Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Umair Khan, Upgradation of Tarbela existing switchyard(500/220/24kV substation

Umair Khan

Upgradation of Tarbela existing switchyard(500/220/24kV substation ·ACE private Ltd.

Pakistan

Bachelor's degree, Electrical Engineering

Work experience

Total years of experience: 4 years, 9 months

Upgradation of Tarbela existing switchyard(500/220/24kV substation

March 2016 - October 2018

ACE private Ltd.

Islamabad, Pakistan

March 2016 - October 2018

•Name of assignment or project & Location: Up-gradation of Tarbela existing switchyard(500/220/24kV substation), Tarbela dam, Pakistan
Cost of Project: $. 25 Million
Date of Start: August 2016 Date of Completion: To-date
Actual Time Spent on the Project: 8 months
Employing Organization: Associated Consulting Engineers - ACE (Pvt) Ltd.
Client: WAPDA
Client Information: Mr.Sohail Khan, CE/PD, T4thHP, Old HPD Building, Project Office Tarbela, Tarbela Dam Project, Contact #: 0938-281175.
Main project features: After the completion of Tarbela 4th extension, 1410MW will be added to the system, due to which the short current rating of system will jump from 43kA to 50kA. For that purpose all the equipment in switchyard including will be upgraded to 63kA i.e
o 500kV Bus bars and its supports
o 500kV Current transformer
o 500kV Circuit breaker
o 500kV Disconnect Switches
o 3x150MVA Auto-Transformer
o Surge arrestors
o Auto transformer protection
o Circuit breakers protection
o Bus Bar protection
o SCADA system
o Sergi system
Positions held: Junior Engineer Electrical
Activities performed:
• Review for approval of 500kV circuit breaker(Outline, design calculation, technical data sheet, layout).
• Review for approval of 500kV Disconnect switch (Outline, design calculation, technical data sheet, layout).
• Review for approval of 500kV Current transformer(Outline, design calculation, technical data sheet, layout).
• Review for approval of 500kV Post Insulator(Outline, design calculation, technical data sheet, layout).
• Review for approval of Surge Arrestor(Outline, design calculation, technical data sheet, layout).
• Review for approval of 450MVA Auto-transformer(Outline, design calculation, technical data sheet, layout).
• Review for approval of 500kV and 220kV protection and metering single line diagram.
• Review for approval of 500kV breaker failure protection system.
• Review for approval of 500kV Bus Bar failure protection system.
• Review for approval of 450MVA Auto transformer protection system.
• Review for approval of 450MVA Auto transformer fire protection system.
• Review for approval of Short circuit calculation and load losses of 450MVA Auto transformer.
• Attending co-ordination meeting with contractor and client.
• Prepare daily, weekly fortnightly, monthly and per-yearly report writhing.
• Drafting of letters to the Client and Contractor.
Protection systems(500/220kV switchyard):-
• Review for approval of 500kV breaker failures protection schematic drawings of ½ Bus Bar scheme.
• Review for approval of 500kV Bus Bar protection schematic drawings of ½ Bus Bar scheme.
• Review for approval of Transformer protection schematic drawings of ½ Bus Bar scheme.
500/220kV switchyard Site Activity:-
• Supervision of dismantling of auto-transformer structure.
• Supervision of dismantling of 500kV current transformer structure.
• Supervision of dismantling of 500kV Disconnect Switch structure.
• Supervision of dismantling of 500kV post insulator structure.
• Supervision of dismantling of 500kV surge arrestor structure.
• Supervision of dismantling of 500kV Bus Bar structure.
• Supervision of dismantling of 500kV breaker Failure protection panels, relays and structure.
• Supervision of dismantling of 500kV Bus Bar Failure protection panels, relays and structure.
• Supervision of dismantling of 500kV Transformer protection panels, relays and structure.

Company industry:
Electric Power Production & Transmission
Job role:
Engineering

Junior Engineer

March 2015 - August 2016

MM Pakistan Limited

Islamabad, Pakistan

March 2015 - August 2016

-Name of assignment or project & Location: Tarbela 4th Extension(1410MW) Hydro power project, Tarbela Dam.
-Cost of Project: $.910 Million
-Date of Start: March 2015 Date of -Completion: July 2016
-Actual Time Spent on the Project: 4 year
-Employing Organization: Mott MacDonald Pakistan .
Client: Wapda
Client Information: Mr.Sohail Khan, CE/PD, T4thHP, Old HPD Building, Project Office Tarbela, Tarbela Dam Project, Contact #: 0938-281175
-Main project features: Tarbela dam have 5 number of tunnels, in which 3 numbers are already used for the generation of max. 3478 MW. Now on tunnel 4th 1410MW power plant has been installing which have 3 units, and also construction of 500kV switchyard interface with existing 500/220kV switchyard.

-Position held: Junior Engineer Electrical

-Responsibilities And Achevments:
Tarbela 4th extention HPP, Power house and Switchyard(Site activities):
• Reviews of Electrical design/Quality documents.
• Daily site visit and inspection of ongoing earthing system installation.
• Electrical equipment installation inspection.
• Participate in daily Electro-Mechanical meeting.
• Inspection of Contractors 11kV construction power supply installation.
• Communicating with client and contractors.
• Provides engineering information by answering questions and requests.
• Preparing daily E&M site progress report, fortnightly E&M progress report, Weekly E&M
progress report.
• Visual inspection of Electrical equipment’s in E&M contractor ware house.
TESTS:
Following test has been conducted for 600/50 ton Powerhouse overhead crane:
• Supervision of IR test for 4kW, 11kW, 55kW and 132kW motors.
• No load test has been conducted for Main and auxiliary hoist system.
• Frequency, current and voltage test for ABB frequency drives.
• Load test has been conducted for load of 50%, 75%, 100%, 125% and 140% on main hoist
system.
• Load test has been conducted for load of 50%, 75%, 100%, 125% and 140% on auxiliary hoist
system.
• Insulation Resistance Test and Winding Resistance test have been conducted for all motors
rating i.e. (18.5kW, 3kW and 0.8KW) of 10tone Electrical hoist system of Powerhouse
overhead cranes.
Upgradation of Tarbela exsisting switchyard(500/220/24kV substation):
• Bid elevation of upgradation of existing Switchyard project
• Reviews of Electrical design/Quality documents
Tool (AUTOCAD-2013)
• Drawn the SLD of 500/220kVA Auto Transformer Metering/Protection.
• Drawn Main SLD of 500kV Substation.
• Drawn the Bus Bar and breaker failure protection of 500kV Substation.
5
Tarbela 5th
Extension HPP, Tarbela Dam:
• Specification document and drawings for construction power supply (i:)11 kV switch gear and
Cables (ii:) 500 kV transformer
• Tool (AUTOCAD-2013)
• Drawn the Main Single Line Diagram.
• Drawn the Auxiliary power System single line Diagram.
• Drawn the Main Single Line Diagram of protection and metering.
• Drawn the Power house 400V UNIT Auxiliary Board.
• Drawn the Control Building UPS Board.
• Drawn the Powerhouse 48V and 220V DC Battery Board.
• Drawn the Control building 48V DC telecom PTCL PABX battery board.
• Drawn the 48V

Company industry:
Electric Power Production & Transmission
Job role:
Engineering

Internee

February 2014 - March 2015

WAPDA TARBELA 4thExtension HydroPower

Islamabad, Pakistan

February 2014 - March 2015

Company industry:
Electric Power Production & Transmission
Job role:
Engineering

Education

COMSATS Institute Of Information TechnologyFederal Board

August 2014

August 2014

Bachelor's degree, Electrical Engineering

Pakistan

Skills

AUTOCAD
Beginner
AUTOCAD
Beginner
C
Beginner
C
Beginner
CLOSING
Expert
CLOSING
Expert
CUSTOMER RELATIONS
Expert
CUSTOMER RELATIONS
Expert
DISEÑO DE LA DISPOSICIÓN
Expert
DISEÑO DE LA DISPOSICIÓN
Expert
FEATURES
Expert
FEATURES
Expert
SCADA
Expert
SCADA
Expert
SCHEME
Expert
SCHEME
Expert
SUPERVISORY SKILLS
Expert
SUPERVISORY SKILLS
Expert
SWITCHES
Expert
SWITCHES
Expert

Languages

English
Expert

Memberships

PEG

Engineer

March 2015