Shift Engineer
Samsons Group of Companies
مجموع سنوات الخبرة :5 years, 7 أشهر
Maintenance of all utilities.
Assure the quality standards of Cigarettes.
Implement HSE standards in organization.
• Design and fabricate Disinfection Tunnel.
• Lead the team to perform the installation of Pollution Plant at Hattar Industries.
• The machining and assembly of centrifugal pumps. Motors division, Static balancing, Foundry and Structure division.
• The manufacturing and assembling of cooling tower.
• Work on efficiency enhancement of Cross Flow and Counter Flow Cooling towers.
• Analyzed the working of the Quality Control Department.
• Study of the Reverse Osmosis process and the Reverse Osmosis plants.
• Calibriration of Pfister.
• Mechanically Isolate the Vibrating Source and to Reduce Exposure.
• Maintenance and Overhauling.
Health and Safety Enviroment.
.
. Pre-Engineering:
: