Laundry Maintenance Engineer
Advanced Technology Company
Total years of experience :29 years, 4 Months
Responsibilities
• Design, planning & execution of project
• Effective Production Planning & discharging of smooth work flow.
• Planning annual Budget & stick within the budget.
• With stand on work pressure
• Solving of customer’s various complaint & laundry issues
• Instructing & training the downstream. Experience tunnel washer programming.
• Handling Girbau Continuous batch washer, various FWI like Girbau, various towel folders like Vega
• Handling utility various steam press, different model washer extractors, various type of dry-clean machinery, Marking machine
• Achievement: We processed 15 ton/day thorough out year + 1200 retails garments/day
Team size : Engineer -3, Technician-5, Helpers-10+
Reporting to: Head of Department, Kitchen & laundry dept
Responsibilities
• Effective Production Planning & discharging of smooth work flow.
• Planning annual Budget & stick within the budget.
• With stand on work pressure
• Solving of customer’s various complaint & laundry issues
• Instructing & training the downstream. Experience tunnel washer programming.
• Handling Milnor Continuous batch washer, various FWI like Jensen, various towel folders like Jensen, Vega, Delhi NCR biggest retail laundry
Responsibilities
• Effective maintenance Planning & keep all machinery in operation
• Planning annual Budget & stick within the budget.
• Planning work schedule for technician, check lists
• Make sure the Plant safety in various aspects
• Spare parts management & planning
• With stand on work pressure
• Trouble shooting & training the downstream. Experience in trouble shooting in electrical, electronics, pneumatic, hydraulics, steam & mechanical discipline, PLC, programming.
• Handling Girbau Continuous batch washer, various FWI like Jensen, Girbau, various towel folders like Jensen, Vega, K-sort transline system
• Handling utility steam press, different model washer extractors, various type of dry-clean machinery, Marking machine
• Handling utility equipment like 10 ton boilers, screw air compressors, Softer water plant.
• Diesel, water & electricity saving by effective planning
Achievement: Our plant capacity is 60 ton/day. We processed 45 ton/day thorough out year.
Team size: 11
Reporting to: Active general manger
Responsibilities
• Effective maintenance Planning & keep all machineries in operation
• Planning annual Budget & stick within the budget.
• Planning work schedule for technician, check lists
• Make sure the Plant safety in various aspects
• Spare parts management & planning
• With stand on work pressure
• Trouble shooting & training the downstream. Experience in trouble shooting in electrical, electronics, pneumatics, hydraulics, steam & mechanical discipline, PLC, programming.
• Handling Milnor Continuous batch washer, various FWI like Jensen, Girbau, American, various towel folders like Jensen, Vega, HJ weir
• Handling utility steam press, different model washer extractors, various type of dry-clean machinery, Marking machine
• Handling utility equipment like 10 ton boilers, screw air compressors, Softer water plant.
• Diesel, water & electricity saving by effective planning
Achievement: Our plant capacity is 40 ton/day. We processed 39 ton/day thorough out year.
DRF feeder, PC120 Girbau flat work ironer, Fl-King folder installed in this year - 3 numbers, VEGA towel folders
Team size: 4
Reporting to: Assistant general manger
Responsibilities
Erection of Automatic Milnor tunnel, Girbau Tunnel
Planning & execution of project
Giving technical support & maintenance after erection
Tunnel Projects done at Golden sands Laundry and Department of Health
Erection & Servicing of various make of (Make: Jensen, Girbau, Lapauv, Chicago, WJ) flat work Ironer (single roll, Two roll, Three roll), Feeder (2 station & 3 station), Folder (Multi lane).
Erection & Servicing of various washer extractor(Milnor, Girbau, speed Queen)(various capacity)
Erection of various frequency drives, soft starters
Erection & maintenance of various towel folders(Jensen, HJ WEIR), Steam presses, Shirt finishers, dryers(ADC, Cissel, Unimac etc., ), air compressors
Maintenance of Boilers (Fulton up to 13 bar),
Carry out PPM & AMC
All over UAE, ABROAD customers service & troubleshoot
Operation and maintenance of Hydraulic system, Pneumatic equipments & its accessories.
More number of laundry plant erection apart from continuous batch washers project
Experience in Mildata, Drynet
Hands on experience mechanical.
Full knowledge of UAE location.
Achievement : Erection of 4 Tunnel washers (Golden sands, DOH, Butler laundries)
Commissioned Chicago Flat work Ironer & folder in Doha, Sheraton.
2 years maintaining AMC in Khartoum, Al Salama rotana.
Team size : 4
Reporting to : Technical Director
Erection of Transformer up to 1250 KV, Alternator up to 1200 KVA
Erection, maintenance of Low Voltage Motor Control Center (MCC) (Make: Cutler Hammer), ATS Centre.
Erection of new electrical panel boards, cable laying & routing, cable trays.
Erection, maintenance of various Motors and Designing of Starters.
Tuning of Instantaneous trip relay, short circuit current relay, earth fault rely.
Providing of earth pit and maintaining its soil resistance below 3 ohm.
Operation & Maintenance of Transformer i) 1.25 MVA, 13.8KV/470 V(Make: STC, Saudi), ii)750 KVA, 13.8KV/400 V (Make: STC, Saudi)
Operation & Maintenance of High voltage circuit Breakers(Service voltage13.8 KV SF6 Breaker\{Make: Merlin Gerin\})
Erection, maintenance of ATS Centre (Auto transfer scheme)
Maintenance of Diesel Generator Upto 1.2 MVA(Make : Saudi Diesel Generator Co., )
Programming FANUE PLC
Operation and maintenance Balers which is PLC
operated Hydraulic system up to 2700 psi (Make: Baler Inc., USA)
Preparation & execution of preventive maintenance task.
Maintaining Fire Pump plant.
Experience in Apron conveyer, Belt conveyer, Eddy Current Sepearator with variable frequency drive 25Hp(Make: ERIZ, USA), Dual (230/460)voltage motor up to 75 Hp, 230v dc supply magnetic panel(Make: ERIZ, USA)
Achievement : Erection of complete electrical equipment in plant
Designing control circuit suitable for MCC
Zero hour down time in Electrical maintenance
Team size : 4
Reporting to : Electrical Engineer
Responsibilities
Maintenance scheduling, monitoring execution of Rs.20 Crore value multicolour
Printing machine maintenance.
Maintaining ISO 9002 Standard in maintenance and records
Handling the RULE 46 Annual Electrical Inspection
Handling the RULE 63 Additional & alternation of panel board Electrical Inspection
Preparation of maintenance schedule, execution & monitoring.
Maintenance of High vacuum Distillation column up to 1000 lit capacity, Extraction units up to 2 KL, Photo oxidation reactor up to 900 lit, 100 lit Pressure Hydro-generator.
Maintenance of watering vacuum pump, 20000 Lit/m lob vacuum pump, High vacuum pump up to 5000 lit/min (Make: solves, India)
Planning of efficient production Operation of CNC machines Monitoring.
Secondary standard calibration for pressure gauges, temperature, measurements.
Maintenance of Transformer up to 500 KVA (Make: Crompton Greaves, India).
Maintenance of High / Low voltage switch gears (11 KV HT OCB & 400A LT OCB \{Make: Crompton Perkinson\})
Maintenance of CNC controlled Hydraulic cutting machine (Make: Compucut, India).
Monitoring Maintenance and Overhauling of motors like
Poly Phase variable commutator type (scharge) motor upto 45 HP,
Slip Ring Induction motor up to 45 HP.
Maintenance of utility equipment: 32000 cal/lit Thermax Fluid Heater, ETP & DM Plant, UPS, Diesel Generator (up to 110 KVA\[Make; Krilosker\]).
Operation and Maintenance of 40 Ton centralized A/C Plant.
Maintenance of C-DOT V5.2, V5.13 based Digital PABX system.
Achievements : Modified panel board and conducted RULE 63 Electrical Inspection
Handling the RULE 46 Annual Electrical Inspection
Reduced machinery down time to 5% of its running time
Designation : Engineer (from Jan 1999 to Sep 2002)
Team size : 9
Reporting to : Vice-President
Erection & maintenance experience of complete plant electrical equipment like transformer up to 500 KVA, generator up to 250 KVA, Panel, Motors control circuits.
Erection, maintenance of L.T. power control center (PCC)(Make: L & T).
Erection of new electrical panel boards, cable laying & routing, cable trays.
Erection, maintenance of various Motors and Designing of Starters.
Tuning of Instantaneous trip relay, short circuit current relay, earth fault rely.
Providing of earth pit and maintaining its soil resistance below 3 ohm.
Maintain the Microprocessor based yarn dyeing control panel.
Operation & Maintenance of High / low Voltage switch gears and Breakers ( 11KV AB switch, 800A ACB\{Make : L&T\})
Maintenance of 10 Ton fire tube Thermax steam Boiler, control panel.
Erection & Maintenance of electrical panel board in DM plant and ETP, Pneumatic Equipments (Screw type compressor, reciprocating piston type compressor, Pneumatic Cylinders and it’s valve & its circuits)
Achievement : Erection of complete electrical equipment in plant
Conducted Electrical inspection in compliance with IE RULE 3 for the complete plant
Designation : Electrical supervisor (from1993 to 1994)
Team size : 4
Reporting to :Dyeing Manager
Maintenance of Transformer upto 250 KVA
Maintenance of High / Low voltage switch gears (22 KV HT AB Switch & 400A OCB (Make:L&T)
Maintenance of 180 kg/cm2 4 stage Compressor \[Made in: Japan\] and its 250 HP slip ring Induction motor.
Maintenance of Induction furnace and its frequency control panel.
Maintenance of 10 Ton EOT crane and 1 Ton Hoist
Maintenance of 360 KW resistance heater furnaces.
Maintenance of Arc welding machine and blow welding machine
Maintenance of Frequency drive up to 15 HP (Make: control technique India Ltd, India).
Maintenance of eddy current coupling variable speed control motor up to 10 Hp.
Achievement : Practiced flame proof Electrical operation.
: Zero hours break down in Electrical maintenance.
Designation : Electrical supervisor (from 1992 to 1993)
Team size : 1(myself)
Reporting to : plant Manager
Responsibilities: Fabrication/ Erection of Panel board, laying of cable wiring for Power & Lighting, Providing Earth pit, and Preparation of Electrical estimation report.
Power station maintenance, Man power planning, Costing
Diplomo in Industrial Safety
Electronics and Instrumentation
Electrical and Electronics