Rajasekhar Reddy, Sr. Planning Engineer

Rajasekhar Reddy

Sr. Planning Engineer

Egis Rail

Lieu
Qatar - Doha
Éducation
Master, M.E. in Construction Engg and Management
Expérience
18 years, 10 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :18 years, 10 Mois

Sr. Planning Engineer à Egis Rail
  • Qatar - Doha
  • Je travaille ici depuis août 2015

1. Reviewing contractor’s work program including all narratives, Tilos, supporting information and provides analysis and findings, recommendations, acceptance / rejection of the Contractors base line schedule.
2. Assessment and tracking of critical paths and change in critical paths, float erosion & highlight the major activities leading to float erosion for key milestones.
3. Preparation of level 2 programme (PMC assessment) from contractors detailed programme for top management.
4. Development of micro level weightage tree to progress monitoring and SPI calculations.
5. Review of monthly and weekly programmes to meet with contractual and logical requirements.
6. Review of weekly and monthly progress reports and SPI calculations as per weightage tree.
7. Analyse gaps between the planned and actual progress and highlight the areas of concern which required action of the associate task member.
8. Extraction of planned, actual and forecast resource histograms, S curves and productivity analysis to support site team for monitoring purpose.
9. Assist station managers for programme review, critical activities analysis and for contractual letters preparations.
10. Evaluating Contractor’s Extension of Time requests and preparing recommendations to the Client.
11. Meetings with the contractors/ planners to improve the quality of programme & reporting.

Planning Manager à Afcons Infrastructure Ltd.
  • Inde - Chennai
  • janvier 2011 à juillet 2015

1. Preparation of Project Base line programme with resource loading, cost loading, activity coding system for client’s approvals.
2. Monitoring and controlling project with respect to resource deployment, cost monitoring & control time over-runs and quality compliance to ensure satisfactory execution of project.
3. Planning the execution of work as per approved schedules, drawings and contract specifications.
4. Coordinating with costing team for preparation of detailed budgets & cost status and dealing with inventory control & estimated cost at completion of the projects & KPIs.
5. Estimate and evaluate the major resource requirements considering the budgetary parameters.
6. Preparation of periodical weekly/monthly progress reports, achieved and forecasted productivity reports, Earned value management (SPI, CPI) & S curves for monitoring, major equipment planning, subcontractor planning, major material procurement schedule monitoring, major materials wastage monitoring.
7. Preparation of look ahead schedule & catch up schedule with available resources & risk analysis to mitigate the impacts of delay and cost overrun.
8. Effective presentation of program in pictorials for station constructions & preparation of time location diagrams for top management.
9. Preparations of accelerated programs proposal for timely completion of project to makeup the delays by client & natural calamities & delays by authorities.
10. Frequent site visits and interaction with the execution team for progress monitoring & improvements, change in sequence & methodology, guiding in technical issues.
11. Checking the design drawings & suggestions for modifications for ease of construction as per available resource, geographical conditions & to suite local law requirements and development of alternative effective methods for ease of work and affective productivity.
12. Preparation of effective station & tunnel logistic layouts (got appreciation from client for best tunnel logistic layout & Segment yard).
13. Conducting site level classrooms for briefing the methodology to site personals and do’s & don’t, importance of time cycle & utilisation of equipment, interrelation of activities & timely completions of activities.
14. Provides guidance, direction, and specialized assistance for
15. Provides guidance, direction, specialized assistance / training and manage a team of planners to take upon all planning, scheduling and reporting duties
16. Attends regular meetings with clients and interfaces parties and provides statistical reports.
a. Extension of time related works
17. Identification of delay events and variations, preparation of variation proposal, negotiating time and cost with the clients & consultants for variations orders as per contractual conditions & FIDIC clauses.
18. Preparation of individual impact fragment programs for the instructed variations and delay events, preparation of consolidated prospective & retrospective delay analysis for extension of time (EOT) at regular intervals (window analysis).

Sr. Planning Engineer à Afcons Infrastructure Ltd
  • Inde - Mumbai
  • juillet 2006 à décembre 2010

1. Tender stage planning & pre-start planning, preparation of salient features.
2. Prepare and submit the baseline construction schedule on behalf of site team for client approval.
3. Prepare resource distribution reports monthly/weekly from P6 for site team to review and follow-up.
4. Responsibility to site team and client regarding planning & action plans for progress.
5. Preparation of progress S-curve & earned value analysis for management (SPIs, CPIs).
6. Preparation of rolling accelerated & catch-up programmes in primavera.
7. Preparation of impacted programs for extension of time applications.
8. Comparisons of planned and actual time cycles and identify scope for improvements.
9. Preparation daily programme and weekly/monthly revision of programme to achieve the targets at site level and weekly / monthly monitoring & project co-ordination.
10. Preparation of site installation & logistic layouts, equipment plan & deployment schedule.
11. Preparation of general /detailed method statement, scheme and sequences of methods, time cycles, major brought out items & equipment required.
12. Development of alternative effective methods for ease, time & cost effective execution.

site engineer civil à S.P.Constructions
  • Inde - Chennai
  • juin 2003 à mai 2004

1. Review of design drawings and preparation of BBS, staging and shuttering schemes.
2. Effective supervising of manpower and ensure adequate materials and equipment availability.
3. Identify and develop vendor source for achieving cost effective purchase of materials, accessories & timely delivery of materials to site.

Éducation

Master, M.E. in Construction Engg and Management
  • à Anna University
  • avril 2006
Master, Construction Engg & Management
  • à Anna University
  • avril 2006

Master of Engineering in Construction Engineering and Management (CIVIL) in College of Engineering – Guindy, (Anna University), Chennai with GPA of 8.636/10 (Distinction) Year 2004 to 2006.

Specialties & Skills

Job Planning
Construction Methods
Project Management
Primavera P6
ENGINEERING
Primavera P6
MS Project
MS Excel

Langues

Anglais
Expert
Hindi
Moyen
Telugu
Langue Maternelle
Tamil
Moyen

Formation et Diplômes

Planning and Scheduling professional (PSP) by AACEI (Certificat)
Date de la formation:
October 2018
Qatar MMUP Certified Grade A Civil Engineer (Certificat)
Date de la formation:
March 2019

Loisirs

  • Playing Shuttle / Cricket