Bakhyt Baibatshayev, Project Manager

Bakhyt Baibatshayev

Project Manager

Phanes Group

البلد
الإمارات العربية المتحدة - دبي
التعليم
الثانوية العامة أو ما يعادلها, Economics and Company Management
الخبرات
20 years, 8 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :20 years, 8 أشهر

Project Manager في Phanes Group
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ مارس 2019

Project Development Manager - Solar PV projects
Main responsibilities:
Solar PV projects assessment and development in Ukraine, Uzbekistan, Kazakhstan, Georgia, Azerbaijan, Kyrgyzstan, Greece, Mongolia and Eastern Europe (Poland, North Macedonia, Montenegro) countries;
Study and analysis of solar PV markets and renewable and solar supporting legislation in CIS, Central Asia and other countries;
Study of the national energy systems and analysis of the procedures for connecting to the national and local electric grids;
Obtaining all permissions and licenses for projects, including obtaining technical conditions for the grid connection and signing grid connection agreements,
Building (construction) permits, easements for interconnection lines, permits to cross other engineering communications networks and roads by HV lines and etc.;
Desktop PV sites assessment, site visits;
Land lease agreements.
Passing the state examination of detailed design and obtaining Building permit for Projects;
Selection of international consultants and contractors for various technical studies (grid evacuation studies, geo, topo, hydro studies), SoW, ToR, RfP, RfQ.
Contracting and supervising of design (solar PV plants, interconnection lines, grid evacuation and impact studies) and technical studies works;
SoW, RfP, RfQ for EPC, OE and PMC contractors and bidders. Tendering process. Participation in preparation and drafting of contracts for EPC-contractor, suppliers and consultants;
Solar PV project in Ukraine has been brought to Ready-to-Build stage;
Solar GIS modelling and Financial modelling;
Interaction with government authorities and stakeholders for the project implementation;
PPA signing with Off-takers;
Payments to contractors for work performed, verification of invoices;
Project development budget and control of expenses;

Project Manager في Access Power (United Arab Emirates)
  • الإمارات العربية المتحدة - دبي
  • يونيو 2017 إلى مارس 2019

Project Development Manager - 50 MW Wind Project

50 MW Wind Farm Project development and implementation near the Almaty (Kazakhstan).
The project has been brought to Ready-To-Build stage.
Obtaining all permits and licences for the project, working with state and local authorities and stakeholders.
Supervise of the development of detailed design and price estimate documentation by design institutes.
Working with general EPC-bidders and turbine and BOS equipment suppliers and construction sub-contractors, with logistic companies.
Preparation and development the following contracts:
- state expertise of the wind farm detailed design and turbine foundations;
- technical and author supervision; Owner’s Engineer;
Supervise of the contractor's work on detailed project design, geotechnical investigation and topographical study.
Work coordination of the technical experts on wind measurement assessments and wind turbine micrositing.
Land issues for the wind farm and obtaining easements (RoW) for 110 kV power transmission line, state and private lands acquisition.
Cooperation with Financial Development Institutes and Lenders (ADB),
Cooperation with state authorities (Ministry of Energy, Construction authority, Land authority and etc.) to receive all permits.
Providing full project documentation for legal and technical DD for Lenders.
Full assistance and supervising of developing Environmental and Social Impact Assessment (ESIA) for Lenders and Environmental authority.
Preparation and submission of documents to the State Construction Authority for examination of feasibility study and detailed project design - Successfully passing state examination and obtaining Construction permit.
Obtaining the Building permit for Project construction and installation works from Construction Authority.
Working with KEGOC (Technical System Operator/TSO) for connection to the National electric grid and obtaining approval for design documentation from TSO.
Signing Grid connection agreement with TSO.
RfP, RfQ for EPC-bidders

Consultant في Kazakhstan Sustainable Energy Finance Facility (KAZSEFF)
  • أغسطس 2008 إلى أغسطس 2010

Participation in realization of KAZSEFF project -developed by European Bank of Reconstruction and Development (EBRD); implemented by MVV decon (Germany) and GFA Consulting Group (Germany):
•Identification and preparation of energy efficiency and renewable energy sources investment projects;
•Preparation of energy audit reports with possible energy efficiency measures recommendations.
•Preparation of Project Assessment Report (Feasibility Study) - technical contribution to feasibility studies, for further PAR submission to the banks for projects financing.
•Preparation and promotion of investment projects, especially cost assessment;
•Participation in development of legal base for energy market development;
•Contract management for construction (commercial part) of energy sector investments;
•Carrying out of negotiations with management of companies, workshops and trainings for bank officers and companies.
•CO2 emission reduction calculation for projects

Director في KazKuat» JSC (hydropower stations management and construction)
  • ديسمبر 2007 إلى أغسطس 2008

of Project Development and Monitoring Department
Description: •Promotion of investment projects (Bulak, Moinak, Kambarata Hydroelectric Power Stations);
•Projects approval in the state authorized bodies (19 state bodies);
•Development of Project Schedules;
•Participation in Technical and Economic Substantiation in financial and economical section (financial models - IRR, NPV, payback period, tariffs calculations);
•Approval of Technical and Economic Substantiation;
•Analysis of proposals provided by Investors and Financial Institutes for projects financing;
•Preparation of documents to execute the projects dealing with state authorities
•Preparation of the project status reports for shareholders and state authorities;
•Preparation of proposals under the contracts;
•Monitoring and reporting on the subsidiary company’s activity.

Director في Milestone
  • الإمارات العربية المتحدة
  • مايو 2005 إلى ديسمبر 2007

Finalization of contracts for construction of Oil Refining Plant for AGIP KCO (North Caspian Consortium, Kashagan field);
•Compilation, planning and control of project budget realization;
•Control of mutual payments with subcontractors and Client (AGIP KCO);
•Preparation of cost estimation on Project Management;
•Close-out of Financial

Advisor
  • كازاخستان
  • ديسمبر 2004 إلى مايو 2005

Issues related to creation of billing center for data collection;
•Processing and invoicing for public utilities (consumption of heat energy and hot water) on the basis of the unique payment document.

في Independent Consultan
  • فبراير 2013 إلى يناير 2005

- Development of Net metering rules - selling electricity (surpluses) to the grid that generated by renewable energy sources of private net consumers;
- Development of the State subsidies Rules for rural consumers in remote areas that don't have connection to the grid for the purchase of renewable energy equipment;
- Preparation of Report to the Ministry of Industry and New Technologies of the Republic of Kazakhstan “The development of state support measures for renewable energy sources as an alternative independent source of power supply in Kazakhstan”.

Head Manager في Power Industry Development of the
  • يناير 2011 إلى يناير 2005

under the Ministry of Industry and New Technologies of Kazakhstan

Chief
  • مارس 2001 إلى ديسمبر 2004

Electricity Grid Operating Company” JSC

Specialist في Ministry of Energy
  • الإمارات العربية المتحدة
  • أكتوبر 1999 إلى مارس 2001

Astana, Kazakhstan
Company:

Junior Researcher في Ministry of Industry
  • سوريا
  • أغسطس 1998 إلى أغسطس 1999

Institute for Economic Research of the

Electrician في Almaty electricity grids
  • فبراير 1994 إلى أكتوبر 1995

- Department of the relay protection and ECA of HV-line.

Director في Adnry Kazakhstan LLP and Adnry Advisory
  • إلى

Adnry Kazakhstan and International Business Developer in Adnry Advisory
Description: • Representing international corporations CENER, INABENSA / ABENGOA (investor), ACCIONA, EREDA, CHEMTROL and etc. in Kazakhstan;
• Searching, identification and evaluation of projects in the field of renewable energy sources (small hydroelectric, wind and solar power) and in the field of construction of high voltage transmission lines and substations for the purpose of participation above-mentioned companies in projects as an EPC-contractor or investor;
• Organization of meetings and negotiations of these companies with local developers of projects, clients;
• Record keeping and monitoring of projects.
• Other functions in accordance with the Charter (contracts, payments, finance, etc.)

General Director
  • إلى

Astana, Kazakhstan
Company: Renewable energy support settlement and financial centre (RES SFC

Independent Consultant في AF-MERCADOS Energy Market International S.A
  • إلى

Resource Efficiency Technology Transformation Program
(Project Pipeline Preparation for European Bank Reconstruction and Development (EBRD) and GEF).
- Preparation a list of energy efficiency projects for further financing by the EBRD and the GEF (searching, identification, verification for compliance with the criteria of the EBRD and GEF, analysis and evaluation). Enterprises site visits.

Independent Consultant في Abt Associates Inc
  • الهند
  • إلى
Project في Asian Development Bank
  • بنجلاديش
  • إلى

Economics of Climate Change in Central and West Asia».
•Investment report (The investment climate in Kazakhstan and barriers for mitigation projects (reducing CO2 emissions).
• Data acquisition for the LEAP model - the Long range Energy Alternatives Planning System, is a widely-used software tool for energy policy analysis and climate change mitigation assessment developed at the Stockholm Environment Institute.

في Independent Consultan
  • أسبانيا
  • إلى

- Participation in the development of “The Development of Roadmap of renewable energy in Kazakhstan to 2030 (Master Plan) "Scenarios of development of renewable sources in Kazakhstan" for Samruk-Kazyna Capital.

Independent Consultant في AF-MERCADOS Energy Market International S.A. (AF-MERCADOS)
  • السويد
  • إلى
Consultant في AF-Mercados EMI
  • إلى

- Akmola Electricity Distribution Network Modernization and Expansion Project for financing by the Asian Development Bank:
- Participate in the technical visits/ Akmola Electricity Distribution Company audit mission as per the agenda. Assist the International team during the meetings by facilitating communication between Akmola Electricity Distribution Company and international team
- Facilitate activities with Akmola Electricity Distribution Company and Central-Asian Electric Power Corporation until the end of the project. This is including but not limited to work jointly with Akmola Electricity Distribution in collecting the details comments on the reports submitted by this Consultant

Independent Consultant في AF-MERCADOS Energy Market International S.A. (AF-MERCADOS)
  • السويد
  • إلى
Consultant في AF-Mercados EMI
  • إلى

European Bank of Reconstruction and Development (EBRD) Project - Kazakhstan Renewable Energy Development Framework and Regulatory Support.
Date of completion - March, 2013
- Facilitating activities with MINT and KEGOG until the end of the project. Working jointly with MINT;
- Finalizing the Renewable Energy Project Developer’s Handbook;
- Developing the Rules of green levy determining;
- Developing the Rules of electricity purchase from renewable energy generators.

Head Manager في RES
  • الإمارات العربية المتحدة
  • إلى

- Participation in the development of a new Law to support renewable energy sources (feed-in tariffs implementation for a renewables, issues of creation clearing and settlement agency for

الخلفية التعليمية

الثانوية العامة أو ما يعادلها, Economics and Company Management
  • في State Management Academy
  • يناير 2006
ماجستير, Economics and Company Management
  • في State Management Academy
  • يناير 2006

courses: (s) or Diploma(s) obtained: Diploma: “Electrical Engineer on electric drive and automation of machines”

Specialties & Skills

CONSULTING
CONTRACT MANAGEMENT
DOCUMENTATION
ENGINEERING
FEASIBILITY STUDIES
FINANCIAL
GOVERNMENT
MARKET DEVELOPMENT
PROPOSAL WRITING

اللغات

الانجليزية
متمرّس
الروسية
متمرّس