Mohamed  Drawesh, Position    Operation Geophysicist

Mohamed Drawesh

Position Operation Geophysicist

Location
Egypt - Cairo
Education
Diploma, success
Experience
5 years, 8 Months

Share My Profile

Block User


Work Experience

Total years of experience :5 years, 8 Months

Position Operation Geophysicist
  • April 2016 to February 2017

Company North Sinai Petroleum Company - PGS Marin
Location Cairo Egypt
Tasks and Responsibilities: prepared detailed 3D Broad Band Seismic acquisition program, depend on targets and structure depth, old acquisition problems, old seismic legacy problems” multiples, discontinuity. Follow up all required communication with contractor, prepared acquisition parameter “Source Operating Pressure, streamer type, streamer length, streamers separation, group interval, streamer tow depth”, Reviewing Pre-Plot report & acquisition operation Q.C plan.




Project 13: June 2016 - Aug 2017
Position Operation Geophysicist
Company North Sinai Petroleum Company
Location Cairo, Egypt
Tasks and Responsibilities :Propose new two Side Track wells for drilling, Prepare well drilling programs, Review different well trajectories in seismic before and during drilling, Follow up well path trajectory during drilling, Correct the velocity problem from the seismic interpretation during drilling to overcome missing the targets “ take the necessary action if needed to change well trajectory during drilling before reaching reservoir level “, Handle necessary communications with contracted service companies, Follow up any work over activity.




Project 14: Feb 2017 - Till now
Position Q.C Seismic Data Processing
Company North Sinai Petroleum Company - PGS Tensor- Western Geco
Location Cairo, Egypt
Tasks and Responsibilities: prepared all seismic data (SEG-Y, horizons, faults, wells) required for seismic reprocessing, follow up P-UP production cube, data transmittal between different contractors, attend all meeting for Q.C, follow up all reprocessing sequences with great concern for the Pre-Messinian section & De-Multiple model . Follow up NMO Velocity Production.

Project 15: Jul 2017 - Till now
Position Seismic Interpreter (unconventional Tight Gas Prospect Generation)
Company North Sinai Petroleum Company
Location Cairo, Egypt
Tasks and Responsibilities: carried out detailed interpretation for all unconventional Tight Gas Reservoir & maturate this prospect using logs ”Sonic Gas Flag, Acoustic caliper, Mud log gas reading” Seismic Inversion EEI & AVO to increase chance of success, 2 prospects Have been identified.


Volunteering Experience__________________________________________________

• Seismic Interpretation and attribute application course for the new graduate in syndicate of scientific professions 2012.
• Seismic Interpretation and attribute application course for fresh graduate in faculty of scince Ain Shams University 2013.


Experience______________________________________________________________
Geophysicist

•ASCOM (ASEC Company for Mining - ASCOM )
Working as geophysicist acquiring electric & magnetic survey in upper Egypt in underground water project

Position Seismic Interpreter
  • February 2015 to July 2015

inversion Q.C)
Company North Sinai Petroleum Company - Earthworks Company
Location Cairo Egypt / Salisbury U.K
Tasks and Responsibilities: prepared all seismic data ( SEG-Y, horizons, faults, wells ) required for the study, follow-up Well Log Conditioning, VSP analysis and tie to well, Sonic Calibration, Wavelet extraction, Rock Physics analysis, Fluid Substitution, AVO modeling, Seismic Inversion and GIIP calculation .



Project 11: Sep 2015 - Mar2016
Position Seismic Interpreter,
Company North Sinai Petroleum Company -Tri-Ocean Company
Location Cairo Egypt
Tasks and Responsibilities: carried out detailed interpretation (horizons, fault, grid, amplitude map and depth conversion) for 2015 Seismic Inversion Data, reevaluation for all prospects in the area depend on the Porosity and Saturation seismic cubes “EEI+15& EEI-70”, GIIP recalculation for all prospects.

Position Seismic Interpreter
  • December 2012 to July 2013

Company North Sinai Petroleum Company
Location Cairo, Egypt
Tasks and Responsibilities: carried out Regional Study with detailed interpretation for 2010 processed data Pre-Stack Time PSTM with Deconvolution After Stack (DAS), different seismic attribute modules used to increase the confidence of all DHI (bright spots) some of them were already drilled as bright spots with proven gas discoveries
Recommend for new 3D Seismic acquisition with Broad band Technology to overcome multiple problems and to increase data quality and subsalt image.




Project 9: Mar 2014 - July 2014
Position Q.C Seismic Data Processing
Company North Sinai Petroleum Company - CGG
Location Cairo, Egypt
Tasks and Responsibilities: Evaluate Seismic data Problems for Seismic reprocessing, Prepare technical scope of work for seismic processing Projects Technical evaluation for seismic processing tenders, follow up all reprocessing sequences with great concern for the Pre-Messinian section & De-Multiple model . Follow up NMO Velocity Production, Production of several offset volumes; True relative amplitudes were preserved throughout the processing sequence to allow for future AVO (AVO friendly) Data to be delivered in company specified coordinate reference.

  • January 2011 to September 2011

Position Q.C Seismic Data Processing
Company North Sinai Petroleum Company - PGS Tensor
Location Cairo, Egypt
Tasks and Responsibilities: follow up all reprocessing sequences for high data quality with great concern for the Pre-Messinian section. Follow up NMO Velocity Production, Follow up Production of several offset volumes; True relative amplitudes were preserved throughout the processing sequence to allow for future AVO (AVO friendly) Data to be delivered in company specified coordinate reference.




Project 7: Oct 2011 - Aug 2012
Position Operation Geophysicist
Company North Sinai Petroleum Company
Location Cairo, Egypt
Tasks and Responsibilities :Propose new two wells for drilling, Prepare well drilling programs, Review different well trajectories in seismic before and during drilling, Follow up well path trajectory during drilling, Correct the velocity problem from the seismic interpretation during drilling to overcome missing the targets “ take the necessary action if needed to change well trajectory during drilling before reaching reservoir level “, Handle necessary communications with contracted service companies, Follow up any work over activity.

Position Seismic Interpreter at Red Sea Subsalt Image
  • January 2011 to May 2011

Company Consultance Company
Location Cairo, Egypt
Tasks and Responsibilities: Run seismic interpretation for the North Red Sea area which characterized by very complex structures of faulting and salt domes. This interpretation is used to be integrated with other Gravity, Magnetic, and Geological data to build/understand the subsurface Geological structural model of the area.

Position Seismic Interpreter
  • May 2010 to November 2010

Company North Sinai Petroleum Company
Location Cairo, Egypt
Tasks and Responsibilities: carried out detailed interpretation for 2010 processed data Pre-Stack Time PSTM with Deconvolution After Stack (DAS), and Angle stacks volumes, different seismic attribute modules used to increase the confidence of all DHI (bright spots) some of them were already drilled as bright spots with proven gas discoveries 20 prospects have been identified . GIIP calculation for identified prospects

Position Seismic Interpreter
  • June 2008 to January 2009

Company North Sinai Petroleum Company
Location Cairo, Egypt
Tasks and Responsibilities: carried out detailed interpretation over Company areas using the available 2006 reprocessed 3D seismic datasets including the Pre-Stack Time Migrated (PSTM), PSTM with Deconvolution After Stack (DAS), and Angle stacks volumes, different seismic attribute modules used to increase the confidence of all DHI (bright spots) some of them were already drilled as bright spots with proven gas discoveries . More than 50 Prospects and lead Have been identified.
Publication Papers in MOC 2010 Alexandria, Egypt
NOSPCO Hydrocarbon Plays in ONS (Hatem F. Ewida & M. Salem 2010)
Hydrocarbon Plays and Prospectivity from Possible Seismic
Hydrocarbon Indicators in Offshore North Sinai



Project 3: Dec 2009 - May 2010
Position Q.C Seismic processing
Company North Sinai Petroleum Company- PGS Tensor
Location Cairo, Egypt
Tasks and Responsibilities: Evaluate Seismic data Problems for Seismic reprocessing, Prepare technical scope of work for seismic processing Projects Technical evaluation for seismic processing tenders, Follow up NMO Velocity Production, Production of several offset volumes., True relative amplitudes were preserved throughout the processing sequence to allow for future AVO Study.

Project 1
  • October 2007 to April 2008

Company North Sinai Petroleum Company
Location Cairo, Egypt
Tasks and Responsibilities: Review different well trajectories in seismic before and during drilling for 4 wells, Follow up well path trajectory during drilling Correct the velocity problem from the seismic interpretation during drilling to overcome missing targets “take the necessary action if needed to change well trajectory during drilling before reaching reservoir level “Handle necessary communications with contracted service companies, select perforation intervals

seismic interpreter at Khalda Petroleum Company
  • Egypt
  • January 2007 to September 2007

, well site for one month & Q.C for Check Shoot or VSP loggin.

  • June 2004 to August 2004

Company ASCOM (ASEC Company for Mining - ASCOM )
Location Upper Egypt
Tasks and Responsibilities:
Working as geophysicist acquiring electric & magnetic survey in Upper Egypt in underground water project

Education

Diploma, success
  • at Ain Shams University
  • October 2017

Master Prerequisite Course

Specialties & Skills

Teaching
Training New Employees
Oil and Gas
Seismic Interpretation
DATA PROCESSING
INTERPRETATION
QUALITY
SCIENTIFIC

Languages

English
Expert
Arabic
Native Speaker

Memberships

AAPG
  • geology
  • January 2008

Training and Certifications

Office Basic Safety (Training)
Training Institute:
North Sinai Petroleum Company
Date Attended:
November 2010
Duration:
32 hours
Fire-fighting and first aid (Training)
Training Institute:
NIOSH
Date Attended:
March 2017
Duration:
24 hours
Personal Survival Techniques and Search and Rescue on Board Offshore units (Training)
Training Institute:
Arab Academy for Science, Technology & Maritime Transport
Date Attended:
July 2011
Duration:
24 hours
Sequence Stratigraphy & Seismic Application (Training)
Training Institute:
OGS
Date Attended:
March 2008
Duration:
40 hours
Advanced Structural Geology (Training)
Training Institute:
OGS
Date Attended:
August 2008
Duration:
40 hours
Integration Of Well Logs And Seismic (Training)
Training Institute:
OGS
Date Attended:
November 2011
Duration:
40 hours
Seismic Attributes AVO Analysis (Training)
Training Institute:
OGS
Date Attended:
March 2013
Duration:
40 hours

Hobbies

  • religious tourism & tourism for relax