Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Mohsin Ali bukhari, Electrical & Instrumentation Engineer-Maintenance Head

Mohsin Ali bukhari

Electrical & Instrumentation Engineer-Maintenance Head·Geyad company

Saudi Arabia

Bachelor's degree, Electrical Engineering

Work experience

Total years of experience: 10 years, 9 months

Electrical & Instrumentation Engineer-Maintenance Head

August 2021 - Present

Geyad company

Dammam, Saudi Arabia

August 2021 - Present

Reviewed project plans and proposals then worked with management to develop
project objectives.
• Identified project responsibilities by determining the phases and elements of the
project.
• Coordinated entire engineering projects working closely with other engineers
• Coordinated and expedited the flow of technical documents and activities and
ensured compliance with the contract and project requirements.
• Reviewing engineering drawings and analyzing project impacts in support of the
operations department.
• Partnering closely with the Project Manager to execute various tasks, including
final assembly, installation activities, loop checking, pre-commissioning and
overseeing subcontractor work.
• Planned and arranged complete manpower resources for the entire E&I project
scope.
• Supervised and monitored daily electrical and instrumentation construction
activities.
• Ensured quality control and assurance for all E&I installation and testing work.
• Coordinate and execute loop checking activities for instrumentation systems.
• Managed factory acceptance test (FAT) and Pre-FAT activities successfully.
• Led pre-commissioning and commissioning activities for E&I systems.
• Identified, tracked, and cleared punch points for all electrical and
instrumentation work.
• Reviewed engineering drawings and technical documents for accuracy and
compliance.
• Worked closely with project manager for planning and execution of site
activities.
• Facilitated smooth flow of technical documents and material approvals.
• Conducted regular site inspections to monitor progress and quality standards.
• Maintained effective communication between clients.
• Contributing to project objectives by identifying risks and proposing solutions.
• Participated in preparation and review of as-built drawings and documentation.
• Witnessed and verified installation of cables, panels, instruments, and related
equipment.
• Monitored resources deployment, progress, and quality to meet project
schedule.
• Ensure full compliance with Saudi Aramco standards, siemens requirements, and
contract specifications.
• Provide technical support to the operations team during project phases

Improved preventive maintenance proficiency from 20% to 90% and
implemented maintenance process to achieve the lowest life cycle cost of
equipment.
• Developed and implemented a training program for all maintenance employees.
• Identified problems and quickly created solutions so production was not slowed
or hampered.
• Planned, managed, and controlled maintenance budget.
• Met daily with the team to review issues and prioritize projects.
• Managed preventive maintenance programs as well as identified long term
projects based on KPIs.
• Scheduled and completed all maintenance project work in timely and efficient
manners.
• Monitored employee work performance annually through a performance review
for assigned employees.
• Manage entire maintenance team, making sure each team member is efficient
and successfully filling maintenance roles
• Monitor machine efficiency, noting when fine tuning can be done to improve
output and increase efficiency.
• Perform routine preventive maintenance to ensure that machines continue to
run smoothly, building systems operate efficiently, or the physical condition of
buildings does not deteriorate.
• Diagnose mechanical problems and determine how to correct them.
• Record type and cost of maintenance or repair work.
• Order parts, supplies, and equipment from catalogs and suppliers, or obtain
them from storerooms.
• Responsible for corrective, preventive maintenance.
• Supervise staff responsible for the execution of maintenance.
• Verification of compliance with safety standards, discipline and punctuality.
• Development of programs for the corrective repairs.
• Responsible for production control and maintenance.
• Responsible for equipments CNC lathes, machine to make separators for
automotive batteries, forklifts, compressors

Company industry:
Industrial Production
Job role:
Manufacturing

electrical engineer

January 2016 - April 2025

Yokogawa

Turaif, Saudi Arabia

January 2016 - April 2025

Follow up the material requirements for daily work and also prepare the material
requisitions to make the job done
• Resolving the Engineering related problem from client, end to soothe the daily
activities.
• Site supervision and making daily activity scheduling.
• Erection & installation of 13.8KV substation, Diesel, gas Generator.
• Installations of 13.8kv/480vtransformer, ATS, MCC, SWGR.
• Testing & insulation test of Power and control cables. Earth testing (Earth tester).
• Testing & meager of motor and transformer winding.
• Termination of power Cable control, grounding cables & cable gladding.
• M.V, L.V, C.C & grounding cable pulling.
• Installation of streetlight (400w), Flood light (400w), Task light (70w).
• Earth resistance test of the Grounding system as per ARAMCO standards.
• Cable Testing Continuity IR Test.

Company industry:
Oil & Gas
Job role:
Oil and Gas

electrical engineer

May 2021 - July 2021

Sadara Chemicals Company

Jubail, Saudi Arabia

May 2021 - July 2021

Ensure the work performed is in accordance with the drawings and specifications
• Coordinate with the contractor teams to advise on execution of the work.
• Acting as a technical adviser for supervisors and technicians.
• Preparing project report as required.
• Overseeing the selection and requisition of materials.

Company industry:
Oil & Gas
Job role:
Engineering

project engineer

March 2020 - March 2021

Saudi aramco+Gulf automation

Dammam, Saudi Arabia

March 2020 - March 2021

• Achieving pre-commissioning, commissioning and start-up of the whole installed
system.
• Instrument and control system commissioning and start-up.
• Prepare pre-commissioning, commissioning and start-up documents.
• Carry out installation of instruments pressure gauges, Horn, Beacons, H2S and
LEL sensors, Lightings control panel, Distribution panels, Power panels, Step
down transformer, Battery charger, Temperature sensors, Battery boxes with
batteries, Hydraulic panel, Pumps in chemical injection skids and Flame detector.
• Carry out calibration, commissioning activities for all field-based instruments.
• Supervision of all Electrical and instrumentation activities.
• Installation of High-pressure Tubing (10000 PSI) activity and low-pressure Tubing
(6000 PSI).
• Involving in hydro testing activity and leak test activity with Nitrogen.
• Wiring of complete system on Gas modular skids.
• Loop checking from field to junction box and junction box to remote terminal
unit.
• Installation of complete lighting system on skid and grounding work.
• Cable tray installation, Conduits work.
• Instrument wiring of complete system from Analog/Digital panels to remote
terminal unit according to wiring diagram and cable schedule.
• Trouble shooting of chock valve (Auma), and SBV (Spectacle blind valve).
• Installation of Flow meter and level transmitter and calibration.
• Conducted regular site inspections to monitor progress, quality, and safety.
• Executed factory acceptance test (FAT) and Pre-FAT activities.
• Reviewed engineering drawings, technical documents, and project plans.
• Collaborated closely with the project manager for site planning and activity
execution.
• Provide technical support to the operations team during project phases.

Company industry:
Oil & Gas
Job role:
Oil and Gas

electrical engineer

March 2019 - December 2019

Petrokemya sabic

Jubail, Saudi Arabia

March 2019 - December 2019

• Conducts inspections in the various electrical systems.
• Supervised a team of ten electricians responsible for cable pulling, tray
installation, high level wiring of lights, small power and lighting,
• Installed new and modified electrical wiring and devices.
• Plan layout and installation of electrical wiring, equipment, or fixtures, based on
job specifications and local codes.
• Remove and repair various transformers, switchboards, connection boxes.
• Diagnosed problems check current leakages and work with varied voltages to
fulfill client’s power source demands.
• Installation of switchgear, transformers, protective equipment, wiring and other
electrical utility infrastructure.
• Inspection of testing and pre-commissioning of LV & MV Motor like, insulation
resistance test, Winding Resistance test.
• Installation of sub-station equipment 13kV, substation and all inside cable laying,
switchgear and MCC panel control cable laying and wiring termination
• Installation and termination of low voltage transform

Company industry:
Petrochemicals & Refined Petroleum Products Manufacture
Job role:
Manufacturing

electrical engineer

August 2018 - February 2019

sabic+Petrokemya+Kemya+Exxon mobile

Jubail, Saudi Arabia

August 2018 - February 2019

• Resolving the Engineering related problem from client, end to soothe the daily
activities.
• Site supervision and making daily activity scheduling.
• Erecting 20 KVA transformers, Safety switches, and HVAC system. 4-Design of
Distribution Board, Power and Main Supply board. 5-Load calculation, breaker
size according to load.
• Take responsibility with the planning and review of all submitted electrical
layouts and schematic diagrams.
• Prepares all the necessary reports and maintains documentation on all electrical
projects and undertakings.
• Supervise and monitor installation of Cable, Cable tray, Lighting, Distribution
control panel, all electrical equipment and Grounding system.
• Regular and routine surveillance on ongoing construction activities, and issue
necessary corrective action report where required improving the quality
standards.
• Perform routine inspection and Document result in accordance with Approved
procedures.
• Monitor Quality control on construction progress activities.
• Review tested documentation, witness and accept all required testing.
• To conduct inspection of all ongoing activities for electrical installation.
• To attend all electrical inspection with client/contractor representatives

Company industry:
Chemicals Manufacture
Job role:
Manufacturing

electrical site project engineer

December 2017 - April 2018

Rayan Gulf + Sabic

Jubail, Saudi Arabia

December 2017 - April 2018

• Site supervision and making daily activity scheduling.
• Coordinate with the vendor and third-party contractor to meet the material
specifications and make the material transactions as per requirement of the site
jobs.
• Erection and Installation of 27 KVA Generators. 4- Installation of ATS, 50A/3
phase.
• Installation of Control panel, lighting panel. 6-Installation of Lights in smoking
shelter.
• Grounding cable lying and Grounding cable termination.
• Installation of Grounding Rods, Grounding pits, Thermite welding, Grounding
Grid and Bonding.
• Schedule and Installation of UPS and Battery Bank system.
• Installation of various cables Distribution system consists of cable tray, conduits,
Fittings and Direct Buried system.

Company industry:
Chemicals Manufacture
Job role:
Construction and Building

Electrical and instrument Engineer

September 2016 - November 2017

JGC+ Saudi Aramco

Turaif, Saudi Arabia

September 2016 - November 2017

• Site supervision and making daily activity scheduling.
• Coordinate with the vendor and third-party contractor to meet the material
specifications and make the material transactions as per requirement of the site
jobs.
• Installation of 13.8kv/480v transformer, ATS, MCC, SWGR.
• Termination of power cable, control, grounding cables & cable gland.
• M.V, L.V, C.C & grounding cable pulling.
• Installation of control panel, Lighting panel, CCTV camera pole, safety shower,
local control switch.
• Illumination testing (LUX meter).
• Installation of cable tray, support and conduit work.
• Equipment’s grounding, installation of Electrical & instrument bus bar,
installation of grounding rod.
• Exothermic welding (CAD welding).
• Installation of flame detector, hand switch, horn & beacon.
• Cable Testing Continuity IR Test.
• Earth resistance test of the Grounding system as per ARAMCO standards.
• Troubleshooting and accessing Electrical problems.
• Loop Checking, Function Testing, Pre-Commissioning with Troubleshooting and
actively participated in commissioning and start-up activity, troubleshooting and
online calibration of various process instruments.
• Site acceptance test with client.
• System startup support

Company industry:
Oil & Gas
Job role:
Oil and Gas

electrical supervisor

September 2015 - December 2015

Olyan descon

Jubail, Saudi Arabia

September 2015 - December 2015

• Installation of ESD cabinets.
• Laying, termination of power cable, Ethernet cable. 3-Installation of PDB
cabinets, modification in PDB cabinets. 4-Installation of streetlights.
• Installation of cable tray, support and conduit work. 6-Installation of new MCB in
PDB cabinets.
• Installation of marshaling cabinets.
• Laying, termination of power & Control cables.
• Installation of consoles, HIS stations, engineering workstation, safety engineering
workstation.
• Pre-Commissioning activities.
• Power & control cable pulling.
• Powering ON, to make the cabinets live.
• Directing installation of new cabinets (power, DCS system and marshaling, SIS
system and marshaling and network cabinets.
• Installation of Yokogawa DCS&ESD system in control room building
• Installation of server cabinets
• Installation of Yokogawa consoles

Company industry:
Construction & Building
Job role:
Manufacturing

Education

COMSATS Institute Of Information Technology

August 2014

August 2014

Bachelor's degree, Electrical Engineering

Pakistan

GPA (point): 2.25 out of 4

GPA (point): 2.25 out of 4

Skills

Oil and Gas
Expert
Oil and Gas
Expert
Instrument commission FAT,Pre-FAT
Expert
Instrument commission FAT,Pre-FAT
Expert
Pre-FAT
Expert
Pre-FAT
Expert
Instrumentation
Expert
Instrumentation
Expert
Punch point closure
Expert
Punch point closure
Expert

Social profiles

Personal Website
Personal Website

URL removed due to policy violation. Please contact support for further information.

Languages

English
Expert
Urdu
Native Speaker
Arabic
Beginner

Memberships

Saudi engineering councile

Electrical Engineer

January 2025

Training and Certifications

Training
Iso 9001
Miss Kareema bedi
Nov 2025
iso 9001
kareema bedi

Hobbies

  • cricket