ASHOK MOHANTY, Asst General Manager

ASHOK MOHANTY

Asst General Manager

M/S Shriram Epc Ltd

Location
India - Bhubaneswar
Education
Bachelor's degree, Industrial Safety
Experience
32 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :32 years, 4 Months

Asst General Manager at M/S Shriram Epc Ltd
  • My current job since December 2017
Asst General Manager at Noble Accomplishmen
  • My current job since November 2017

at visakhapatnam steel plant, Visakhapatnam, . project site, my responsibilities are
. Design, Drawing, Engineering, Procurement, supply, storage, Dismantling of Existing equipments, erection of new equipment, testing, commissioning, demonstration of performance guarantee test and handed over the project to clients. Modernization & up gradation of Sinter Machine 1 & 2 at Visakhapatnam steel plant site Visakhapatanam in the form of one -stop solution. for engineering across the continents

Dy.Chief Engineer at M/s M.N.Dastur & Company (P ) Ltd
  • January 2004 to November 2017
Dy. Chief Engineer at M/s M.N. Dastur & Company (P) Ltd
  • November 2006 to November 2006

Visakhapatnam steel plant project site my responsibilities are;
•Installation & commissioning, which is supplied by DANIEAL for Billet Caster-1 including the cantilever type Tundish car, Hydraulic system for withdrawal & straightner. Installation & commissioning of Rigid Dummy bar with automatic bar disconnection device to replace existing Flexible dummy bar, Automatic torch cutting machine instead of shear mechanism.
•Installation and commissioning of Vessel suspension with Tunion Ring for 3 Nos converter by Fabricating at VSP Site, which is supplied by SMS Demag (Germany).
•Installation and commissioning of new DM Plant for billet caster supplied by THERMAX.
•Installation & commissioning of 150 Ton LADLE FURNACE-2 supplied by SMS Demag (p) Ltd. Including steel transfer cars for handling hot metal, FAFA system through conveyor mechanism, belt /chain conveyor, Re-circulating water system for primary and secondary cooling, Gas cleaning plant, ESP, WWTP and Fin fan cooler etc for Steel melting shop.
• Erection & commissioning of Hot metal transfer cars for unloading hot metal by 260Tand 320T Torpedo in Torpedo reloading pits.
•Installation & commissioning of Hot Metal Desulphurization Plant-2 for reducing Sulphur content of steel supplied by B K.3Ton capacity Slag Ranking machine supplied by DANGO (Germany) for removal of slag’s from Hot metal.
•Installation & commission Ladle tilter, Slide gate preparation for maintains of porous plug and fixing of slide gate on steel ladles.
•Installation & commissioning of Ferro alloy and flux handling system including Vibro feeder for LD shop.
•Installation & commissioning for Augmentation of GCP including of two nos.ID Fan for converter-1, 2.& 3 .
•Installation & commissioning of Secondary Emission Control System supplied by SMS DEMAG, it include laying of ducts from various fume emission point in LD shop, Installation of 3 nos.ID Fan for suction, 2nos ESP for controlling duct in the fume to reduce pollution.
•Installation & commission of scrubber and cooling stack with lower hood & moveable skirt for LD converter.
•Successfully completion of heat size increases under 6.3 MTPA expansion project by inducting 170T Hot Metal ladles &155T Steel ladles & removing Existing lower capacity ladles from the shop. All the existing auxiliary facility like ladle driver, stands, steel Cars, slag pot handling cars, slag pots also modified to suit the Higher capacity ladles

consultant at M/s M.N. Dastur & Company (P) Ltd
  • India
  • February 2004 to November 2006

My responsibilities were;
•Organizing the Various trainees program with client & contracting agency for erection and commissioning the projects with zero incidence at site.
•Guide line for implement of OSHAS at site
•Attending and conducting the safety Review & Meeting with client consultant and contractors..
•Co-ordination with factory inspector for implications of safety at site.
•Site investigation and to analysis route cause of incident / accident.
•Hazard identification & Risks alysis ( HIRA ) of various activities like (working at height, Confined space, Gases area, Electrical area, hydraulic system water line, excavation etc

Sr. Engineer at M/s Mideast Integrated Steel Limited
  • December 1998 to January 2004

My responsibilities were
•I was looking after total construction Activities & Equipment’s erection of mechanical site.
•Organizing the safety & trainee programs at site like OHSAS, HIRA, Used of PPES & Development of safety awareness.
• Hazard identification & analysis of various construction activities

Sr.Engineer at M/s Mideast Integrated Steel Limited (MESCO)
  • December 1998 to January 2004
Engineer at M/s Steeloflex Engineers (P) Ltd
  • India
  • January 1992 to November 1998

My responsibilities were;
•Shop floor supervision, fabrication, erection, testing & commissioning of different steel plant equipment’s for Bokaro & Rourkela Steel plant which was a project of LARSEN & TOUBRO LTD Kansbahal works.
•Fabrication & Erection of 70 meters Chimney for Bokaro Steel plant.
•Erection & installation of structural work like Hopper, Bucks Tray, Ducting, etc. for Rourkela Steel Plant.
•Fabrication of hot gas cyclone, water tank pressure vessel for JVSL .

Engineer at M/s Steeloflex Engineers (P) Ltd
  • January 1992 to November 1998
Deputy Chief Engineer at M/s M N Dastur & co ( P ) ltd
  • to
Sr.Engineer at M/s Mideast Integrated Steel Limited (MESCO)
  • India
  • to
Engineer at M/s Steelof lex (P ) ltd
  • India
  • to

Proven ability to swiftly ramp up projects with competent cross-functional skills & special delivery mechanism.
•Proven skills in handling projects from concept to commissioning & handing over stage, with rich experience in the related commercial and administrative aspects.
•A keen communicator with excellent leadership, analytical, man management and organizational skills.
• Objective •
Seeking senior managerial assignments in Technical and commercial Project Execution, with an organization of repute; preferably in the Steel and allied industry.
• Core Competency •
•Handling project activities involving working out various requirements with respect to Engineering, Procurement, utilities, machines, manpower & monitoring overall project operations for ensuring timely completion.
•Ensuring that the site operations are carried out smoothly with erection, commissioning, procurement operations & handing over the projects.
•Providing technical inputs and developing master specifications with needs assessment.,
•Handling erection & commissioning of numerous sub-units of plants & equipment’s to ensure the completion of projects within stipulated time/ cost parameters, considering the projects with zero incidences.
•Carrying out inspection tests for determining the effectiveness of the equipment’s / plants.
•Conducting quantity surveying of large technological construction projects and preparing technical specification, design drawing, documents etc.
•Monitoring and coordinating the work progress with sub contractors & clients.
• Planning of activities as per Bar Chart

Asst General Manager at M/s Shriram EPC Ltd & posted
  • to

26 years of experience in Contract Management, Erection, Testing, Commissioning & handing over the project to client in the Steel industry

Education

Bachelor's degree, Industrial Safety
  • at State council of Technical Education & Vocational TrainingGBI non destructive Testing Institute
  • January 1998

courses: Project Management Tool: MS office & Auto cad, • Certified• •Ultra Sonic Level-II

High school or equivalent, Mechanical Engineering
  • at of Engineers
  • January 1991

in

Specialties & Skills

CUSTOMER RELATIONS
MECHANICAL
MICROSOFT WORKS
ORGANIZATIONAL SKILLS
SUPERVISORY SKILLS
ASSETS RECOVERY
CONSULTING
GRAPHIC DESIGN
PROCUREMENT

Languages

English
Expert
Hindi
Expert