Kim Wonil,   Design development department / 3D Designer

Kim Wonil

Design development department / 3D Designer

DSP DOHA

Lieu
Corée (Sud)
Éducation
Baccalauréat, Industrial Design
Expérience
9 years, 8 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :9 years, 8 Mois

Design development department / 3D Designer à DSP DOHA
  • Qatar - Doha
  • août 2017 à mai 2018

◎ QATAR METRO INTERIOR METALWORKS.
ㆍExtracting design drawings to prepare detail shop drawings for Metal works, & Glass works.
ㆍTechnical advice by analyzing IFC drawings.
ㆍPreparing interior layout and details drawings for fabrication works.
ㆍPreparing for 3D Arts Structures.
ㆍPreparing all types of Technical Drawings.
ㆍDocument management for material calculation and schedule.

Design development department / Manager à DSP KOREA
  • Corée (Sud)
  • novembre 2011 à février 2017

◎ QATAR AL THURRYA TOWER ENTERANCE PATTERN WALL. (2016 to 2017)
ㆍExtracting design drawings to prepare detail shop drawings for Metal works.
ㆍTechnical advice by analyzing IFC drawings.
ㆍAnalyze the quantity and weight of each part of the module.
ㆍPreparing exterior layout and details drawings for fabrication works.
ㆍDocument management for material calculation and schedule.


◎ QATAR LEXUS SHOWROOM EXTERIOR METAL WORKS. (2017)

ㆍExtracting design drawings to prepare detail shop drawings for Metal works.
ㆍPreparing interior layout and details drawings for fabrication works.
ㆍPreparing all types of Technical Drawings.
ㆍControl management Manufacturing processes.
ㆍDocument management for material calculation and schedule.

◎ QATAR AL MANA SUARE EXTERIOR LED LIGHT. (2015 to 2016)
ㆍExtracting design drawings to prepare detail shop drawings for LED works.
ㆍLED lighting module mold design proposal.
ㆍCreate a fabrication drawing for each part of the module.
ㆍAnalyze the quantity and weight of each part of the module.
ㆍTechnical consultation with manufacturer contact for mold design.
ㆍManufacturing process control for each part of module.
ㆍDetermine the quantity of LED modules to be placed and determine where it will be points.
ㆍExplain to the LED install professional about installed modules.

◎ KOREA SULWHASOO FLAG SHOP EXTERIOR & INTERIOR METAL WORKS. (2015 to 2016)
ㆍSuggested module design for assembly and disassembly
ㆍDetailed and Extensive Review of architectural design Drawing to obtain Variation
ㆍOrder based on engineer instruction and request for information process.
ㆍAnalyze shop drawing and propose detailed details.
ㆍMake fabrication drawing for each module.
ㆍConnection process to structure and calculation of weight.

◎ KOREA POHANG UNIVERSITY OF SCIENCE & TECHNOLOGY INTERIOR 3D WALL & CEILING (2015)
ㆍAnalysis of drawings and design proposal for installation in 3D dimensional shape.
ㆍCommunication with manufacturers to easily process 3D designs.
ㆍOrder based on engineer instruction and request for information process.
ㆍAnalyze shop drawing and propose detailed details.
ㆍMake fabrication drawing for 3D design metalworks.
ㆍControl management Manufacturing processes.
ㆍConnection process to structure and calculation of weight.

◎ QATAR HAMAD MEDICAL CITY INTERIOR METAL & GLASS WORKS. (2014 to 2016)
ㆍExtracting design drawings to prepare detail shop drawings for Metal works, & Glass works.
ㆍTechnical advice by analyzing IFC drawings.
ㆍPreparing interior layout and details drawings for fabrication works.
ㆍPreparing all types of Technical Drawings.

◎ QATAR NEW DOHA INTERNATIONAL AIRPORT DUTY FREE METAL WORKS. (2012 to 2013)
ㆍExtracting design drawings to prepare detail shop drawings for Metal works.
ㆍTechnical advice by analyzing IFC drawings.
ㆍPreparing interior layout and details drawings for fabrication works.
ㆍPreparing for 3D Arts Structures.
ㆍPreparing all types of Technical Drawings.
ㆍDocument management for material calculation and schedule.

◎ QATAR KING TERMINAL SPIRAL STAIRWAY METAL WORKS. (2012)

ㆍExtracting design drawings to prepare detail shop drawings for metal works.
ㆍStructural analysis of 3D shape.
ㆍPreparing details drawings for fabrication works.
ㆍAnalyze the quantity and weight of each part of the module.
ㆍManufacturing process control for each part of module.

◎ QATAR HIGH RISE EXHIBITION EXTERIOR METAL WORKS. (2011 to Jun 2015)
ㆍExtracting design drawings to prepare detail shop drawings for metal works.
ㆍTechnical advice by analyzing IFC drawings.
ㆍPreparing exterior layout and details drawings for fabrication works.
ㆍAnalyze the quantity and weight of each part of the module.
ㆍManufacturing process control for each part of module.
ㆍPreparing all types of Technical Drawings.

Design research department / Assistant Manager à HANIL Enginnering
  • Corée (Sud)
  • mai 2010 à décembre 2011

◎ KOREA SEONGNAM-SI PUBLIC INSTITUTIONS DESIGN CREATION. (2010 to 2011)
ㆍManage procurement items managed by the government.
ㆍPreparing all types of Technical Drawings.
ㆍControl management Manufacturing processes.
ㆍDocument management for material calculation and schedule.

Design team / Assistant Manager à KMT
  • Corée (Sud)
  • mai 2008 à mai 2010

◎ KOREA LG ELECTRONICS.LNC DISPLAY BOOTH. (2008 to 2010)
ㆍCreate efficient designs by proposing bids and design proposals.
ㆍModularization study for easy installation in the field.
ㆍAnalyze shop drawing and propose details.
ㆍPreparing all types of Technical Drawings.
ㆍControl management Manufacturing processes.
ㆍDocument management for material calculation and schedule.
ㆍIdentify product mass-production design and inventory status.

◎ KOREA LG ELECTRONICS.LNC DUCT SYSTEM SHOP INTERIOR. (2008 to 2010)
ㆍExtracting design drawings to prepare detail shop drawings for Metal works, & Glass works.
ㆍTechnical advice by analyzing IFC drawings.
ㆍPreparing interior layout and details drawings for fabrication works.
ㆍIdentify product mass-production design and inventory status.

◎ KOREA INCHEON SONG-DO CITY PLANNING AGENCY INTERIOR METAL & GLASS WORKS. (2009)

ㆍExtracting design drawings to prepare detail shop drawings for Metal works, & Glass works.
ㆍTechnical advice by analyzing IFC drawings.
ㆍPreparing interior layout and details drawings for fabrication works.
ㆍPreparing for 3D Arts Structures.
ㆍPreparing all types of Technical Drawings.
ㆍDocument management for material calculation and schedule.

Éducation

Baccalauréat, Industrial Design
  • à National Institute of Lifelong Education
  • février 2008
Baccalauréat, Industrial Design (Product Design part)
  • à Shin Ansan University
  • février 2007

★ Scholarship for 1 times for academic excellence ★ ntest exhibit Gold Premier

Specialties & Skills

Profils Sociaux

Site Web Personnel
Site Web Personnel

Le lien a été supprimé pour non-respect des conditions d'utilisation. Veuillez contacter l’équipe d'assistance pour plus d'informations.

Langues

Coréen
Langue Maternelle
Anglais
Débutant

Loisirs

  • Road Cycle
    Have 2012 Giant Road cycle model. Enjoy cycling up the mountain.