Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Ferdinand Bautista, Lead Designer

Ferdinand Bautista

Lead Designer·WorleyParsons Engineering Consultancies Co

Philippines

Diploma, Electrical Engineering

Work experience

Total years of experience: 24 years, 9 months

Lead Designer

January 2016 - January 2018

WorleyParsons Engineering Consultancies Co

Khobar, Saudi Arabia

January 2016 - January 2018

•Responsible for the preparation of Instrumentation and Control detailed design drawings for the replacement of existing absolete 103 ARCOM RTU inside the existing RTU Cabinet to be replaced with new Emersons RTU.

•Developed the entire new RTU internal interconnection wiring diagram with power & communication wiring diagram based from Emersons vendor drawings information, Standardized the complete RTU wiring drawings and all symbols in Microstation V8i for Aramco standard design compliance.

•Conduct field verification in each platform to check the existing RTU internal wiring connection arrangement, to check the new instruments installed by other scope and to check the condition of existing homerun cables entry to RTU and available spare slot for the new cable installation.
Prepare site survey report and attached the sketch/mark up drawings.

•Generate new I/O list schedule in each platforms by sequence base on the new card slot installation. Incorporate other I/O signals which is already installed on site done by other contractors. Incorporate PDHMS and MPFM installation to be installed by other contractor for serial link port reservation.

•Demolished and Modified all affected drawings such as, Instrument Block Diagram, Instrument Points & Lines for the new Charge Regulator location, Analog/Digital Junction Boxes, Analog/Digital Marshalling Box for cable ferruling, Instrument Installation Schedule and Nameplate Schedule for new PDHMS and new instrument signals from new Charge Regulator to be installed. Modified all Instrument Loops diagram and generate additional Instrument Loop Diagrams.

•Supervised instrument design group and checked all the preliminary drawings before we issue the detailed design packages for discipline check and then squad check after incorporating all the comments from discipline check. I make sure that new drawing numbers, additional instrument loop numbers and TAG numbers are all requested from Document Control for Aramco Standard Compliance.

•Attend weekly Project and Progress Meeting with Saudi Aramco Project Management Team (SAMPT) and Saudi Aramco Proponent.

•Responsible for the preparation of complete Instrument detailed design package to be Issued for construction after incorporating all the comments from squad check packages.

•Prepared a hard copy of Issued for Construction of each packages and stamp with Master copy together with the discipline check and squad check packages in one binder for Instrument Group references and information.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Sr. Instrument Designer

May 2005 - January 2016

Petrocon Arabia LTD CO./WorleyParsons LTD. Co

Eastern Province, Saudi Arabia

May 2005 - January 2016

Projects Involved:

Marjan & Zuluf Offshore Field - Hook-up and PDM Scope with PDHMS and MPFM

Safaniya Offshore Field - Hook-up and PDM Scope with PDHMS

Safaniya Offshore Field - Installation of MPFM's for 106 Wellhead Platforms

ZULUF GOSP-1 & 2 - Installation of Scrapper Receivers

ZULUF TP 7 & 8 - Installation of Scrapper Launcher, Receivers and New Deck Platform

MARJAN TP 4, 5, 6 & 8 - Installation of Scrapper Receivers

Duties & Responsibilities:

•Responsible for the preparation of Electrical/Instrumentation deliverables to be developed which includes as minimum; mark up P&ID's and assign Instrument tag numbers requested from Document Control, Cable Block Diagram, Instrument Points & Lines, Analog/Digital Junction Boxes Interconnection/Wiring Diagrams, Analog/Digital Marshalling Boxes Wiring Diagrams, RTU Panel layout, Instrument Hook-up and Mounting details, Instrument Installation Schedule, Instrument Nameplate Schedule, Instrument I/O Schedule, Instrument Logic Diagram & Instrument Cause and Effect Matrix, Instrument Loop Diagrams (ILD), Instrument Tubing Layout and Details, ESD Master Panel Layout.

•In charge of field verification and checked the location of new Instrument Devices, Checked Existing Junction Boxes and Marshalling Boxes spare terminals and cable entry available. Checked the possible location for the new Junction Boxes and Marshalling Boxes.

•Checked inside the existing Remote Terminal Unit (RTU) for spare terminals for Analog/Digital signals, available spare I/O points, available spare slot for new Analog/Digital Input/Output Card. Checked the existing ESD Master Panel for the available spare Hydraulic Tubing connection. Available spare module or slave panel for the new wellhead hydraulic shutdown system installation. Checked the existing tubing tray available spare for new hydraulic tubing. study and sketched some possible routing and support for new hydraulic tubing to be installed.

•Involved in the Project Estimate, Study the Design Basis Scoping Paper (DBSP) and Identified all the necessary deliverables for the Project and send to Sr. Design Supervisor & Lead Principal Instrument Engineer for their input and evaluation.

•Prepared all Material Take-off List done in TOCES software by Aramco Standard Format and extracted on the detailed design drawings.

•Responsible for the preparation of complete Instrument detailed design package with Drawing Control Index of all deliverables and issue for discipline check, then squad check after incorporating all comments from discipline check.

•Prepared all request for new Instrument TAG numbers, new drawing numbers, additional ILD's drawing numbers and existing drawings latest revision numbers to Document Control with Aramco Standard form request.

•Responsible for the preparation of complete Instrument detailed design packages to be issued for 90% design review after incorporating all the comments from squad check and rev-up for 90% Design Review.

•Checking and Review all Instrumentation Drawings/Data sheets and other documents prior to Clients Issuance.

•Responsible for the preparation of complete Instrument detailed design packages to be issued for construction after incorporating all the comments from 90% Design Review.

•Prepared a hard copy of Issued for Construction stamp with Master copy together with the discipline check package, squad check package and issued for 90% design review package in one binder for Instrument Group references and information.

Company industry:
General Engineering Consultancy
Job role:
Electrical Engineering

Electrical/Instrument Designer

July 2004 - April 2005

Petrocon Arabia LTD CO

Saudi Arabia

July 2004 - April 2005

Projects Involved:

Saudi Mobile Refinery (SAMREF) - Turn Around 2006 Refinery Upgrading Project

Duties & Responsibilities:

•Assigned as Electrical/Instrument Design Supervisor seconded to Foster Wheeler Company. Responsible for the execution and development of Engineering detailed design packages involving various aspect of Instrumentation and Control System associated with electrical works.

•Investigate and calibrate existing instrument devices whether it is functioning well or not and make some report, answered all query of Foster Wheeler in writing, make some report in detail.

•Responsibility includes Installation Inspection of Cable trench and Duct banks, Cable trays support, conduit routing, Field instruments/Junction boxes/Marshalling cabinet and wiring termination job. Made comments and reject if necessary.

•As-built and field verification of Piping & Instrument Diagram (P&ID's), Heat tracing cable line, Existing Junction Boxes and Marshalling Cabinet wiring diagram, spare terminals and spare bottom/top entry cables, UPS panel schedules and gather some information for all existing and new Installations.

•Prepared drawing detailed sketches or mark up on the existing drawing to be sent to Foster Wheeler. Possible location of new Instrument Junction boxes, possible routing layout of Instrument/Electrical cable tray, Instrument location plan layout.

Company industry:
Oil & Gas
Job role:
Electrical Engineering

Instrument Design Checker

August 1999 - March 2003

Lummus Alireza LTD. Co

Eastern Province, Saudi Arabia

August 1999 - March 2003

Projects Involved:

Abu Safah Platform - 3D Piping and Equipment Modeling using PDMS

Abu Safah Platform - Upgrading of 6 Well Platform

Marjan Platforms - 10 Well Tie-in Upgrade Project

Saudi Aramco - Khuff Gas Condensate Fractionation Project

IBN Zahar, Inc. Petrochemical Plant - Common Facilities Upgrade Project

Duties & Responsibilities:

•Involved in Plant Design Management System (PDMS) Group. Responsible for the development of instrument modeling design drawings such as; Instrument tubing routing layout and support for hydraulic ESD system. Instrument Mounting Stand. Extraction of all 2D Instrument Design Deliverables from completed 3D model designed.

•Responsible for the preparation of Instrumentation deliverables to be developed such as; Instrument Cable Block Diagram, Instrument Points & Lines, Analog/Digital Junction Boxes Interconnection/Wiring Diagrams, Analog/Digital Marshalling Boxes Wiring Diagrams, RTU wiring connection diagram, Instrument Hook-up and Mounting details, Instrument Installation Schedule, Instrument Nameplate Schedule, Instrument I/O Schedule, Instrument Logic Diagram & Instrument Cause and Effect Matrix, Instrument Loop Diagrams (ILD), Instrument Tubing Layout and Details.

•Conduct offshore and onshore field site survey for verification of the possible location of new Instrument junction boxes, Check spare terminals inside the RTU, spare I//O points, spare communication port, enough room for new installation. check existing junction boxes spare terminal, check marshalling boxes spare terminals, enough room for new installation, check existing Instrument cable tray and possible routing layout for new installation, check the existing tubing tray for new installation, Check ESD master panel for spare module and spare hydraulic tubing connection.

•Prepared Material take-off list and responsible for coordination with the other discipline Lead and Engineers regarding updates, modification and other information on the project.

•Prepared all request for new Instrument TAG numbers, new drawing numbers, additional ILD's drawing numbers and existing drawings latest revision numbers to Document Control with Aramco Standard form request.

•Responsible for the preparation of complete Instrument detailed design package to be issued for discipline check, then squad check after incorporating all comments from discipline check. then after incorporating all comment from squad check, we will rev-up the revision to be issued for 60% design review, then 90% design review, then Issued for Construction after incorporating all comments.

•Attend weekly Project and Progress Meeting with the Project Engineer and all Discipline Lead. Responsible of updating the Drawing Control Project Progress on the system for Project current

Company industry:
Oil & Gas
Job role:
Engineering

Electrical CADD Designer

May 1995 - October 1998

Abdullah Said Bugshan & Bros./Lucent Technologies International

Riyadh, Saudi Arabia

May 1995 - October 1998

Projects Involved:

Saudi Telephone - Telephone Expansion Project TEP-6 Project

Company industry:
Telecommunications
Job role:
Electrical Engineering

Electrical/Instrument Designer

March 1994 - April 1995

Arabian Consulting and Engineering Center (ACEC)

Eastern Province, Saudi Arabia

March 1994 - April 1995

Projects Involved:

Saudi Aramco - Rastanura Refinery Upgrade Package II Project

Duties & Responsibilities:

•Assigned by PI-Consult Company to ACEC Electrical/Instrumentation Group. Responsible for the preparation of Instrumentation and Control Engineering detailed design drawings such as; Cable Block Diagram, Wiring Diagrams, MOV Schematic, Instrument Location Plans, Cause and Effect Matrix, Instrument Loops Diagrams (ILD's), Equipment Layout, Junction Box sizing, Cable and Conduit Layout, Instrument Installation Details and Instrument Piping Details.

•Generate Instrument Installation Schedule (IIS), Cable and Conduit Schedule (CCS), Nameplate Schedule and I/O List and I/O allocation for ESD and PLC.

•Conduct site survey for verification of the possible location of new Instrument junction boxes, possible routing of Instrument Cable Layout, check marshalling boxes spare terminals and enough room for new installation,

•Prepared Material take-off list and responsible for coordination with the other discipline Lead and Engineers regarding updates, modification and other information on the project.

•Prepared all request for new Instrument TAG numbers, new drawing numbers, additional ILD's drawing numbers and existing drawings latest revision numbers from Aramco IPlant.

Company industry:
Oil & Gas
Job role:
Electrical Engineering

Electrical/Instrument Designer

June 1992 - February 1994

Petro-Infrastructure Engineering Consultants Co. (PI-Consult)

Eastern Province, Saudi Arabia

June 1992 - February 1994

Company industry:
Oil & Gas
Job role:
Electrical Engineering

Design Drafter

March 1991 - March 1992

Saudi Consulting and Design Office (Scado)

United Arab Emirates

March 1991 - March 1992

Projects Involved:

Saudi Aramco - Northern Area, Offshore Maintain Potential Project

Duties & Responsibilities:

•Responsible for the preparation of Electrical/Instrumentation and Control Engineering detailed design drawings such as; Cable Block Diagram, Wiring Diagrams, Instrument Location Plans, Instrument Loops Diagrams (ILD's), Instruments Cable and Conduit Layout, RTU Wiring Diagram Instrument Installation Details and Instrument Piping Details.

•Conduct site survey for verification of the existing field junction boxes, check available spare terminal and spare cables entry, possible routing of Instrument Cable Layout, check marshalling boxes spare terminals and enough room for new installation,

•Prepared Material take-off list and gathered information from Lead Design Engineers.

•Prepared all request for new Instrument TAG numbers, new drawing numbers, additional ILD's drawing numbers and existing drawings latest revision numbers to Document Controller.

Company industry:
General Engineering Consultancy
Job role:
Engineering

-

Creating Equipment Models with PDS 3D - INTERGRAPH, Al

Saudi Arabia

-

Microstation V8 User Update Training - Bently Institute

Principal

-

Worleyparsons Engineering Consultancies Co

-

Company industry:
General Engineering Consultancy
Job role:
Management

Instrument Engineer

-

Geoffrey

-

Company industry:
Architecture
Job role:
Engineering

-

Intergraph Microstation - ARABSCAN, Al

Saudi Arabia

-

Designer

-

Perez

United Arab Emirates

-

Company industry:
Other Healthcare Services
Job role:
Design, Creative, and Arts

Plant Design Management System

-

PDMS) - ABB Lummus Allireza LTD Co., Al

Saudi Arabia

-

Job role:
Engineering

-

Autocad 2000 - Belleli Saudi Heavy Ind. Ltd

Saudi Arabia

-

-

Scanning and

Saudi Arabia

-

/PC - ARABSCAN,

Company industry:
Medical Hospital

Project

-

Saudi Aramco - Abqaiq General Engineering Services (GES)

-

Saudi Aramco - As-built of Abqaiq Power Plant Project

Duties & Responsibilities:

•Involved in the design group (In House) of Saudi Aramco Northern Area Project Division. Responsible for the preparation of Electrical/Instrument and Control Detailed design drawings such as; Block Diagram, Instrument Points & Lines, Instrument Installation Schedule, Instrument Wiring Diagrams, Instrument Piping Details, Instrument Mounting Details, Instrument Nameplate Schedule, Instrument I/O List, DCS/ESD Wiring Interconnection Diagram and Instrument Loop Diagrams.

•Conduct site survey for verification of the existing field junction boxes, check available spare terminals and spare cables entry, possible routing of Instrument Cable Layout, check marshalling boxes spare terminals and enough room for new installation,

•Prepared Material take-off list and gathered information from Lead Design Engineers.

•Prepared all request for new Instrument TAG numbers, new drawing numbers, additional ILD's drawing numbers and existing drawings latest revision numbers to be requested from Aramco Document Controller.

•Involved in the As-Built group team, Responsible for the site verification As-Built of all Piping & Instruments Diagrams (P&ID's) for Abqaiq Power Plant. marked up the existing P&ID's drawings with Aramco standard color coding, sketch if there's some modification on the drawings.

•Responsible for updating all P&ID's electronics files into final As-Built design drawings.

Job role:
Engineering

Lead Electrical Engineer

-

Assigned by PI-Consult Company seconded to ASB/Lucent Technology International

-

Responsible for the preparation of detailed design drawings such as Electrical and HVAC drawings.

•Involved in CADD design group section, digitizing all drawings using Intergraph Microstation software.

•Responsible for coordination with

Job role:
Electrical Engineering

Design Supervisor

-

Richard Babjak

-

Job role:
Design, Creative, and Arts

Education

Western Philippines Colleges

April 1986

April 1986

Diploma, Electrical Engineering

Philippines

Colleges

Skills

BINDER
Expert
BINDER
Expert
CABLEADO
Expert
CABLEADO
Expert
DISEñO DE LA DISPOSICIóN
Expert
DISEñO DE LA DISPOSICIóN
Expert
GRAPHIC DESIGN
Expert
GRAPHIC DESIGN
Expert
MARK
Expert
MARK
Expert
MICROSTATION
Expert
MICROSTATION
Expert
PROGRESS
Expert
PROGRESS
Expert
ROUTERS
Expert
ROUTERS
Expert
UPGRADES
Expert
UPGRADES
Expert
WIRING
Expert
WIRING
Expert