MAHTAB ALAM, Project and Maintenance Manager

MAHTAB ALAM

Project and Maintenance Manager

SAGAR OVERSEAS LTD LAGOS WEST AFRICA

Location
Nigeria
Education
Diploma, Electrical Engineer
Experience
8 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :8 years, 6 Months

Project and Maintenance Manager at SAGAR OVERSEAS LTD LAGOS WEST AFRICA
  • Nigeria
  • My current job since May 2018
Junior Project and Maintenance Engineer at LUPIN LTD TARAPUR MIDC THROUGH PERFECT POWERTECH PVT LTD
  • February 2012 to July 2014

Type of Industry : Pharma, API.

Nature of job:
•lighting maintenance Transformer maintenance, PCC, MCC, PDB, LDB, Starter, Maintenance, Cable fault find & jointing, P.M. Job of motor, Capacitor Bank installing & Maintenance for PF improve.
•Project: Modifications & Electrifications of MPP-4 project, Cable laying, termination, Cable tray erection, Mcc panel installation, Lighting jobs, Equipment installation & commissioning, Earthing jobs, Battery installation street light .

Engineer at IMPULSE PHARMA PVT.LTD, WHO GMP GHANA AND NAFDAC APPROVED COMPANY
  • July 2014 to

Type of Industry : Pharma, Tablet & Capsule Manufacturing.
Reporting to : Plant Head & Director.
Nature of job:
•Working a projects cum Maintenance Leader (Electrical, Mechanical, Civil & Instruments.)
•Looking after preventive, Breakdown Maintenance of all Utilities like Substation, Boiler, Thermic Fluid Heater, ETP, HVAC, Air compressor, Cooling Tower, Purified water plant, & also FBD, Blender, Shifter Multimill, Rmg, Coating pan, Pate kettle, Tablet compression machine51 Station D- tuning tableting machine, 61station BB - tuning table ting, Karnavati Engineering tableting m/cs & Cadmach Engineering tableting m/c, Blister pack machine, Capsule filling machine AF 90-T, AF 150-T, AF200-T etc. Through GMP)
•Co-ordinate erection & commissioning of utilities.
•Lisioring with government authorized like MSEDCL, Electrical inspector.
•Updating and Maintaining of who documents & attend audit for who.
•Spare parts planning & spare inventory Control.
•Analytical approach to solve preventive & Break down Maintenance.
• AMC Planning & execution control.
•Manpower Handling & co-ordination with other Departments

Electrical Engineer
  • to

Day to day Project Planning, Monitoring Cost control Review, attending daily & weekly review meeting with management, Requirement for quality management, controlling time cost with safety, follows up Materials in flow.
Project management:
•Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output.
•Supervising a team of supervisors of various types of job and evaluating project progress

Erections and commissioning:
•Installing and commissioning of various equipment’s.
•Ensuring effective site managements and discipline to ensure safe execution of the projects.
Project Experience :
•Installation, Testing & commissioning of Transformer, L.T. Panel, D.G., motor Installation, Termination, Testing & commissioning of PCC, MCC, MLDB, LDB, PDB & VFD Panel. Installation, Testing & commissioning.
•Cable testing & Laying in Tray, Trenches & Underground.
•Installation, Testing & commissioning of all type of industrial lightings.
•Installation of Earthing pit & Earthing at equipment.
•Installation of reactor, Centrifuge, FBD, RMG, Multimill, Blender, Shifter, Tablet & Granules Packing &sealing machine.
• Installation of Boile, AHU, Compressor, Ejector, Cooling Tower, DM Plant, Pump, ETP and Chilling Plant.
Handled following Documentation of maintenance Independently as per ISO, WHO requirement:
•Preparing & updating Preventive maintenance schedules for each equipment’s & system .
•Maintaining breakdown History Cards for machine & Equipment’s .
• Maintaining daily records for purified water Plants, daily Consumption reports of Utilities .
•Maintaining daily records of Official Works Permits for the equipment’s .
•Preparation & implementation of SOP’s to the various system & equipment’s.
•Maintaining log Books for systems (Air compressor, Purified water plant, HVAC System. DG, MSEB Reading, Water reading.
•8. Issue the work permits & checking of bills & various works done by contractors

  • to

OTHER ACHIEVMENT/AWARD

•Undergone implant training for 30 days at “BARAUNI THERMAL POWER PLANT “in Begusarai, Bihar.
•Participate in various safety trainings.
•Participate in various Audit Programs (Internal & External)
AUDIT WORK:
•WHO & Consultant Audit.
•GMP audit.
•GHANA Audit.
•NAFDAC Audit.
•USFDA Audit.

Education

Diploma, Electrical Engineer
  • at Abbnoor polytechnic college faridkot punjab
  • February 2012
Bachelor's degree, Electrical Engineer
  • at Abbnoor polytechnic college, Punjab technical University
  • January 2012
High school or equivalent,
  • at JantaE.B. Board
  • January 2008

Bachelor's degree,
  • at JantaE.B. Board
  • January 2008

Specialties & Skills

Project Engineering
Pharmaceuticals
Engineering
Maintenance
Utility Computing
APPROACH
CABLING
FILE MANAGEMENT
LIGHTING
MECHANICAL
REPORTS
UTILITIES