Senior Civil Engineer
Orascom Construction Limited
Total des années d'expérience :8 years, 1 Mois
Orascom Construction (OC ) is a leading global
engineering and construction contractor primarily focused on infrastructure, industrial and high-end commercial projects in the Middle East, Africa and United States.
Responsibility :
Supervise the progress and ongoing operations of the
site.
Completion of the project within scope, budget, and
scheduled duration.
Coordinate with the procurement department on the
need for various site resources.
Review all methods of statement for all tasks required
for the project.
Responsible for scheduling reports and updating them
weekly to show project progress.
Responsible for following up with the purchasing
department for procurement of materials and on-time
delivery to the job site.
Directly interacts with the client, meets client reporting
needs, and participates in site meetings.
List of Projects :
1. Project: The Metro Line Phase1 CP402
Engineering & Contracting Company specialist in
geotechnical Engineering and Deep Foundations ( bored piles, stone column, anchor piles, Struts, diaphragm walls, Barrettes, cfa piles, soil nailing, shotcrete, soil injection, soil improvement and shoring systems).
Responsibility:
Supervise the progress and ongoing operations of the
site.
Completion of the project within scope, budget, and
scheduled duration.
Implementation of bored piles (offshore-onshore),
diaphragm walls, and soil improvement techniques.
Coordinate with the procurement department on the
need for various site resources.
Review all methods of statement for all tasks required
for the project.
Responsible for scheduling reports and updating them
weekly to show project progress.
Responsible for following up with the purchasing
department for procurement of materials and on-time
delivery to the job site.
Directly interacts with the client, meets client reporting
needs, and participates in site meetings.
Equipment management: hydro mill Soilmec (SC-130,
SC-135), hydraulic grab (SC- 70, SC-70, SC-90) and
soilmec bored (sr-45, sr-65, sr-80).
List of Projects:
Project: Multi-Purpose Terminal in Al-Dekheila Seaport
- Berth 100.
1. Client: EDECS El Dawlia for Engineering & Contracting Company. Made more than 500 m of length for bored pile and diaphragm wall (cut off end).
Project: Development of Ain Sokhna port; Sokhna
Quay Wall Extension.
1. Client: Modern Construction & Equipment Company.
Made more than 700 m of length for Barrettes, diaphragm wall (cut off end) and bored piles .
2. Client: EDECS El Dawlia for Engineering &
Contracting Company. Made more than 850 m of
length for Barrettes .
3. Client: APEX & Contracting Company. Made more
than 450 m of length for bored pile, Barrettes and
diaphragm wall ( cut off).
4. Client: EL Fiky for Engineering & Contracting
Company. Made more than 150 m of length for and
diaphragm wall ( cut off).
Project: Water desalination plant
1. Made more 70 panel (2.8*100) with hydraulic grab
(using water stop techniques) and treatments by
injection and 110 of Anchor grout length=14 m and
free length =14 m) with (SM-14) using struts support.
Engineering & Contracting Company based on residential buildings and
Horizontal directional drilling
Reviewing design and tender drawings make shop drawings layouts.
making daily reports of executed works.
following up and monitoring contractors.
receiving executed works, and handing over consultants and Conducting the
engineering and factual inventory of the activities.
carried out on the nature and performing the operational position of the
project.
Ensuring all works were completed on time and within budget.
Managing, Execution of all HDD works including( site visit, Design profiles
for crossing, review the design and finishing the approval with the client.
supervising site preparations.
follow up the crossing process including pilot bore, reaming stages and
pipeline pulling.
make AS-BUILT for crossing.
List of projects:
1)Project: Performed four buildings in damietta consists of 7 floors the floor
contains 2 unit.
2) Project: Performed three villas in Ras Elbar City.
3) Project: Three Rc building consists 5 floors in new Damietta.
4) Project: 107 Horizontal Directional Drilling crossing HDD steering Engineer
Engineering & Contracting Company based on construction and finishes stages
works for commercial and residential buildings
Reviewing design and tender drawings
make shop drawings layouts.
making daily reports of executed works.
receiving executed works, and handing over consultants and Conducting the
engineering and factual inventory of the activities.
carried out on the nature and performing the operational position of the
project.
Ensuring all works were completed on time and within budget.
List of Projects:
1) Project: Construction and finishes exterior and interior in almokatam
(Cairo from excavation to key) executing three villas.
2) Project: Four clothes shop finishes exterior and interior in Al fayoum with
(cladding and glass front).
3) Project: two clothes shop in banha with ( cladding and glass front ) and
interior finishes.
بكالوريوس هندسه مدنية جامعه المنصورة تقدير عام امتياز مع مرتبه الشرف مشرع التخرج مقاومه مواد تقدير امتياز