 2013 à janvier 2016

• Inspection of repair works during construction (Structure & cosmetic).
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Inspection of casting concrete as per project specs and ACI requirements.
• Following up technical submittals and reports which related to materials.
• Inspection of special finishing items Fixation; (Escalators, GFRC cladding panels, GRG panels, Curtain walls, Aluminum sub-frames, )
• Inspection of installation and erection of steel link bridge sections.
• Inspection of reinforcement after final installation as per approved drawing.
• Inspection of form work safety & stability as per design & shop drawing for two systems of form work (Doka & SGB)
• Replacement to quality control area manager when he was in vacation every year for two years.
• Quality control area manager replacement of area manager for one year.

Senior QC Engineer à Consolidated Contractors International Company & Hassan Allam Sons
  • Egypte - Le Caire
  • octobre 2012 à janvier 2013

• Inspection of reinforcement after final installation as per approved drawing.
• Inspection of form work safety & stability as per design & shop drawing for two systems of form work (Doka & SGB)
• Following all inspection of underground pipe diameter 2.5m
• Inspection Of (Infrastructure - Constriction Services Underground) after final installation as per approved drawing
• Inspection of repair works during construction (Structure & cosmetic).
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Inspection of casting concrete as per project specs and ACI requirements.
• Following up technical submittals and reports which related to materials.
• Inspection of special finishing items Fixation; (Escalators, GFRC cladding panels, GRG panels, Curtain walls, Aluminum sub-frames, …)
• Inspection of installation and erection of steel link bridge sections.

Senior QC Engineer à Consolidated Contractors International Company & Hassan Allam Sons
  • Egypte - Le Caire
  • octobre 2010 à octobre 2012

• Inspection of reinforcement after final installation as per approved drawing.
• Following all inspection of underground pipe diameter 2.5m
• Inspection Of (Infrastructure - Constriction Services Underground ) after final installation as per approved drawing.
• Inspection of form work safety & stability as per design & shop drawing for two systems of form work (Doka & SGB)
• Inspection of repair works during construction (Structure & cosmetic).
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Inspection of casting concrete as per project specs and ACI requirements.
• Following up technical submittals and reports which related to materials.
• Inspection of special finishing items Fixation; (Escalators, GFRC cladding panels, GRG panels, Curtain walls, Aluminum sub-frames, …)
• Inspection of installation and erection of steel link bridge sections.

Senior QC Engineer à Consolidated Contractors International Company & Hassan Allam Sons
  • Egypte - Damanhur
  • juin 2009 à octobre 2010

• Inspection of reinforcement after final installation as per approved drawing.
• Following all inspection of underground pipe diameter 2.5m
• Inspection Of (Infrastructure - Constriction Services Underground) after final installation as per approved drawing.
• Inspection of form work safety & stability as per design & shop drawing for two systems of form work (Doka & SGB)
• Inspection of repair works during construction (Structure & cosmetic).
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Inspection of casting concrete as per project specs and ACI requirements.
• Following up technical submittals and reports which related to materials.
• Inspection of special finishing items Fixation; (Escalators, GFRC cladding panels, GRG panels, Curtain walls, Aluminum sub-frames, …)
• Inspection of installation and erection of steel link bridge sections.

Site Engineer à ORASCOM CONSTRUCTION INDUSTRIES & BESIX JV
  • Egypte - Alexandrie
  • mars 2008 à juin 2009

• Inspection of reinforcement after final installation as per approved drawing.
• form work (Doka & SGB)
• Inspection of repair works during construction (Structure & cosmetic).
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Inspection of casting concrete as per project specs and ACI requirements.
• Following up technical submittals and reports which related to materials.
• Inspection of special finishing items Fixation; (Escalators, GFRC cladding panels, GRG panels, Curtain walls, Aluminum sub-frames, …)
• Inspection of installation and erection of steel link bridge sections.

Inspection QC Engineer à SQUARE, SAN STEFANO GRAND PLAZA.
  • Egypte - Alexandrie
  • mars 2007 à mars 2008

• Inspection of reinforcement after final installation as per approved drawing.
• Inspection of form work safety & stability as per design & shop drawing for two systems of form work (Doka & SGB)
• Inspection of repair works during construction (Structure & cosmetic).
• Inspection of all laboratory tests needed to be carried out related to conc. works
• Inspection of batch plant concrete mixing.
• Inspection of casting concrete as per project specs and ACI requirements.
• Following up technical submittals and reports which related to materials.
• Inspection of special finishing items Fixation; (Escalators, GFRC cladding panels, GRG panels, Curtain walls, Aluminum sub-frames, …)
• Inspection of installation and erection of steel link bridge sections.

Civil Project Engineer à AL KOAID ESTAPLISHMENT
  • Egypte - Alexandrie
  • avril 2006 à mars 2007

• Construction & civil work for EL SWEADY SCHOOL IN EL RIAD
• Responsible for finishing items (Raised floor, ceramic tiles, painting, etc. )
• Coordination with HVAC tasks.
• Coordination with plumbing tasks
• Coordination with Electrical tasks

Civil Site Engineer à Moray & Reports
  • Egypte - Alexandrie
  • juin 2005 à avril 2006

• Construction for building work for plumbing
• Responsible for finishing item
• Inspected & received aluminum work from ALI co.
• Construction senior Eng. for (N W 5) building

Civil Site Engineer à Misr Sons Development (Hassan Allam sons) / (HAS)
  • Egypte - Alexandrie
  • novembre 2002 à juin 2005

• Construction & Civil work for Control, maintenance & warehouse building
• Responsible for finishing items (Raised floor, ceramic tiles, Painting, …. etc.)
• Coordination with HVAC tasks
• Coordination with plumbing tasks
• Coordination with Electrical tasks

Éducation

Baccalauréat, Civil Engineering
  • à Alexandria University
  • novembre 2002

Bachelor's degree in Civil Engineering, graduation project, water supply with distinction, and several projects in roads, traffic, concrete and metal facilities

Specialties & Skills

Monitoring
Certified Internal Auditor
System Safety
Oil and Gas
Team leadership, team communication and decision making
teamwork
Project Management Professional Preparation Course.
Internal Auditor Training Course ISO 9001-2008.
a guide person
Solving problems from the roots

Langues

Anglais
Expert

Adhésions

Saudi Council of Engineers
  • professional
  • February 2013

Formation et Diplômes

Construction Safety and Health from OSHA academy. (Certificat)
Internal Auditor Training Course ISO 9001-2015. (Certificat)
P M P (Formation)
Institut de formation:
OKAZ TRAINING ITSTITUTE
Durée:
36 heures

Loisirs

  • Stability, superiority and success
    Success in any project he joined, achieving the company's goals, and obtaining customer satisfaction