Service engineer
Sree Saradhambal Automobiles (P) Ltd
Total years of experience :0 years, 0 Months
Duration: Two years
* To fix the vehicle price & To guide and improve the overall sales,
* Worked as a true value sales team leader in Maruti Suzuki authorized service show room
Hybrid technology for two wheelers
* Fabrication of Automobile Components,
* Transmission system &Chassis engineering
* Mechanical department management and problem solving
* Design and development
LIVE PROJECTS:
* DESIGN AND DEVELOPMENT OF PARALLEL HYBRID TWO WHEELER
* Currently I am working in that hybrid two wheeler development project in my self-interest, this project
we focus on design and construction of the hybrid bike. Now day’s pollution is a main parameter it’s
affecting the environmental, day by day the vehicle population will be increase in the same time natural
fossil fuel level will decrease, That why we all are focus on HEV (hybrid electric vehicle) it reduce the
cost of travel and emission in the same time HEV meets emission norms and reduce harmful gas level
in exhaust, today India follow the emission norms strictly. In and around the world are try to reduce the
global warming because its global warming effect is dangerous to our global health.
PROJECTS:
* OPTIMIZATION OF INTERNAL COMBUSTION ENGINE FOR HYBRID TWO WHEELER in 2017
This project has mainly used to find out the economic and overall efficiency for
hybrid two wheeler
* INTERNATIONAL STUDENT CAR COMPETITION in 2016
This is an international hybrid car completion in that competition we want to
build a new hybrid car under 125 cc and also it must be efficient
* PERFOMANCE AND EMISSIONS, CHARECTRISTICS OF VARIABLE COMPRESSION RATIO
DIESEL ENGINE USING EGR FUELED WITH RUBBER SEED OIL METHYL ESTER in 2015
This is my UG final year project in this project we are producing biodiesel by using
rubber seed this is mainly reduce the exhaust emission level and improve the
petroleum product level
* BALANCING OF VIBRATION IN RECIPROCATING MACHINE IN 2010
This project has been done in my diploma level this project has mainly used to
reduce the noise and improve the balancing parameter
(
(
dear sir/madam I will complete my polytechnic degree in 2012 but I passed out in 2010 because the inbetween two years I try to pass my arrear paper
f
in