Project Leader
Olayan Descon
مجموع سنوات الخبرة :15 years, 1 أشهر
*** Project Handled at M/s Olayan Descon JV, Jubail, KSA (As a Project Leader) -
Supply, Design, Fabrication, Testing & Installation of Heat Exchangers (Shell & Tube, Air Fin Cooler), Retubing of heat exchangers, Columns, Reboilers, Pressure Vessels, Reactors, Flare Stack Tips, Towers, Piping, Storage Tanks, Pipe Rack, Platform & Skid Package (Dehydration Facilities, Oil Processing Systems, Separator Packages, Hydrocarbon Dewpoint Control, LPG Recovery, Sulphur Recovery Plants etc.) for Major Oil & Gas, Refineries, EPC, Power Generation Organizations like -
1) Saudi Aramco (Saudi Arabian Oil Company) Projects, Jazan Refinery Complex, Ras Tanura, Riyadh, Jeddah, Hawiya Plants (Direct Projects)
2) SABIC (Saudi Arabian Basic Industries Corporation), Sharq, Petrokemya South / North Projects
3) SASREF (Saudi Aramco Jubail Refinery Projects)
4) SATORP (Saudi Aramco Total Refining & Petrochemicals Co. Projects)
5) Técnicas Reunidas S.A. (TRSA)
6) NOV Inc. (NOV Saudi Arabia Co. Ltd.)
7) Ma'aden (Saudi Arabian Mining Co.)
8) Al Zamil Metal Works Factory LLC
9) Wison Engineering Company Ltd
10) National Industrialization Company (TASNEE)
11) Zeeco Middle East Ltd
Project Handled at Quality International Co. Ltd. (FZC) (As Sr. Planning & Project Engineer) -
1) M/s Chiyoda, CB&I and Saipem Joint Venture (CCS JV) -
Anadarko Mozambique LNG Project (Total) - CS/SS/Cladded Large/Normal/Small Size Drums -Stabilizer Columns, Amine Regenerators, Depropanizers, Debutanizers Pressure Vessels, Hydrogen Receiver Vessels, Amine Regenerator Reflux Drum, Deethanizer Reflux Accumulator, Compressor Suction Drum, Loading Arm Drain Collection, Gas Flare KO Drum Vessels (HP/LP), Propane Suction Drum, Amine Flash Separator, Drain Collector, Hydrocarbon Drain Vessel, Oil Expansion Drum, Instrument Air Receiver, Nitrogen Receiver Vessels etc (93 Vessels)
2) M/s Dollinger Filtration Ltd -
Anadarko Mozambique LNG Project (Total) - Liquid Filters, Gas Filters, Liquid Stainer, Liquid Carbon Filters, Gas Particulate Filters, Liquid/Gas Coalescer Filters (75 Vessels)
3) M/s Linde Engineering Middle East LLC -
Amur-Mixed Feed Cracker Unit in Russia (Amursky GCC) - Hydrogen Receivers, KO Drums, Liquid/Gas Separators, Collecting Drums, Reflux Drums, Sulphuric/Neutralization Drums etc. (38 Vessels)
Extensive experiences in Steel (MS, CS, SS, AL & Alloy Steel) Fabrication of Heat Exchangers, Boilers, Columns, Pressure Vessels, Storage Tanks, Heavy structures, Equipment, PEB, Pipe Racks, Skids, Waste Management, Process Lines in India, KSA, Kuwait, Bahrain & UAE. Having in-depth exposure to Project Execution, Production, Planning, Estimation in the Steel Fabrication field. Having extensive experience in various international fabrication related standards, special processes. Well-versed in project and resources planning and management, effective control of all resources, subcontracts planning and management.
Project Handled at Intertek India Pvt. Ltd. (Moody International) -
1) EWPL Cross Country Pipeline Project, Reliance India Ltd (M/s PIL) -
EWPL Connectivity to AGI Glaspac (M&R 38), MLV13 (Torrent Gas), MLV15 (Torrent Gas) & MLV19 (Unison Enviro), Construction, Fabrication, Erection/Installation, commissioning and handover to end user of Metering and Regulating Skids, Electrical Shed along with complete gas pipeline setup w.r.t. Civil, Mechanical, Piping, Electrical & Instrumentation works.
Projects handled (Hit-Ace Multi Fab Industries LLC, RAK, UAE) -
1) Pioneer Cement Industries LLC, Al Ghail, RAK (Azolis S.A. France) -
Fabrication, Erection and Modification of ORC Duct System (3.3 & 2.3 mtrs dia) which includes Transition Ducts, Conical Ducts, Reducer/Elbow Ducts, Dampers, FD Fan and Refractory work of 150 mm thick from Inside of ducts (Elv. Lvl +38.3 mtrs).
2) RAK White Cement Company (RAK Lime Company - Noora), RAK, UAE -
Fabrication, Erection and Modification of 1000 MT Steel Silo, Air slides, Screw Conveyors, Bag House, Sheds, Platforms, New Packing System (EPC Project) including Installation with Electrical Cables and Equipments.
3) Chemie-Tech LLC, UAE/Amsterdam/Malta/South Africa/KSA/Armenia/Zambia /Mauritius/Armenia (Projects) -
Fabrication and Painting of Structural Steel, Pipeline, Foam Rings, Cooling Rings, Storage Tanks, Pressure Vessels, Boilers, Pre Engineered Buildings (PEB), Sheds etc.
4) William Hare UAE LLC, UAE/USA/Kazakhstan/Oman (Proj.) -
Fabrication of Structural Steel like Bridges, Conveyor, Sheds, Warehouse, Pre Engineered Building, Pipe Supports, Towers etc.
Projects handled (PE FZE, Sharjah, UAE) -
1) GE Middle East FZE & Shams Al Sabah General Contracting Co. Ltd (Jurmat Group) for Zubair, Permanent Power Generation and Oil Field Development. Capacity
2) Chemie-Tech Malta Ltd for HAS-SAPTAN Malta, SS Rectangular Tank, Fuel Storage Facilities Project. Capacity - 12 Sets
3) Petrofac Emirates LLC for ZADCO, Upper Zakum 750K Project, Island Surface Facilities EPC2. Capacity - 5132 Tons
4) Petrofac E&C Oman LLC for BP Exploration LTD, Central Processing Facility, KHAZZAN Project. Capacity - 1510 Tons and 20, 120 LM of Handrails/Ladders
5) Daelim Petrofac SRIP JV for Sohar Refinery Expansion Project, Oman Oil Refineries & Petroleum Industries Company. Capacity - 1059 Tons
6) China State Construction Engg Corporation (ME) LLC, for Joint Venture (TAV, CCC & Arabtec), Client - Abu Dhabi Airports Company (ADAC), MTB Project, Abu Dhabi International Airport. Capacity - 6250 Tons
.
7) Thermax India Ltd for Daelim Industrial Co. Ltd, Yanbu KSA & SNC Lavalin, Turaif, KSA. Capacity - 835 Tons
8) ThyssenKrupp Fordertechnik GmbH (TKF), Dubai, UAE for Yanbu Refinery Project, Capacity - 2395 Tons
9) Diesel Storage Tanks, Contractors - STRABAG & Md. Al Mojil Group (MMG) for Command of Military Works, Abu Dhabi. Capacity Description - ID 11.2 Mtrs x 9.6 Mtrs Height
10) Scheduling, Planning, Execution of works/resources and preparation of BOQ from tender drawings as well as actual for Construction and Maintenance of 49 Public Buildings Project, Al Enmaa Real Estate Corporation, Neighborhood B, Sabah Al Ahmad City Housing Project, Ministry of Public Authority for Housing and Welfare, Kuwait.
Duties and Responsibilities at Aasia Steel Factory Co. Ltd, Al Jubail, KSA (As Production Engineer) -
1 Study of drawings for fabrication and solve drawing & other technical issues.
2 Preparation of BOQ as per drawing, raise purchase request and follow up/coordinate/assist with procurement department to get materials at right time.
3 Monitor daily, weekly, monthly and quarterly Fabrication/Production progress.
4 Prepare, update and forecast of production, progress reports & Load Chart.
5 Forecasting the requirements of production in order to achieve the production target.
6 Making most efficient utilization of the available sources for production.
7 Minimizing ‘throughput time’ and ‘work in process inventory’ by systematic production planning and also by very efficient execution of the plans.
8 Building team spirit among the workmen and also motivating by means of personal involvement.
9 Improving the productivity level of the workers on continuous basis by workmen’s training and by bringing into use the standards of the performance derived from work measurement studies etc.
10 Develop best practices and operational strategies to improve production capacity, quality and reliability.
11 Develop, coordinate, and monitor all aspects of production, including selection of manufacturing methods, fabrication and operation of product designs.
12 Plan production control activities to improve runtime while maintaining high quality, timely delivery and cost-effectiveness.
13 Establish safety procedures and environmental regulations for employees.
14 Provide engineering support for production, project and maintenance activities to ensure maximum production and continual improvement.
15 Implement cost reduction initiatives while maintaining high quality standards.
16 Provides training and guidance to team members to accomplish production goals.
17 Investigate problems, analyze root causes and derive resolutions.
18 Track material shortages and provide immediate resolution.
19 Identify delivery exception and provide alternative solutions.
20 Aid in budget preparation, monitor expenses and profitability.
21 Reducing the quality cost with the help of analysis of non conformances on periodic basis and also by following suitable actions (both corrective and preventive).
22 Plan equipment, material and manpower requirements to meet production schedule.
23 Evaluate production control activities to ensure that final product meets customer specifications.
Projects handled (ASCL, Jubail Industrial City, KSA) -
Cladding (Pipe line) Section -
1) Cladding (Inconel Overlay) and Fabrication of Production Relief, Stack, Cross over, Remote and Main Header, Tie in Manifold, Wellhead pipe spools, Manifold extension and miscellaneous Cladding (More than 500 Spools) for Saudi Aramco, VTC Hawiyah, Uthmaniyah and Dhahran Project, KSA. Job # AS-CL-002 & 003. Description - 4 Inch to 42 Inch Dia of Pipes and Fittings.
2) Cladding and Fabrication of Pipe spools with all fittings (Flanges, Tee’s, Elbows, Reducers, Tee - Reducers, Risers, Fittings etc.), Stack, Remote Headers, Relief headers, Manifold and other miscellaneous cladding for SAIPEM, Sharjah, UAE. Job # AS-CL-001.
Structure/Fabrication Section -
1) Fabrication of Stack shell (ø 10 Meters) base, body, supports, columns, panels, pipelines, pipe rack and other support structures (Total wt. - 3250 Tons) for Danieli Environment, Buttrio, Italy. Job # AS-BS-028.
2) Production/Fabrication (Total wt. - 6000 Tons) of Beam, Support beam, Column, Support Columns, Ladder, Girder, Handrail, Braces, Frames etc. for “Jubail Refinery Project - Saudi Aramco Project”, SK Engineering & Construction, Seoul, South Korea. Job # AS-BS-032.
Projects handled at SEPL, Pune, IND (As Mechanical Engineer) -
1) Fabrication, Installation/Erection at site and Commissioning of OWS & ETP (100KL/HR.) for Indian Oil Corporation Ltd (IOCL), Gandhidham, Gujrat.
2) Fabrication and Erection of Effluent Treatment Plant (75KL/HR. OWS) for Hindustan Petroleum Corporation Ltd. (HPCL), Bihta, Patna & Tikrikalan, Delhi.
3) Fabrication and Erection of White Oil Terminal (150KL/HR. OWS) for Hindustan Petroleum Corporation Ltd (HPCL) Vizag, Vishakhapatnam.
4) Fabrication and Erection of Oily Water Separator (100 KL/HR.) for Hindustan Petroleum Corporation Ltd (HPCL), Bhatinda, Punjab.
5) LPG (Liquefied Petroleum Gas) of Main ETP, Near Cylinder Wash Area, Degassing Shed of ETP for HPCL - Vizag, Visakhapatnam.
6) AMC (Annual Maintenance Commissioning) of ICGS (Razia Sultana - Orissa, Rani Jindan - Vizag, HabbahKhatun&Avvaiyyar - Chennai, Kasturba Gandhi- PortBlair), INS (Betwa and Karwar - Mumbai), CGHQ (Tatrakshak - Vishakha) and GRSE Kolkata (Yard No. - 3017 to 3020).
Duties and Responsibilities at L & T Ltd, Bangalore, IND (As Mechanical Supervisor) -
1 Was responsible for allocation of Manpower, Materials, Tools, Machineries and other resources.
2 Identify all issues in team and provide continuous support to all members according to operating standards on everyday basis.
3 Study drawings and preparations of BOM, MRR, QAP etc.
4 Planning, Scheduling, Assembly, Fabrication, Commissioning and handling pre-inspection of manufactured items.
5 Handle day to day production processes. Provides construction and erection information by compiling, initiating, sorting, and analyzing production performance records and data, answering questions and responding to requests.
6 Supervise effective working of production personnel and prepare effective production schedules and ensure compliance to all company policies.
7 Manage and prioritize all production processes and implement all production plans.
8 Completes production plan by scheduling and assigning personnel, accomplishing work results, establishing priorities, monitoring progress, revising schedules, resolving problems, reporting results of the processing flow on shift production summaries.
9 Maintains work flow by monitoring steps of the process, setting processing variables, observing control points and equipment, monitoring personnel and resources, studying methods, implementing cost reductions; developing reporting procedures and systems, facilitating corrections to malfunctions within process control points, initiating and fostering a spirit of cooperation within and between departments.