Sr.Engineer Maintenance (Plant and Machine)
Al Zamil Air conditioners
Total des années d'expérience :16 years, 11 Mois
- Managing and Monitoring the maintenance team
- Checking Daily breakdown and PM reports
- Maintaining of Oracle PPM
- Scheduling the Maintenance Team
- Responsible for overseeing all installation, repair and
upkeep operations of the company’s facilities.
- Review the operating results of the maintenance
function and follow-up to ensure that appropriate-
measures are taken to correct mistakes.
- Involvement in the annual budget preparation of
department and ensure all employees working within
the budget by setting targets.
- Review the maintenance schedules prepared and
ensure implementation of periodic maintenance
procedures.
- Involvement in the QA&QC department to review,
update and Implement the maintenance procedure
for ISO & OHSAS.
- To involve in the Management of inventory of
maintenance supplies, spare parts and critical items
necessary for maintenance and ensure that all items
pertaining to maintenance are available at all times
and at an adequate level.
- Plan, develop, and implement new methods and
procedures designed to improve maintenance
operations, minimize operating costs, and effect
greater utilization of labor and materials
- 11 plus years experience that reflects rich expertise
in Maintenance Engineering and Practical Work
Experience in instrumentation, automation,
maintenance and troubleshooting of PLC/CNC
Machines (PLC Programming of Mitsubishi, Siemens
& Omron)
- Identified and pioneered modification projects in the
key technology areas to enhance capabilities and
achieve cost reductions; led the design &
development of machine controls and modified old
machines with new controls to improve throughput
& efficiency
o Currently working on Project Installation of
Complete Assembly Line with Testing Facility for
Mini-split A/C Outdoor & Indoor Testing Controls
- Rendered day-to-day support for operations to maximize the reliability of production equipment; optimized the maintenance strategies (preventive and corrective) for production equipment
- Hands-on expertise in handling Sensors & Limit Switches, Hydraulics, Power Presses, Pneumatics, Motors and all types of coil bending machines, expanding machines, fin press machines, Hydraulic press machines, and Freon charging machines
- Ensured complete compliance to Sustainable & Health Safety & Environment Policy (OHSAS & ISO) & procedures and provided necessary inputs to upgrade already existing standards; attended Internal Audit Training on OHSAS 18001:2007 & ISO 14001: 2015
- Headed a team of 10 members during a business visit to China in 2015 & 2017 for inspecting machines to be purchase for production requirement
- Led a team of 20 maintenance engineers/maintenance personnel to implement automation projects in the maintenance department; achieved maintenance cost reduction
- Led a team of 10 members to solve perennial problems associated with the machines
Spearheaded a team of 20 personnel to manage the breakdown, predictive & preventative maintenance program
o Ensured periodic & preventive maintenance were appropriately scheduled & accomplished and emergency troubleshooting support was readily available
o Managed the installation & commissioning of machines for production requirements such as CNC Tube Bending Machine, Ring Loading Machine, Nitrogen Generators, & Oxygen Generators.
- Managed a gamut of operations including administering the critical electronic breakdown’s of machines and reordering of critical machine parts in the capacity of electronics engineer
- Drove Technology development; led the design and development of controls for the machines to improve throughput, and maximize efficiency
- Identified and pioneered modification projects in the key technology areas to enhance capabilities; successfully modified old machines with new controls, reducing breakdowns and improving the productivity of machines
- Won the Kaizen Award for the Best Project of The Year-2010 in Project Paint Line Powder Coating Panel and initiated cost savings worth SAR 20, 0000
- Worked in the capacity of Team Lead and imparted training to the operators hence making the machine ready for production in 1 week during the Project: Installation of Hairpin bender machine