Qa/qc Civil Inspector
WSP International
Total des années d'expérience :13 years, 5 Mois
The development of World's biggest park, King Salman Park
Experience in Civil Engineer/Inspector of Underpass Strom water pipe
line project, large urban underground metro infrastructure Project & Road work
experience. Underground R.C.C. Station box including deep excavation, soldier pilling,
leggings, soil anchoring, three layers of base, concourse & roof slab of underground
metro station, D-wall, plunge column, Guide wall, cut-off wall, entry exit structure,
ancillary building, valve pit/thrust pit and pump house construction, TBM Tunneling,
Micro tunneling. And also inspect rock excavation, rock bolting, rock anchoring,
grouting, shotcreting, pilling, (Sheet piles, Solder piles, King piles and Tension piles),
Deft at carrying out site inspections to make sure the work is being constructed
correctly as per the delivery norms. Adept at coordinating with clients, consultants
and Project Managers for the smooth functioning of overall operations
Riyadh Metro Project, Riyadh Advanced Metro Project Execution and
Delivery (RAMPED), Kingdom of Saudi Arabia
Scope of Work:
. Carryout regular site Inspection, Review Monitor Contract shop drawing,
Method Statement, ITP, Material & Construction Supervision of Underground
TBM Tunnel Station Structural & Architectural work, Excavation of Station,
Rebar Framework- concrete in different structural member, Blinding
Concrete, soil stabilizing method and shoring (ex-Shot Crete, Rock bolt
on site) and Report Every Activity to RE,
. To act as technical advisor to sub-contractors, operatives and crafts people with respect to
the construction site.
. Responsible for quality control of construction of substructure involving Diaphragm
Wall, soldier pile, kingpost pile, Slab, Guide wall & pile Drawing.
. Maintaining frequency of tests and document checking and inspection at site.
. Preparing Request for Inspection for each task and approval by the clients.
. Up-to-date documentation of test conducted at the site and documentation of tests conducted at
Independent laboratory.
. Inspection of incoming material as per ITP.
. Check utility (Electrical Cable, Gas pipe line, Telephone Cable, Optical fiber etc.) before Start
Grabbing.
. Prepared Measuring book for bill of Sub-contractor, work out the whole work done by sub-
Contractor.
. To check drawings, plans and other qualities to get an accurate calculation of the
whole thing.
. To ensure that all the materials used are according to the specifications.
. Preparing Third Party Inspection also checking and inspection at site.
. Supervised and conducted several road-related activities.
To check drawings, plans, and other qualities to get an accurate calculation of the whole thing.
. To manage, monitor and interpret the design of the contract documents that has been supplied
to them.
. Monitoring Quality throughout the construction process and comparing this with the projected
schedule of work.
. To manage the site on a day to day basis that includes supervising and monitoring the labor
force and that of the sub-contractors.
. Checking out reinforcement’s detail of Diaphragm wall, Guide wall and bored pile,
temporarily and permanent steel column.
. To ensure that all the materials used are according to the specifications.
. Preparation of weekly and monthly work progress report and submitting to client.
Scope of Work:
. To check drawings, plans, and other qualities to get an accurate calculation of the whole thing.
. To manage, monitor and interpret the design of the contract documents that has been supplied
to them.
. Monitoring Quality throughout the construction process and comparing this with the projected
schedule of work.
. To manage the site on a day to day basis that includes supervising and monitoring the labor
force and that of the sub-contractors.
. Checking out reinforcement’s detail of Diaphragm wall, Guide wall and bored pile,
temporarily and permanent steel column.
. To ensure that all the materials used are according to the specifications.
. Preparation of weekly and monthly work progress report and submitting to client
. (