محمد طارق, Emec          Projects Coordinator

محمد طارق

Emec Projects Coordinator

ATS

البلد
الولايات المتحدة - مينيسوتا
التعليم
بكالوريوس, Electrical Power Engineering
الخبرات
15 years, 1 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :15 years, 1 أشهر

Emec Projects Coordinator في ATS
  • الإمارات العربية المتحدة
  • يناير 2012 إلى يناير 2016

Electrical Systems:
Substations installations up to 11KV - High& Low voltage Distribution Networks- Generators/

Danway Project Manager
  • يناير 2006 إلى يناير 2012

Execution of works for Pumping Stations.
•Upgrade of Electrical Facilities at PWI Station.
•Sewerage plant and associated works.
•New Reservoirs& associated pipelines.
Scope:

•Demonstrate and use expert knowhow of the entire MEP part of construction projects in all its aspects design, function, installations and coordination with other trades
•Coordinate the MEP design and execution between design office and contractors/subcontractors
•Provide the planning input for the MEP works and Monitor Planning vs. Progress on site
•Document project progress and/or delays through letters which can be used as contractual aids during disputes
•Control the document flows
•Review resource reports like (manpower histograms, plant and machinery schedule) and ascertain adequacy of resources deployed for timely completion of the project
•Review and certify the monthly invoicing of the contractors/subcontractors
•Audit the performance of MEP subcontractors
•Implement/follow proper QA/QC procedures by maintaining and following Project QA/QC Manual
•Lead technical coordination meetings with subcontractors and project staff
•Provide technical input for offer requests and the awarding of MEP subcontracts to the contracts, procurement departments
•Awareness of International and Local Building Codes of all MEP Systems
•Have hands on experience on the procurement, installation, testing & commissioning of all MEP Systems
•Lead and Mentor a team of Mechanical and Electrical teams on Site
•Oversee and enforce the implementation of HSE by MEP Contractors
•Ensure compliance of construction activity to best industry standards, international codes, planned timelines, allotted budget, company strategy and goals.

Thermo MEP Coordinator في ADNOC Hospital
  • يناير 2004 إلى يناير 2006

Projects Executed:

•Quality Control Laboratory for Engineering Works.
•Paper Mill & Carpet Factory.
•Cooling Plant.

Sapac Sr. Electrical Engineer
  • يناير 2001 إلى يناير 2004

Projects Executed:

•Hospital Modification Works.
•College of Technology.
•MEP Installation works for a Domestic Airport.
Scope:

•Work under nominal supervision taking responsibility for definable parts of the project
•Undertake electrical systems design, predominantly for building projects, including power systems, lighting, fire alarm and other signal systems
•Calculations for lighting systems and associated controls
•Prepare and review drawings detailing the design
•Incorporate sustainable design methods in buildings
•Create/prepare reports
•Coordinate work with Clients and Engineers of other disciplines
•Attend meetings and communicate with clients to establish their needs and discuss design issues with them.

1991 - 2001 Alexandria Power Distribution Authority Maintenance Department Head
Projects Executed:

•11KV/ 415v Substations & Power Distribution Network.

Scope:
•Responsible for cost analyses, development of design criteria, routing and siting of transmission lines.
•Responsible for conductor selection studies, shielding, grounding and induction studies.
•Work with vendors and clients to specify transmission line components.
•Review transmission line models; verify right of way requirements, conductor sags, and transmission line plan and profile drawings.
•Supervise Electrical Engineering Department staff and report to the principals of the firm
•Prepare or schedule training for engineers and CAD operators
•Monitor hours spent on projects and direct efforts to maintain design budgets
•Prepare periodic project status reports
•Prepare arc flash reports and training for clients
•Prepare utility master plans
•Work with mechanical, civil, and structural leaders to determine electrical requirements/support for utility plants and distribution systems for private companies and municipalities.
•Create relay and metering single line/ three line diagrams
•Set up project schedules
•Prepare studies and recommend options
•Prepare sizing calculations for equipment and buses.
•Prepare relay calculations and specify relay model numbers.
•Perform construction administration
•Prepare operating procedures
•Train operators and maintenance personnel

الخلفية التعليمية

بكالوريوس, Electrical Power Engineering
  • في Alexandria University
  • نوفمبر 1990

Specialties & Skills

BUDGETING
CONTRACT MANAGEMENT
INVOICING
LETTERS
MACHINERY
MECHANICAL
MEETING FACILITATION
MENTORING
MICROSOFT WORKS
QUALITY CONTROL

اللغات

العربية
اللغة الأم
الانجليزية
متمرّس