Project Manager
SAUDI CONSULTING SERVICES COMPANY
Total years of experience :31 years, 4 Months
The project area is 3000, 000 m2consisting Of the green area
of trees and plants is 1.2 million m2
And of 7 government buildings
And 2 commercial exchanges with an area of 65 thousand
m2
And 13 administrative buildings and 14 customs clearance
And 2 umbrellas for passengers
And 2 luggage inspection umbrella
And 14 housing blocks
It includes asphalt roads with an area of 180, 000 m2
Project cost is 312 Million Saudi .Riyals
مهندس مدني مستشار
لدى شركة الخدمات الاستشارية السعودية (سعود كونسلت) للخدمات الاستشارية
Project Managerof the administrative center project at Al-
Sulay.-Riyadh
The project area is 99, 000 m2consisting of 16 governmental
buildings & large hall for celebration with 1600 m2 area.
of:
-Implementation of flood flow project in Buraydah City
-&coordination between 3 contractors.
-Tunnel length is 60, 000 m with different diameters.
- Implementationof3lakes to collect floodwaterin Buraydah.
-Restorationof tunnels& maintenance of the ceiling.
of the Buraydah orphanage project with an area
of 320, 000 m2.
The project includes 11 buildings with 55 M S.R cost.
The project is 8 floors with 60, 000 m2Area.
The project consists of:
Royal suite for the King and his friends.
ENG.RIYAD AL-BAKOUR
CONSULTANT OF CIVIL ENGINEERING
SYRIAN - 1961
OBJECTIVE
A dedicated, energetic and
hardworking person who wants to
use his high level of skills,
experience and education for
strengthening his professional
proficiency and fulfilling business
requirements.
SUMMARY
*29years of practical experience in
The construction companies and
the largest engineering consultant
Companies in Riyad al Qassimi Hail
and Damascus
*Management of teams work and
Administrative department in
Addition to workers
*Projects management and super
vision of the establishment of
various projects (hospitals hotels
Airports markets schools)
*Timing accuracy and accurate
Quantitative calculations
ENG.RIYAD AL-BAKOUR
Construction three large schools for boys in Hafer Al-
Batin&Alsuairah.
• Construction of sewage flow of WadiHafer Al-Batin
• Digging channel for drainage(open channel)
of Engineering department for 4 years.
• Constructing 65 villas.
• Building 15 Masjid and 4 large mosques.
o Supervisor of Construction AL Grameen girls college
o Constructing the labor office in Al-Madinah Al-
Monawarah.
o Restoration of Comprehensive rehabilitation
hospitalin Hail.
o Meany schools in Hail.
o Implementation of two STC centers.
o Implementation of services for Hail Emarah.
o Construction of 9 villas for citizens housing in Hail.
Construction of a high institute for teachers.
• Construction of many schools inAlmidan&Alzahra.
• Implementation of roads around schools.
• Implementation of 3 ground water tanks in Al-
Goutawith 2, 600m2 capacity.
Studying and preparing of books of technical
condition and specifications for educational buildings.
Restoration& maintenance of the building of Higher Institute
for manual labor in Damascus.
- Building a youth scout'scamp.
- Construction of 4 schools.
Establishing the infrastructure of Al-Sham City Center Mall in
New Damascus.
Finished
Implementation of a box culvert flow for rain an Damascus.
,درجة مستشار في الهيئة السعودية للمهندسين
, بكالوريوس هندسة مدنية من جامعة دمشق