Ragab Ata ragab, Senior Surveyor

Ragab Ata ragab

Senior Surveyor

ACE Arab Consulting Engineers "Moharram.Bakhoum"

Lieu
Egypte
Éducation
Baccalauréat, math & computer dep
Expérience
26 years, 4 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :26 years, 4 Mois

Senior Surveyor à ACE Arab Consulting Engineers "Moharram.Bakhoum"
  • Egypte - Alexandrie
  • Je travaille ici depuis septembre 2014

• INFRASTRUCTURE : Roads, IRRIGATION Network, SEWERAGE Network, STORM Network, TLECOM Network, WATER Network, LIGHTING &Medium Voltage& Low Voltage Network.
• Desalination Plant.
• Sewage Treatment Plant
• Lift Stations.
• PUMP Stations.
• Landscapes.
• Superstructure

Chief Surveyor à ARCHIRODON for Construction (Overseas) Co. S.A
  • Egypte - Port Saïd
  • février 1998 à août 2014

1-Chief Surveyor ARCHIRODON for Construction (Overseas) Co Tripoli Harbour breakwater reconstruction - Tripoli - Libya
2-Chief Surveyor ASEC for Engineering and Management
3- Quantity surveyor at Besix-Orascom JV, Egypt
El-Ain El sokhna Supercritical power plant
4- Surveyor ARCHIRODON for Construction (Overseas) Co. S.A
Damietta cycle power plant 500mw
5- Surveyor ARCHIRODON for Construction (Overseas) Co. S.A
El-Ain El sokhna Supercritical power plant (Piling works)
6-El- Nasr Building & Construction Company " EGYCO
Ibney Betak project
7- Surveyor Archirodon for Construction (Overseas) Co. S.A & Arab Contractor- JV
New container terminal and Quay wall Damietta port Egypt
8- Surveyor Industrial and Engineering Projects Company
Constructing of village at (Sahl-Eltena)
9- Surveyor El salam-Misr for trading and contracting
Livestock terminal handing facility & infra structure
10- Surveyor ARCHIRODON Construction (Overseas) Co. S.A
Port Said East Container Terminal
11- Surveyor EL Mansoura Petroleum Company
Preparing the sites and its roads of drilling for natural gas
12- Surveyor General Co. For Land Reclamation, Dev. & Recon.
Intakes 3&5&7 in El-Salam Canal
12- Surveyor Heliopolis Co. for Housing and Dev.
Group of resident building

Chief surveyor à ASEC for Engineering and Management
  • Egypte - Le Caire
  • juin 2012 à octobre 2013

we use the latest technology to perform the kiln hot alignment while the kiln is in normal operation such as
• Precise rollers and tyres diameters measuring device.
• Latest and most accurate total station -Trimble 5601 DR
• Accurate mini prisms and 360 prisms
Roller and tyres grinding restores their original cylindrical shapes and hence improve the area contact between them rollers and tyres grinding when carried out with the kiln hot alignment gives the best results and maximize their lifetimes ASEC uses specially designed machines for grinding:
• Rollers surfaces
• Tyres surfaces
• Tyres thrust face

Quantity surveyor à Besix-Orascom JV, Egypt
  • Egypte - Suez
  • novembre 2011 à mai 2012

•Prepare site layout & surveying work.
•The scope of civil works includes the construction of 3 pipelines totaling a length of approximately 5.1 km
•Prepare shop drawing.
•Controlling execution of work:
(Formwork, excavations, and backfilling)
•Make a surveying in each area.
•Issue inspection and test plan.
•Helping the site team and in preparing work procedure and method statement.

Éducation

Baccalauréat, math & computer dep
  • à B.SC. Sciences (math & computer dep.)
  • janvier 1996

Specialties & Skills

Total Station
Civil 3d
Auto Cad
Microsoft office Excel
Shop Drawing