•Name of assignment or project & Location: Up-gradation of Tarbela existing switchyard(500/220/24kV substation), Tarbela dam, Pakistan
Cost of Project: $. 25 Million
Date of Start: August 2016 Date of Completion: To-date
Actual Time Spent on the Project: 8 months
Employing Organization: Associated Consulting Engineers - ACE (Pvt) Ltd.
Client: WAPDA
Client Information: Mr.Sohail Khan, CE/PD, T4thHP, Old HPD Building, Project Office Tarbela, Tarbela Dam Project, Contact #: 0938-281175.
Main project features: After the completion of Tarbela 4th extension, 1410MW will be added to the system, due to which the short current rating of system will jump from 43kA to 50kA. For that purpose all the equipment in switchyard including will be upgraded to 63kA i.e
o 500kV Bus bars and its supports
o 500kV Current transformer
o 500kV Circuit breaker
o 500kV Disconnect Switches
o 3x150MVA Auto-Transformer
o Surge arrestors
o Auto transformer protection
o Circuit breakers protection
o Bus Bar protection
o SCADA system
o Sergi system
Positions held: Junior Engineer Electrical
Activities performed:
• Review for approval of 500kV circuit breaker(Outline, design calculation, technical data sheet, layout).
• Review for approval of 500kV Disconnect switch (Outline, design calculation, technical data sheet, layout).
• Review for approval of 500kV Current transformer(Outline, design calculation, technical data sheet, layout).
• Review for approval of 500kV Post Insulator(Outline, design calculation, technical data sheet, layout).
• Review for approval of Surge Arrestor(Outline, design calculation, technical data sheet, layout).
• Review for approval of 450MVA Auto-transformer(Outline, design calculation, technical data sheet, layout).
• Review for approval of 500kV and 220kV protection and metering single line diagram.
• Review for approval of 500kV breaker failure protection system.
• Review for approval of 500kV Bus Bar failure protection system.
• Review for approval of 450MVA Auto transformer protection system.
• Review for approval of 450MVA Auto transformer fire protection system.
• Review for approval of Short circuit calculation and load losses of 450MVA Auto transformer.
• Attending co-ordination meeting with contractor and client.
• Prepare daily, weekly fortnightly, monthly and per-yearly report writhing.
• Drafting of letters to the Client and Contractor.
Protection systems(500/220kV switchyard):-
• Review for approval of 500kV breaker failures protection schematic drawings of ½ Bus Bar scheme.
• Review for approval of 500kV Bus Bar protection schematic drawings of ½ Bus Bar scheme.
• Review for approval of Transformer protection schematic drawings of ½ Bus Bar scheme.
500/220kV switchyard Site Activity:-
• Supervision of dismantling of auto-transformer structure.
• Supervision of dismantling of 500kV current transformer structure.
• Supervision of dismantling of 500kV Disconnect Switch structure.
• Supervision of dismantling of 500kV post insulator structure.
• Supervision of dismantling of 500kV surge arrestor structure.
• Supervision of dismantling of 500kV Bus Bar structure.
• Supervision of dismantling of 500kV breaker Failure protection panels, relays and structure.
• Supervision of dismantling of 500kV Bus Bar Failure protection panels, relays and structure.
• Supervision of dismantling of 500kV Transformer protection panels, relays and structure.