Site Engineer
Tamimi Industrial Services
Total years of experience :2 years, 11 Months
Jan Muhammad Wala, Sialmor (Sargodha) internship
The work experience about different sections of Sugar cans operation and maintenance observation.
I had observed all the mechanical work in detail because when I was used to go there, Mill was in
process of BMR (Balancing Modification and replacement). I had been also participated in boiler
studies, and observation of boiler installment.
* Industrial tour of Mangla Dam. Visit
It was very informative visit. I had observed the production of electricity. I had observed the working
of turbines and different sections of dam.
SMESTER PROJECTS:
* Project on parabolic trough to increase the water temperature in winter (20c0
to 60c0
).
* Study on manufacturing of rear wheel hub of motor bikes.
* Semester project of manufacturing process, prototype of job shop
:
.